Mohammad Ranjbar
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Mohammad Ranjbar
- 3 years and 11 months, Aug 2015 - Jun 2019
FPSO - Construction, Commissioning, Start-Up and handover Manager
Iranian Offshore Oil Company (IOOC)
Responsibilities Oversee and direct construction activities from conceptual design to mechanical completion up to commissioning and Start-Up activities. Coordinated construction, installation and maintenance activities for engineering team to complete as per project specifications. Review studies and design reports, to make sure FPSO Cyrus construction is performed per industry codes and standards. (DNV, ASTM, ANSYS, ANSI, etc.)
- 2 years and 6 months, Mar 2013 - Aug 2015
FSU Khalij-E-Fars Offshore Installation Manager
Iranian offshore oil Company
Responsibilities • FSU Khalij-E-Fars Commissioning , Start-Up and Handover supervision • Execute and supervise dealings in accordance to commissioning guidelines and deadlines • Keep abreast in planning strategies to achieve project completion with available resources • Assist and guide project staff in outlining commission responsibilities • Promote company standards by ensuring accuracy of systems results
- 1 year and 2 months, Feb 2012 - Mar 2013
Nargesi Gas Gathering Compression & Injection EPC project Commissioning Manager
Iranian Offshore Oil Company (IOOC)
• Coordinate and direct construction workers and subcontractors • Prepare internal and external reports pertaining to job status • Revise Engineering study to modify Blow down and oily water treatment systems based on the availability of resources using Aspen Hysys. • Analyze, manage and mitigate risks • Develop Pre-commissioning, Commissioning & Startup Procedure as per End-user requirements and project specifications. • successful project Start-Up and handover to End-User
- 6 months, Sep 2011 - Feb 2012
Kish Gas Field Early Production basic design engineer
Iranian Offshore Oil Company (IOOC)
Responsibilities • Kish Gas Field Early Production Feasibility Study based on the Gas sample composition, production potentials and Consumer's requirements. • Basic Engineering Design using Aspen Hysys. • Develop basic engineering drawings and P&ID's using AutoCAD 2009
- 1 year and 6 months, Apr 2010 - Sep 2011
Nowrooz Offshore Installation Manager
Iranian Offshore Oil Company (IOOC)
Responsibilities • Contribute views on designs, constructions, proposals during management meetings • Conduct modification of two-phase separators into three- phase separators and new piping design. • Conduct successful commission and Start-Up of two THERMODYN gas export compressors • Conduct successful commissioning and Start-Up of Gas dehydration package.
- 2 years and 11 months, Jun 2008 - Apr 2011
Bahregan Shore Production Manager
Iranian Offshore Oil Company (IOOC)
Responsibilities • Bahregansar Shore development project Commissioning & Startup management • Bahregan Tank farm development ( 4 new floating roof storage tanks with a total capacity of 2 million Bulk Barrels ) project Commissioning & Startup management • Azadegan Storage and Export Facilities development project, Basic design study • Generating up to date P&ID's of old Facilities and plants using AutoCAD
- 6 years and 7 months, Dec 2001 - Jun 2008
FSU Head at Soroosh & Nowroz Integrated Development Project
Iranian Offshore Oil Company (IOOC) joint venture with Royal Dutch Shell
Responsibilities • FSU Soorena Commissioning & Handover supervision • Successfully supervised commissioning, Start-Up and calibration of crude oil metering skid. • Successfully conduct major overhaul and re-classification of 4 floating storage tanks as per Lloyd's rules and regulations. • Floating Crude oil export Terminal Management as per international rules and regulations, we achieved over 500 Crude Offloading operations.
- 4 years and 2 months, Nov 1997 - Dec 2001
Old Nowrooz Offshore Production Platform Shift controller
Iranian Offshore Oil Company (IOOC)
Responsibilities • Post-war Platform Repair and Re-startup team member • Undertaking the duty of Control Room Operator position • promoted as Shift controller to supervise production activities • promoted as deputy Offshore installation manager
Ausbildung von Mohammad Ranjbar
- 2 years and 6 months, Sep 2007 - Feb 2010
Chemical Engineering
Islamic Azad University Tehran north branch
My thesis was flow assurance study in offshore Sea-lines during pigging operations
- 5 years and 3 months, Sep 1990 - Nov 1995
Chemical Engineering
Petroleum University of Technology
Crude oil refinery Mass transfer operations heat transfer , heat exchanger and furnace design
Sprachen
English
C1 (Fließend)
German
B1-B2 (Gute Kenntnisse)
Turkish
B1-B2 (Gute Kenntnisse)
Persian
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.