Peter Wright

Power Systems - Engineer/Consultant/Manager, Beratech Ltd
Nicosia, Cyprus

Fähigkeiten und Kenntnisse

Worldwide experience in Power Station Construction
inc. Hydro
Thermal
(Coal
Gas & Nuclear-Magnox
BWR & PWR)
O&M and Safety Regulator experience
(Switzerland). Electrical Transmission & Distribu
Switchgear
Drives
Protection and Condition Monitoring. I&C
DCS/SCADA installation experience (Emerson Ovation
ABB Advant/Procontrol). S/W exp. MATLAB/SIMULINK (
ETAP5
CYME packages
MS Enterprise 2007
inc. advanced Excel programming. Training of Commi
Standby & Emergency Plant
Coordination of Maintenance and HSE-Permit-to-Work

Werdegang

Berufserfahrung von Peter Wright

  • 5 months, Apr 2009 - Aug 2009

    Commissioning Manager

    Alstom Hydro Ltd.

    Commissioning Manager for Alstom Hydro Ltd – Merowe-Hydro Project-Sudan Leader of Commissioning team, (20 - 30 technicians), commissioning 1250MW hydro electric station. Plant has 10x140MVA generators, 15 x 290MVA 1ph. 13.8/550kV transformers, ABB 550kV GIS switchgear, auxiliary pumps, air compressors, HV & Air Conditioning, dam water control gates/sluices Alstom S8000 bus & P320 DCS. Management, coordination, troubleshooting, technical problem solving and daily progress reporting to Consultant/Owner

  • 1 year, May 2008 - Apr 2009

    Site Manager

    Fichtner GmbH

    Site Manager for consultants team overseeing construction & commissioning of a 1200MW anthracite/coal fired station, 4x 300MW steam turbine units and subcritical boilers, supplied by Shanghai Electric Corporation/Bechtel & Alstom China. Responsible for Staff Administration and Accommodation, Site Finance & Petty Cash, Transport, Issuance of all Design Review & Non Conformance reports, HSE & Site Inspections with follow-up. Chairing weekly meetings with Client and EPC Contractor.

  • 3 months, Feb 2008 - Apr 2008

    Senior Resident Engineer

    Lahmeyer International

    Lenders Engineer for Reconstruction-Credit- Institute – (KfW) on short term freelance contract in Afghanistan, (Sarobi 26MW & Mahipar 75MW Hydro Power plants near Kabul). Responsible for overseeing end-of-contract, hand-over & completion activities by contractor Voith-Siemens as Resident Engineer. Also active in planning next phase of project, liasing with local Afghan Ministry of Energy & Water.

  • 1 year and 2 months, Jan 2007 - Feb 2008

    Project Manager/Owners Engineers Representative

    Parsons Brinckerhoff

    Owners Engineer for PNG Power, the solely government owned Electricity utility. Project involved Hydro Power Plant rehabilitation near P.Moresby. Responsibilities included overseeing & supervision of the Hydro Turbine/Generator rehabilitation and Balance-of-Plant restoration.

  • 7 months, Jul 2006 - Jan 2007

    Senior Resident Engineer

    Parsons Brinckerhoff

    Electrical R.E. at Kogan Creek Power Station Chinchilla Queensland, Australia. Responsible for overseeing construction, carrying out inspections, monitoring quality, performance, documentation and work methods/planning. Main contractor Siemens AG. on plant including supercritical 1x750MW dry cooled steam turbine generator, boiler feed/condensate pumps, FD/ID fans, transformers, switchgear, protection, emergency power supplies etc.

  • 1 year and 5 months, Mar 2005 - Jul 2006

    Technical/Commercial Adviser

    United Nations

    Contract with UNDP - Iraq, based in Nicosia Cyprus and Amman Jordan. Employed on Japanese (JBIC) funded rehabilitation contracts for 3 Iraqi Power Plants (with Hitachi as main contractor), for steam & gas turbines, boilers, water pumping and sanitation projects, repairs/new system installation for Iraqi grid transmission networks and nationwide 400/132kV SCADA system (value US$30m) . Entailed writing specifications, making commercially oriented comparisons for scopes-of-work and equipment.

  • 2 years and 8 months, Jun 2002 - Jan 2005

    Specialist

    Swiss Nuclear Safety Inspectorate

    Specialist Engineer as Member of Electrical and Mechanical Machinery Section responsible for plant and equipment condition assessment/determination of generating plant reliability, ageing, safety and risk. Responsible for co-ordinating the inspection of large pumps, pipework and Emergency Generating Plant, sanctioning plant modifications and installations at 4 Swiss Nuclear Power Plants (2 x BWR, 2 x PWR).

  • 3 years and 8 months, Nov 1998 - Jun 2002

    Project Manager Engineer

    Sulzer/MAN Zuerich

    Responsible for evaluating and generating technical & commercial proposals, FEED studies, designs, and engineering specifications for high-speed, axial & centrifugal turbo compressor plant using gas turbine or electric motor drivers with ratings of 5 to 30MW. Activities mainly concerned with offshore oil & gas platforms or FPSO´s. Member of development team for encapsulated high speed, direct-drive compressors with speed range 10'000 to 18'000rpm. Specialist with regard to variable frequency drives.

  • 5 years and 6 months, Apr 1993 - Sep 1998

    Project Manager/Engineer

    Caterpillar Inc.

    Project management & Engineering involving CAT 3600 Engine product. Supervision of sub-contractors & suppliers. Installation & Commissioning of large/complex diesel & natural gas fuelled co-generation/CHP units and balance of plant.

  • 7 years and 4 months, Jul 1986 - Oct 1993

    Project Manager

    ABB Power Generation AG

    Project Manager/Engineer in team concerned with modernization and retrofitting utility steam turbine generators and control/SCADA systems. Specialized on turbine electrohydraulic governors and controls.

  • 1 year and 4 months, Apr 1985 - Jul 1986

    Resident Engineer

    Kennedy & Donkin

    Electrical R.E. at Nkula "B" Hydro Power Station - Malawi, for planned extensions. Main Contractors AEG (generator), Voith (40MW Francis Turbine).

  • 7 years and 4 months, Jan 1978 - Apr 1985

    Electrical Plant Design Engineer

    Industrial Electrical (Pty) Ltd

    Responsible for design, installation & commissioning of power plant, large drive systems and industrial controls in:- Power station Balance of Plant/ Mining Industries (gold, platinum & diamond)/ Metallurgical/Steel Industry

  • 4 years and 11 months, Mar 1973 - Jan 1978

    Generation Engineer

    Escom, S. Africa

    Operation & Maintenance in an Electricity Supply utility esp. small hydro electric schemes, 200km 132kV transmission line, 150km 22/33kV rural distribution networks, telecontrol & SCADA systems, Islanded rural diesel power generation.

  • 6 years and 7 months, Sep 1966 - Mar 1973

    General Assistant Engineer

    CEGB S.W. Region Bristol U.K.

    Nuclear Power station Fuel route Operation & Maintenenance, especially on-line reactor refuelling machinery and remote handling equipment.

  • Power Systems - Engineer/Consultant/Manager

    Beratech Ltd

    Presently working together with MAN Diesel & Turbo in Augsburg Germany. Involved with commissioning of Gas reciprocating engines, (ca. 18MW) projects around the world.

Ausbildung von Peter Wright

  • 3 years, Sep 1969 - Aug 1972

    Electrical & Electronic Engineering

    University of the West of England

    Electrical Machines Electrical Technology Industrial Automation Radio Communication

Sprachen

  • English

    C2 (Verhandlungssicher / Muttersprachlich)

  • German

    B1-B2 (Gute Kenntnisse)

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 21 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z