
Peter Wright
Suchst Du einen anderen Peter Wright?
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Peter Wright
- 5 Monate, Apr. 2009 - Aug. 2009
Commissioning Manager
Alstom Hydro Ltd.
Commissioning Manager for Alstom Hydro Ltd – Merowe-Hydro Project-Sudan Leader of Commissioning team, (20 - 30 technicians), commissioning 1250MW hydro electric station. Plant has 10x140MVA generators, 15 x 290MVA 1ph. 13.8/550kV transformers, ABB 550kV GIS switchgear, auxiliary pumps, air compressors, HV & Air Conditioning, dam water control gates/sluices Alstom S8000 bus & P320 DCS. Management, coordination, troubleshooting, technical problem solving and daily progress reporting to Consultant/Owner
- 1 Jahr, Mai 2008 - Apr. 2009
Site Manager
Fichtner GmbH
Site Manager for consultants team overseeing construction & commissioning of a 1200MW anthracite/coal fired station, 4x 300MW steam turbine units and subcritical boilers, supplied by Shanghai Electric Corporation/Bechtel & Alstom China. Responsible for Staff Administration and Accommodation, Site Finance & Petty Cash, Transport, Issuance of all Design Review & Non Conformance reports, HSE & Site Inspections with follow-up. Chairing weekly meetings with Client and EPC Contractor.
- 3 Monate, Feb. 2008 - Apr. 2008
Senior Resident Engineer
Lahmeyer International
Lenders Engineer for Reconstruction-Credit- Institute – (KfW) on short term freelance contract in Afghanistan, (Sarobi 26MW & Mahipar 75MW Hydro Power plants near Kabul). Responsible for overseeing end-of-contract, hand-over & completion activities by contractor Voith-Siemens as Resident Engineer. Also active in planning next phase of project, liasing with local Afghan Ministry of Energy & Water.
- 1 Jahr und 2 Monate, Jan. 2007 - Feb. 2008
Project Manager/Owners Engineers Representative
Parsons Brinckerhoff
Owners Engineer for PNG Power, the solely government owned Electricity utility. Project involved Hydro Power Plant rehabilitation near P.Moresby. Responsibilities included overseeing & supervision of the Hydro Turbine/Generator rehabilitation and Balance-of-Plant restoration.
- 7 Monate, Juli 2006 - Jan. 2007
Senior Resident Engineer
Parsons Brinckerhoff
Electrical R.E. at Kogan Creek Power Station Chinchilla Queensland, Australia. Responsible for overseeing construction, carrying out inspections, monitoring quality, performance, documentation and work methods/planning. Main contractor Siemens AG. on plant including supercritical 1x750MW dry cooled steam turbine generator, boiler feed/condensate pumps, FD/ID fans, transformers, switchgear, protection, emergency power supplies etc.
- 1 Jahr und 5 Monate, März 2005 - Juli 2006
Technical/Commercial Adviser
United Nations
Contract with UNDP - Iraq, based in Nicosia Cyprus and Amman Jordan. Employed on Japanese (JBIC) funded rehabilitation contracts for 3 Iraqi Power Plants (with Hitachi as main contractor), for steam & gas turbines, boilers, water pumping and sanitation projects, repairs/new system installation for Iraqi grid transmission networks and nationwide 400/132kV SCADA system (value US$30m) . Entailed writing specifications, making commercially oriented comparisons for scopes-of-work and equipment.
- 2 Jahre und 8 Monate, Juni 2002 - Jan. 2005
Specialist
Swiss Nuclear Safety Inspectorate
Specialist Engineer as Member of Electrical and Mechanical Machinery Section responsible for plant and equipment condition assessment/determination of generating plant reliability, ageing, safety and risk. Responsible for co-ordinating the inspection of large pumps, pipework and Emergency Generating Plant, sanctioning plant modifications and installations at 4 Swiss Nuclear Power Plants (2 x BWR, 2 x PWR).
- 3 Jahre und 8 Monate, Nov. 1998 - Juni 2002
Project Manager Engineer
Sulzer/MAN Zuerich
Responsible for evaluating and generating technical & commercial proposals, FEED studies, designs, and engineering specifications for high-speed, axial & centrifugal turbo compressor plant using gas turbine or electric motor drivers with ratings of 5 to 30MW. Activities mainly concerned with offshore oil & gas platforms or FPSO´s. Member of development team for encapsulated high speed, direct-drive compressors with speed range 10'000 to 18'000rpm. Specialist with regard to variable frequency drives.
- 5 Jahre und 6 Monate, Apr. 1993 - Sep. 1998
Project Manager/Engineer
Caterpillar Inc.
Project management & Engineering involving CAT 3600 Engine product. Supervision of sub-contractors & suppliers. Installation & Commissioning of large/complex diesel & natural gas fuelled co-generation/CHP units and balance of plant.
- 7 Jahre und 4 Monate, Juli 1986 - Okt. 1993
Project Manager
ABB Power Generation AG
Project Manager/Engineer in team concerned with modernization and retrofitting utility steam turbine generators and control/SCADA systems. Specialized on turbine electrohydraulic governors and controls.
- 1 Jahr und 4 Monate, Apr. 1985 - Juli 1986
Resident Engineer
Kennedy & Donkin
Electrical R.E. at Nkula "B" Hydro Power Station - Malawi, for planned extensions. Main Contractors AEG (generator), Voith (40MW Francis Turbine).
- 7 Jahre und 4 Monate, Jan. 1978 - Apr. 1985
Electrical Plant Design Engineer
Industrial Electrical (Pty) Ltd
Responsible for design, installation & commissioning of power plant, large drive systems and industrial controls in:- Power station Balance of Plant/ Mining Industries (gold, platinum & diamond)/ Metallurgical/Steel Industry
- 4 Jahre und 11 Monate, März 1973 - Jan. 1978
Generation Engineer
Escom, S. Africa
Operation & Maintenance in an Electricity Supply utility esp. small hydro electric schemes, 200km 132kV transmission line, 150km 22/33kV rural distribution networks, telecontrol & SCADA systems, Islanded rural diesel power generation.
- 6 Jahre und 7 Monate, Sep. 1966 - März 1973
General Assistant Engineer
CEGB S.W. Region Bristol U.K.
Nuclear Power station Fuel route Operation & Maintenenance, especially on-line reactor refuelling machinery and remote handling equipment.
Power Systems - Engineer/Consultant/Manager
Beratech Ltd
Presently working together with MAN Diesel & Turbo in Augsburg Germany. Involved with commissioning of Gas reciprocating engines, (ca. 18MW) projects around the world.
Ausbildung von Peter Wright
- 3 Jahre, Sep. 1969 - Aug. 1972
Electrical & Electronic Engineering
University of the West of England
Electrical Machines Electrical Technology Industrial Automation Radio Communication
Sprachen
Englisch
Muttersprache
Deutsch
Gut
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.