
Dipl.-Ing. Po-Jen Lin
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Po-Jen Lin
- Bis heute 8 Jahre und 8 Monate, seit Sep. 2016
Management & Controlling
HNO (ENT) Praxis
• Management & Controlling of Praxis Organization • Accountant (Buchhaltung)
- 2 Jahre und 1 Monat, Mai 2011 - Mai 2013
BSAQ/AWS Engineer
Ford-Werke GmbH
• Subject Expert of Analytical Warranty System & Balanced Single Agenda for Quality in Asia • Early Claims Binning / Quality Analysis Reporting Systems analysis & correction • New Customer Concern Codes implementation & cascade • Coordination of the change of new engineering code in global forum • Analyzed the quality index: Cost per Unit and Repair per Thousand for the change of engineering codes • Product quality & warranty data analysis • Trainer for Analytical Warranty System
- 1 Jahr und 5 Monate, Jan. 2010 - Mai 2011
Supply Chain Management
Ford-Werke GmbH
• Inventory control • Parts shortage analysis & prevention • Wrong and short shipment claims • Transitional time assessment & setup • Transportation cost evaluation • Supplier capacity management • Negotiation of parts procurement with suppliers • Achievement of 100% parts procurement for new model launch programs • Achievement: 500,000 € annual saving for Customer Service Division in and 28,000 € cost saving for the phase-out vehicle in 2010
- 7 Monate, Juli 2009 - Jan. 2010
Quality Assurance Engineer
3M Company
• National & international customer claim handling for SMS (Surface Mount Supply) product. • G8D report approval • Preventive action implementation and validation in production line • Coordinated and executed quality improvement activities in plant • Responsible for customer’s assessment, auditing and customer survey follow-up • Executed measuring method & quality procedure • Implemented safety health environmental policy and procedures
- 11 Monate, Feb. 2008 - Dez. 2008
Project Assistant
Australian Council for Educational Research
• General office administration functions & educational project support • English language skills improvement
- 1 Jahr und 7 Monate, Juni 2006 - Dez. 2007
Quality Engineer
Ford-Werke GmbH
• Liaised with Supplier Technical Assistance to implement Permanent Corrective Action at supplier • Verified engineering spec. of parts against drawings • Raised Quality Reject report & tracked quality concerns until closure with G8D report • Supplier chargeback • Achievement: Part x Part claim accepted 74%; Chargeback 30,000€; Reworked claims accepted 72% • Achievement: Complete Knock Down claim: Replacement accepted 80%; Reworked claims accepted 71%
Ausbildung von Po-Jen Lin
- 1 Jahr und 11 Monate, Sep. 2002 - Juli 2004
Mechanical Engineering
National Taiwan University
National Taiwan University (2019 QS World University Ranking Nr. 69) and I enrolled in the Laboratory of Polymer Processing and finalized master thesis was “The Application of Ceramic Powder In Micro-Injection Molding”.
- 1 Jahr und 11 Monate, Sep. 2000 - Juli 2002
Mechanical Engineering
National Taiwan University of Science and Technology
Final average grade is 8.82% among the 34 Students.
- 4 Jahre und 11 Monate, Sep. 1995 - Juli 2000
Automation
National Formosa University
My final grade ranked the 4th among the 50 students, and got the best grade in English in the whole class.
Sprachen
Chinesisch
Muttersprache
Englisch
Fließend
Deutsch
Fließend
Taiwanese
-
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.