
Ramon Fouladi
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Ramon Fouladi
- Bis heute 9 Jahre und 2 Monate, seit Juni 2016
Design Manager
MAPNA BOILER Co. (HRSG & BOILER DESIGN & MANUFACTURING)
+Main duties: Leadership activities along with deeply technical engagement with different disciplines in design department +Key Achievements: *Successfully improving and developing leadership and managerial skills in challenging atmosphere. *Improving efficiency and productivity within Design organization and also profitability for company. *Implementing Standardization and Automation of Design documents and activities. *Deep knowledge in design of HRSG/Boiler and involving in new products
- 9 Jahre und 2 Monate, Mai 2007 - Juni 2016
Thermal, Process and Equipment Design manager
MAPNA Boiler Co.
+Main duties:Design activities regarding Basic (thermal & hydraulic) design of HRSG and boilers, Process design, Rotating equipment engineering, technical proposal preparation, Leadership activities
- 10 Monate, Aug. 2006 - Mai 2007
Thermal, Process, Equipment Engineer
MAPNA BOILER Co.
+Main duties:Design activities regarding Basic (thermal & hydraulic) design of HRSG and boilers, Process design, Rotating equipment engineering, technical proposal preparation
- 1 Jahr und 2 Monate, Juli 2005 - Aug. 2006
Process & Rotary Equipment Engineer
NOANDISHAN ARIA Co.
+main duties: Process design of different projects, Rotating equipment engineering, proposal preparation, technical coordination activities
- 6 Monate, Feb. 2005 - Juli 2005
Mechanical Engineer
MAPNA Co.
+Main duties: Responsible for Design review of Foster Wheeler’s documents regarding HRSG of Mobin project and participating in HAZOP meeting, Responsible for subcontractors of Fuel supply system, water supply system, firefighting, waste water system of Chehel Sotoon GT Power Plant
- 10 Monate, Mai 2004 - Feb. 2005
Sales Engineer
SIEMENS
+Main duties: *Sales engineer technical activities regarding centrifugal compressors, industrial gas turbines & steam turbines and their relevant after sales services such as supplying the spare parts. +Key achievements: *Becoming expert in rotating equipment such as centrifugal compressors, industrial gas turbines, industrial steam turbines through on job training
- 7 Jahre und 5 Monate, Jan. 1997 - Mai 2004
Process & Equipment Design Engineer
AZAR AB Co.
+Main duties:Design activities regarding Basic (thermal & hydraulic) design of HRSG and boilers, Process design, Rotating equipment engineering, technical proposal preparation. +Key achievements: * Becoming expert in equipment engineering (Pump, Deaerator, Chemical dosing system, Diverter damper, Burner, Fan, Sampling system, Stack damper) and also in process design
Sprachen
Englisch
Fließend
Deutsch
Grundlagen
Persian
-
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.