
SEDAT KOÇANAOĞULLARI
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von SEDAT KOÇANAOĞULLARI
- Bis heute 5 Jahre, seit Juni 2020
Mechanical Design Engineer
Genius Design
- Bis heute 6 Jahre, seit Juni 2019
Small Business Owner
GENIUS Engineering & Mechanical Design - https://www.geniusmuhendislik.com.tr/
Consultancy / Mechanical Engineering @ Mechanical Design - Solidworks -Autocad -Inventor - Workshop - Machining Consultancy / Mechanical Engineering @ Project Management - Equipment, Steel, Pipe Construction Work - Oil & Gas - Energy - Mining -Industry
- Bis heute 12 Jahre und 3 Monate, seit März 2013
Equipment Erection Engineer
YAMATA / ЯМАТА Yatırım A.Ş.
Rusvinil PVC project Nizhninovgorod - Russia / Equipment Installation, commissioning and start-up Engineer РУСВИНИЛ ПВХ проекта Нижний Новгород - Россия / Монтаж оборудования, инженер
- Bis heute
Equipment Erection Engineer
ENKA EPF/CPF Project - Basra - IRAQ IRAQ
- 2 Jahre und 4 Monate, Okt. 2009 - Jan. 2012
Çelik- Mekanik Proje müh. - (Makine Mühendisi)
SELEN mühendislik
- 1 Jahr und 1 Monat, Sep. 2008 - Sep. 2009
Site Engineering , Piping Engineering
GAMA - Pearl GTL Project / QATAR
Among the Shell’s major project, Pearl GTL is the world’s largest plant, converting natural gas into clean-burning liquid transportation fuel and other high-value products . I served structural erection as a site engineer also worked piping erection as a piping engineer at Air Separation Unit’s construction.
- 1 Jahr und 11 Monate, Juli 2006 - Mai 2008
production manager
ASFI Steel&Construction -
I worked as a production manager. During my serve, company has accomplished a projects such as ; Çanakkale AKÇANSA cement factory’s 2nd clinker lines and Coal Grinders all structural steel members have fabricated. Estimate project weight about 600 tones and accomplished with 30 workers and 1 foreman in 6 month. During commissioning extra steel works provided. Line is operating now. Also I worked at various type and capacity of coal, raw materials and clinker mills body parts and components fabricatio
- 2004 - 2006
site engineer, maintain engineer
HABAS (Combined Cycled Power Plant)
Site Engineering; * Responsible for implementing, administering erection and commissioning of systems such as gas turbines, heat recovery boilers, steam turbines and other auxiliary equipments. * Study and analyze all erection & fabrication drawings and pertinent documents for erection. * Attend and participate in meetings with Vendor to analyze of schedules and targets. * Witnessing the quality testing (ie, UT, DPT) and checking lines with QA-QC inspector
- 2003 - 2004
Design Engineer
Ektam Machinery c.o. -
Design Engineering; * Detail Design and Engineering of Bottling lines, Foundations, Equipment and Components in rinsing, filling, capping, packaging etc. * Prepare and Coordination Assembly & Fabrication drawings, Billing of Materials lists and pertinent documents for fabrication * Ensure that design is in accordance with all project criteria and in compliance with design guides, standards, specifications, regulations and procedures.
- 2001 - 2002
owner
Türker Makine Ata San. Sit Çi
* Detail Design, Engineering and fabricate of S.F.A.P. machines. * Create organizational/technical procedures/manuals for Design and supervise process. * Reviewing and analyzing Scope of Work, calculate estimate costs. Monitoring budget. * Establish price analysis and cost estimation of project works and review in case of change order or, not specified in the contract. * Prepare Contract Documents, Price lists according to calculated costs.
Şantiye Şefi
ASKAY
www.askay.com.tr