Sameh Omran

Bis 2008, Section Engineer-Piping, Consilidated Conractors Company CCC

Abu Dhabi, Vereinigte Arabische Emirate

Fähigkeiten und Kenntnisse

Mechanical Engineering Degree
Sufficient experience in piping construcion roll
Strong Desire to succeed and to meet targets
Independent
Strong analytical and organization skills.

Werdegang

Berufserfahrung von Sameh Omran

  • Bis heute 16 Jahre, seit Juli 2008

    Section Engineer-Piping (Hydro Testing)

    Consilidated Conractors Company CCC

    I was engaged to Habshan Gas Complex Expansion Project as a Section Mechanical Engineer. Estimated Project value is around U$ 400M. Responsibilities were -included but were not limited-to oversee hydro-testing activity of all piping networking’s systems and, indeed, to take control of Test Pack center together with test packs movement and closure among all corresponded disciplines.

  • 3 Jahre und 3 Monate, Mai 2005 - Juli 2008

    Section Engineer-Piping

    Consilidated Conractors Company CCC

    I was engaged as a Section Mechanical Engineer to the U$ 90M in value, an EPC project, Isomerisation and Refinery Revamp Project, to supervise the execution of the Underground functional networking piping erection in line with all piping networking systems hydro testing activity in line with its - Test Packs – movement and closure among all corresponded disciplines.

  • 9 Monate, Sep. 2004 - Mai 2005

    Section Engineer

    Consolidated Contractor Company

    I was engaged as a Site Mechanical Superintendent in the construction of a 24" crude oil pipeline project. Indeed, I was enrolled in all activities inclusive in mechanical division and activities on behalf of civil division.

  • 1 Jahr und 5 Monate, Apr. 2003 - Aug. 2004

    Site Engineer-Piping

    Consolidated Contractors Company

    I was participating in the construction of the U$160 M Fertilizer Plant Project. I was assigned as a Site Mechanical Engineer in the excution of piping erection.

  • 1 Jahr und 11 Monate, Mai 2001 - März 2003

    Site Engineer

    Consolidated Contractors Company

    I was engaged as a Site Mech. Engineer to the 32” Gas Pipe-Line Project . The project estimated length is 301 Km and a value of U$ 120M.

Ausbildung von Sameh Omran

  • 5 Jahre und 5 Monate, Okt. 1995 - Feb. 2001

    Mechanical Engineering

    Applied Science University

Sprachen

  • Englisch

    Fließend

  • Arabisch

    Muttersprache

Interessen

Internet
Fishing
Reading.

21 Mio. XING Mitglieder, von A bis Z