Sarah Follmann
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Sarah Follmann
- Bis heute 7 Jahre und 7 Monate, seit Nov. 2017
Grid Connection Manager/ Principal Consultant Engineer
WSP UK
I am overseeing a portfolio of grid connection schemes from acceptance to energisation and close out. Schemes mainly connect battery storage, gas, solar and wind. In addition I provide development advice to the WSP’s Renewables team on grid connection and electrical system aspects. WSP frequently works as the role of TA and OE for project developers and I have experience in dealing with developers at various stages of the development cycle on international Renewable projects.
- 5 Monate, Feb. 2017 - Juni 2017
Site based OE - UK
Project Advisors International (U.K.) Ltd
Site based OE for the connection aspect of the East-West Interconnector HVDC link into National Grid's 400kV substation.
- 1 Jahr und 3 Monate, Juni 2015 - Aug. 2016
Distribution Team Leader - Energy Division -UK
WSP / Parsons Brinckerhoff - UK
Technical role as before with additional line managerial responsibility for 10 professional engineers and an interface to the company's Renewables team including representing a Renewables Developer as Owner’s engineer for the BoP and grid connection element for a large UK wind farm.
- 9 Monate, Okt. 2014 - Juni 2015
Project Manager / Senior Consultant Distribution Engineer - UK
Parsons Brinckerhoff/ WSP- UK
Representing a Distribution Network Operator as Project Manager for Renewable Connections (Wind, Solar, Biomass). Full responsibility for the Project Management and Engineering of projects from the concept design and engineering, tender evaluation, contract award through to design verification, construction, testing, commissioning and defect liability.
- 8 Monate, März 2014 - Okt. 2014
Project Manager / Senior Consultant Substation Engineer - South Africa
Parsons Brinckerhoff/WSP - South Africa
Project management and design development for T&D and Renewables projects across Africa including acting as owner’s or lender’s engineer • Liaising with international customers, sub-consultants and suppliers • Managing multidisciplinary project teams • Producing and reviewing tender specifications to World Bank format • Environmental scoping and resettlement implication review
- 1 Jahr und 10 Monate, Mai 2012 - Feb. 2014
Project Manager / Senior Consultant Engineer-UK
Parsons Brinckerhoff
- 2 Jahre und 1 Monat, Apr. 2010 - Apr. 2012
Project Manager / Senior Project Engineer -Energy Division - UK
Siemens plc, UK
Successfully managed a large 132/11 kV substation replacement project for Western Power Distribution in the city of Birmingham. This major project comprised of the full feasibility development and design and built project implementation of an indoor HIS solution, transformers and 11 kV substation.
- 2 Jahre und 6 Monate, Okt. 2007 - März 2010
Project Engineer - Energy Devision- UK
Siemens plc, UK
Project engineering and management on feasibility design and turnkey contracts in the Distribution Network Operators business areas.
- 1 Jahr, Sep. 2006 - Aug. 2007
Graduate Trainee
Siemens plc, UK
Tailored shortened Graduate Development Programme to gain an overview of Siemens' core power business areas including engineering, manufacturing, construction, finance and procurement • Familiarisation with Siemens’ processes and practices • Advanced training in management, commercial and soft skills areas • Internal and external networking
- 3 Jahre und 1 Monat, Aug. 2002 - Aug. 2005
Project Engineer / Project Manager
Cegelec GmbH
Successful contract delivery for BoP projects in the international industrial and power sector • Project managing experience and skills • Understanding of the business sector in an international field • Technical experience of medium and low voltage distribution systems • Financial and commercial understanding • Managing multinational project teams
Ausbildung von Sarah Follmann
- 1 Jahr, Okt. 2005 - Sep. 2006
Sustainable Electricity Systems
University of Manchester
Generation for sustainable systems, integration of distributed generation, power systems analysis and modelling, economics of power systems and HV engineering. MSc project “Measurement of Partial Discharge within power electronic systems” - patent registered and IEEE journal paper published
- 4 Jahre und 7 Monate, Okt. 1997 - Apr. 2002
Electrical Power Engineering
Hochschule Trier - Trier University of Applied Sciences
Sprachen
Deutsch
Muttersprache
Englisch
Muttersprache
Französisch
Grundlagen
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.