Semih Serdar Kayar
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Semih Serdar Kayar
- Bis heute
Mechanical Engineering
---
- 3 Jahre und 9 Monate, Juni 2019 - Feb. 2023
Mechanical Completion Engineer
isker
* Tracking Construction status * Handover of each subsystem along with a complete dossier. * Obtaining the Mechanical Completion certificate and conducting a mechanical completion walkdown with the client. * Creating a final list of outstanding items that is agreed upon with the authorized system owner. * Ensuring the completion of outstanding items in coordination with the relevant departments (Construction and Engineering)
- 5 Jahre und 7 Monate, Dez. 2013 - Juni 2019
Maintenance Superintendent
Sumitomo Rubber Europe GmbH
o Preparation and analysis of Preventive Maintenance Plans with respect to the targets o Managing of Maintenance Budget, Making PDCA to improve o Preparation of Trouble reports and deep analyzing and taking actions, o Performing monthly PM meetings o Root Cause Analysis and Planning Actions related with Breakdowns o Planning and Performing Energy saving activities
- 1 Jahr und 7 Monate, Juni 2012 - Dez. 2013
Mechanical Works Site Engineer
Tekfen İnşaat
Responsible from mechanical installation works including storage tanks, equipments and piping works.
- 1 Jahr und 4 Monate, Jan. 2011 - Apr. 2012
Equipment Erection Superintendent
Tekfen İnşaat
Responsible for mechanical installation works and preservation of equipment
- 2 Jahre, Dez. 2008 - Nov. 2010
Equipment Installation Superintendent
Tekfen İnşaat
- 4 Jahre und 2 Monate, Okt. 2006 - Nov. 2010
Mechanical Installation Superintendent
GATE
Responsible for mechanical installation works and preservation of equipments. This is an Engineering Procurement and Constructing Project of GATE where the main project material supplier is General Electric. This is an expansion for the plant as 3rd Unit. It has 2x42MW Gas Turbine Equipment Erection Superintendent in the Mechanical Works Department. Responsible for installation and testing of static and rotating equipments
- 2 Jahre und 3 Monate, Okt. 2006 - Dez. 2008
piping supervisor
Tekfen İnşaat
Piping Engineer in the Underground Piping Department. Responsible for fabrication, erection and testing of Carbon Steel and High Density Polyethylene underground piping systems which are fire water and oily water.
- 1 Jahr und 2 Monate, Mai 2005 - Juni 2006
Junior Mechanical Engineer
Temsa A.Ş.
Bus Assembly line & Design engineer
Ausbildung von Semih Serdar Kayar
- 5 Jahre und 11 Monate, Okt. 1999 - Aug. 2005
Mechanical Engineering
Çukurova Üniversitesi
PIV,Particle image velocimetry.
Sprachen
Englisch
-
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.