Navigation überspringen

Sourabh Sharma

Angestellt, Senior Project Engineer, Bechtel
London, Vereinigtes Königreich

Fähigkeiten und Kenntnisse

Railway
Light Rail
Power Distribution
Electrical Design
Electrical Engineering
Power Supplies
Switchgear
Contractor
Engineering
Supervisory Skills
Tender
Design Management
Value Engineering
Project Engineering
Feasibility Studies
Civil Engineering
Construction Management
Commissioning
Construction
Manufacturing
Engineering Management
Cost Management
Traction Power
Risk Management
Project Management
Building Services
MEP
AC and DC Electrification
Substation Renewals
Signalling Power Supplies and High Voltage Power S

Werdegang

Berufserfahrung von Sourabh Sharma

  • Bis heute

    Senior Project Engineer

    Bechtel

    I manage all Electrical and Plant, EMC and DC Traction Power design and construction activities on the Crossrail South East Section works between Plumstead and Abbey Wood getting carried out by Network Rail (BS11000 accredited project). I am also the Senior Electrification and Plant project engineer for the Crossrail North East Section works between Pudding Mill Lane and Shenfield. The total value of the portfolio of my work on the Crossrail East Section is approximately £26 million.

  • 6 Monate, Juli 2011 - Dez. 2011

    Senior Electrical Engineer

    Parsons Brinckerhoff

    I worked closely with the clients, whilst managing a team of design engineers to ensure that the work flow and quality of produced designs are delivered to quality, time and budget.

  • 1 Jahr und 1 Monat, Juli 2010 - Juli 2011

    Project Engineer

    Network Rail

    I managed and approved design and construction activities for allocated projects. I was accountable for making sure that appropriate engineering standards are used in relation to design and construction on allocated projects within the national programme with compliance to the requirements of Group and company standards, and Network Rail procedures

  • 11 Monate, Sep. 2009 - Juli 2010

    Electrical Design Engineer

    http://www.amey.co.uk/

    I prepared Electrical designs in accordance with Railway Group and Network Rail Standards. I was responsible for answering construction team queries on the jobs I was working on. I was responsible for the engineering development of allocated proposals by client from clarification of remit to project completion so that the engineering solutions to proposals are developed to best satisfy the business case.

  • 1 Jahr und 1 Monat, Sep. 2008 - Sep. 2009

    Assistant Electrical Design/Project Engineer

    Babcock

    I worked on variety of projects and supported a team of highly professional and skilled engineers. I was an assistant engineer on railway Points Heating jobs, 25kV Switchgear installations, 230V/230V IT systems Power Supply Designs and Testing & Commissioning, 650V IT Feeder Testing.

  • 1 Jahr und 1 Monat, Juli 2005 - Juli 2006

    Assistant Electrical Engineer

    Corus

    My work was related to thermal power generation, transmission and power distribution process

Ausbildung von Sourabh Sharma

  • 3 Jahre und 10 Monate, Sep. 2003 - Juni 2007

    Electrical and Electronics Engineering

    Liverpool John Moores University

    Power Systems and Protection

Sprachen

  • Englisch

    Fließend

  • Polnisch

    Grundlagen

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z