Dipl.-Ing. Stefan Muenker

ist offen für Projekte. 🔎

Bis 2024, Qualitätsmanager, Onejoon GmbH
Kuala Lumpur, Malaysia

Fähigkeiten und Kenntnisse

Verkauf
Projektmanagement
Inbetriebnahme von Anlagen
Prüfberichte
Personalmanagement
Vertriebsmanagement
Verfahrenstechnik
Engineering
Management
Chemie
Englische Sprache
Führungserfahrung
Raffinerien
Produktionsanlagen
Teamfähigkeit
PROGRESS
Inbetriebnahme

Werdegang

Berufserfahrung von Stefan Muenker

  • Bis heute 3 Jahre und 6 Monate, seit Feb. 2022

    Commissioning Supervisor

    Petrofac International Limited

    Direct all facets related to commissioning of CANSOLV flue gas pre-treatment unit company’s sub-vendors. Review and approve installation setup based on erection drawings, demonstrating full details about developing large structures as required. Address alarm/trip settings, authenticate instrumentation hook-ups and calibration as per requirement. Plan and conduct pre-commission training for personnel to start-up for enriching efficiency through proper leadership of field engineers during start-up.

  • Bis heute 12 Jahre und 2 Monate, seit Juni 2013

    Sales & Marketing Director

    PT. Grand Grand Kartech TbK

    Managed and controlled qualified team of 40 sales managers across oil and gas, chemical, power, automotive, and customized equipment through strategic planning and execution. Revised and enforces advanced sales activities to uplift business growth. Formulated and enforced achievable annual sales targets and personal Key Performance Indicator (KPI). Shared best product knowledge and sales pitch strategies with related authorities to expand business revenue.

  • 11 Monate, Sep. 2023 - Juli 2024

    Qualitätsmanager

    Onejoon GmbH
  • 1 Jahr und 2 Monate, Aug. 2022 - Sep. 2023

    Field Engineering Manager

    Onejoon GmbH
  • 3 Jahre und 7 Monate, Aug. 2018 - Feb. 2022

    Plant Manager, Manufacturing

    PT. Enerco RPO Internasional

    Led entire day-to-day multifaceted operations and maintenance functions in close collaboration with cross-functional teams. Formulated comprehensive routine/monthly production reports annual and plans in line with sales and marketing forecasts delivered by relevant personnel. Examined and decreased utility consumption meaning cost savings via appropriate management of consumable supply and raw material for smooth running of daily activities.

  • 1 Jahr und 1 Monat, Aug. 2018 - Aug. 2019

    Site and Engineering Manager

    PT. Enerco RPO Internasional

    Steered entire site and engineering operations for development of RPO oil refinery from ground-breaking to start-up. Supervised and inspected EPC and sub-contractors’ activities, overseeing toolbox and daily progress reports. Generated detailed reports and directly discussed with project owner with aim of initiating data-driven decisions. Resolved complex delivery and design issues through communication with global licensors and overseas vendors.

  • 15 Jahre und 8 Monate, 1998 - Aug. 2013

    Berater

    Agenis GmbH

Ausbildung von Stefan Muenker

  • 1981 - 1987

    Verfahrenstechnik

    FH Nuernberg

    Thermische und mech. Verfahrenstechnik / Anlagenbau

Sprachen

  • Deutsch

    -

  • Englisch

    -

  • Indonesisch

    -

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z