Swastioko Budhi Suryanto

Angestellt, Onshore Manager, BPMIGAS
Jakarta, Indonesien

Fähigkeiten und Kenntnisse

Indonesia Oil & Gas Community

Werdegang

Berufserfahrung von Swastioko Budhi Suryanto

  • Bis heute 15 Jahre und 7 Monate, seit 2010

    Onshore Manager

    BPMIGAS

    Manage, control and supervise projects for oil & gas in Indonesia, especially for onshore.

  • 6 Monate, Juli 2009 - Dez. 2009

    Sr. Electrical & Instrument Engineer

    PHE ONWJ Ltd.

    To significantly reduce the risk from process hydrocarbon release, Foxtrot F/S, Papa F/S & MB-2 Onshore will provided with F&G and Ultrasonic Gas Leak Detection System to initiate ESD if any hydrocarbon release or fire is detected, and also to warn personnel and to minimize the chance of ignition.

  • 3 Jahre und 3 Monate, Apr. 2006 - Juni 2009

    Sr. Electrical & Instrument Engineer

    BP West Java

    Most of the facilities are offshore structure with age in the range of 20 - 30 years that consist of 11 manned flow-stations and 2 onshore gas receiving facilities. The Rehab Project delivery strategy is to meet the Major Accident Risk (MAR) Group Reporting Line criteria for BPWJ for all manned sites. The overriding goal of the WJ IM Rehab plan is the prevention of major accidents, minimizing unplanned production loses, providing a secure growth base and conformance with the Group IM Standard.

  • 4 Monate, Jan. 2006 - Apr. 2006

    Lead Instrument Construction Engineer

    PT. Nippon Steel Construction Indonesia

    West Lobe Wellhead Platform – Premier Oil Natuna Sea B.V. The development of West Lobe Platform comprise three wellhead and seven future wellhead. West Lobe Wellhead Platform will be able to produce up to 120 MMSCFD gas into AGX Platform. His responsibility covers all of the instrumentation engineering and construction works such as : preparation of precommissioning & commissioning dossier, construction works, purchasing material, review vendor documents, etc.

  • 1 Jahr und 2 Monate, Nov. 2004 - Dez. 2005

    Lead Instrument Project Engineer

    PT. WorleyParsons Indonesia

    West Lobe Wellhead Platform – Premier Oil Natuna Sea B.V. At this project, his responsibility covers all of the instrumentation engineering design such as : preparation of instrument data sheets, calculations, drawings, control & shutdown systems, material requisitions, and vendor documents.

  • 6 Jahre und 10 Monate, Sep. 1997 - Juni 2004

    Sr. Instrument Engineer

    PT. J. Ray Mcdermott Indonesia

    His responsibility covers all of the instrumentation engineering design such as: preparation of instrument data sheets, calculations, drawings, material requisitions, technical bid evaluations, purchase requisitions and review vendor data or documents.

  • 5 Monate, Mai 1997 - Sep. 1997

    Sr. Instrument Engineer

    PT. Ceria Worley

    His responsibility covers all of the instrumentation engineering design such as: instrument data sheets, calculations, drawings, material requisitions, technical bid evaluations, purchase requisitions, review vendor data/documents and instrumentation drawings.

  • 2 Jahre und 1 Monat, Mai 1995 - Mai 1997

    Instrument Mark-up Engineer

    PT. Singgar Mulia

    ARII Engineering Drawing As-Built Project, mainly for MM-F/S area. The goal of this project is to bring to as-built status all ONWJ (Offshore North West Java) platform drawings and in addition those drawings deemed to be critical to operational requirements. The project requires approximately 7,900 drawings to be as-built.

  • 2 Jahre und 6 Monate, Dez. 1992 - Mai 1995

    Sr. Instrument Engineer /Act. Instrument Mgr.

    PT. Rekajasindo Bina Abadi

    His responsibility covers all of the instrumentation engineering design such as: developing instrument specification, drawings, designing control panels and shutdown systems, reviewing metering skid, etc. Beside that included in the construction and procurement works are material / fabrication inspection, performing technical evaluation of instrument bulk and equipment from vendor’s quotation, coordination for instrument testing, calibration and installation (precommissioning) and acceptance test preparatio

  • 1 Jahr und 9 Monate, Apr. 1991 - Dez. 1992

    Lead of Instrument Engineer

    PT. Tripatra Engineering & Constructor

    Export Oriented Refinery (EXOR) – I Project, Balongan, West Java The scope of work is Engineering Design for Unit 10 “Process Common”, Unit 12 & 13 “Atmospheric Residue Dehydrometallisation ( ARHDM )” and Unit 43 “Offsites Facilities”. He is responsible for maintaining the schedule and quality of the instrumentation engineering design works such as: Instrument data sheet, Plot plan, Main cable way layout, Wiring piping & tubing layout, Hook-up dwgs, BOM, etc.

  • 1 Jahr und 3 Monate, Feb. 1990 - Apr. 1991

    Instrument Engineer

    PT. Gunanusa Utama Fabricators

    Tambora Tunu Field Development EPC-1 Project East Kalimantan, Total Indonesie This project was developing a Gas Production Facility Platform (16 legs) to process approximately 400 MMSCFD Gas. At this project, his responsibility covers all of the instrumentation precommissioning works (material/fabrication inspection, calibration and installation) and instrument commissioning works (loop test, acceptance test, etc.). Beside that included in the construction work are installation supervisory and as-built all

  • 2 Jahre und 11 Monate, Aug. 1987 - Juni 1990

    First Lieutenant at R&D Department

    Dinas Penelitian dan Pengembangan TNI AD

    Military Services (WAMIL) as Zeni Officer with rank First Lieutenant at R&D Department, with Job Descriptions :  Research and Development of Military Equipment, such as : Light Machine Gun, Explosion Material, Fire Control Computer for Field Artillery, etc.  Military Material Procurement.  The Writer for a R & D Magazine National Army of Indonesia.

  • 1 Jahr und 10 Monate, Mai 1988 - Feb. 1990

    Instrument Engineer

    PT. Petroindo Gunapersada Engineering

    The scope of work covers Engineering Design for Loading BBM, Nitrogen Plant, Chlorinator Plant and Avtur Facilities at Pertamina UP-IV Cilacap, Central Java. Also Engineering Design for Floating Roof Tank at PGN Jakarta. He is responsible for carrying out the instrumentation design i.e. developing Instrument index, Data Sheet, Calculations, Hook-up drawings, Location plan drawings, Loop diagram, Material take-off, etc.

Ausbildung von Swastioko Budhi Suryanto

  • 5 Jahre und 9 Monate, Juli 1981 - März 1987

    Engineering Physics

    Bandung Institute of Technology (ITB)

    Instrumentation

Sprachen

  • Englisch

    -

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z