
Syed Hassan Abbas
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Syed Hassan Abbas
- Bis heute 3 Jahre und 9 Monate, seit Sep. 2021
Manager Meter Inspection
K-Electric
•As Manager of Meter Inspection at IBC Gadap, reduced unit loss and expanded consumer base, resulting in a 20% increase in business. •Led a team of over 50 employees to meet the yearly target of reducing distribution loss to 32% from 43%. •Trained and mentored assistant managers and meter inspectors, resulting in improved theft detection from 3 million to 17 million. •Launched Consumer Identification (Project Pehchaan) to boost bill delivery and collection and reduce customer complaint resolution time.
- 3 Jahre und 8 Monate, Jan. 2018 - Aug. 2021
Deputy Manager
K-Electric
•Reduced distribution losses by 32% through team management, theft detection, project planning, and advanced metering technology. •Mentored and trained over 20 employees on loss reduction and customer service. Implemented the Time of Use project for NEPRA, successfully installing 3000 TOU meters in one year. •Streamlined 100% of regional sites through digital mapping in GIS tools. Achieved a 50% reduction in distribution losses and 18% revenue loss in high-revenue sites, recovering over PKR 20 million.
- 5 Jahre, Jan. 2013 - Dez. 2017
Assistant Manager
K-Electric
•Managed installation of various types of meters, and trained staff on technical evaluation of equipment to detect faults. •Served as Safety Coordinator and ensured all employees followed safety rules. •Coordinated with departments to minimize revenue losses, and reduced distribution losses by 30% and theft activities by 40%. •Converted 40 feeders into AMR check meters, brought in the maximum recovery of billing charges, and played a key role in converting industrial billable meters into TOU.
- 3 Monate, Juli 2012 - Sep. 2012
Electrical Engineer
Morganti Group Inc
Conducted a quantity survey for 100+ electrical equipment, including lighting fixtures, power outlets, LV panels, UPS, BMS system, fire alarm system, public addressing system, MATV, CCTV, and access control system. Prepared survey reports for 146 buildings with job codes and photos. Developed prioritized work plan for installation and maintenance of electrical systems, and performed asset lifecycle cost analysis.
- 2 Jahre und 3 Monate, Dez. 2009 - Feb. 2012
Site Electric Engineer
SRCC
• Led and managed a successful construction project of 29,000m² in KSA with a budget of 165 million SAR, specializing in low voltage and low current facilities. • Designed AutoCAD electrical drawings and resolved design issues during the commissioning stage. • Restructured key design areas for efficient installation of utilities and prepared system diagrams. • Coordinated with site personnel and reviewed project documents, resulting in a 30% cost reduction and 100% resource efficiency.
- 1 Jahr und 11 Monate, Feb. 2008 - Dez. 2009
Application Engineer
ERA Automation
•Provided automation, machine, and process design expertise, and developed technical specifications for RFO and contracting purposes. •Projects included periodic flow measurement (ultrasonic & vortex), level monitoring (Ametek & Load Cells), and oil level measurement for fuel tanks and petrol stations for clients such as Pakistan Navy, IFFCO, V-Track, Merck Sharp & Dome, Pakistan Refinery, Shan Food Industries, and Shell Pakistan.
Sprachen
Englisch
-
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.