Tahir Ali

Angestellt, Construction Manager, Zain-ul-Abideen & Sons Engineers & Constructors
Mingora Swat, Pakistan

Fähigkeiten und Kenntnisse

Construction

Werdegang

Berufserfahrung von Tahir Ali

  • Current 11 years and 5 months, since Jan 2015

    Construction Manager

    Zain-ul-Abideen & Sons Engineers & Constructors

    • Maintain the record for Submittals, method statements, bar bending schedule and shop drawings at site. • Ensure the Quality Control Plan, monitor QC activities and take appropriate actions to ensure compliance in coordination with QA Staff. • Approves bar bending schedules and shop drawings in coordination with QA staff, Quantity Surveyor and Design Office • Responsible for all technical and contractual correspondence.

  • 2 years and 11 months, Feb 2012 - Dec 2014

    Project Engineer

    Niaz Muhammad and Sons (Baadwan Batkhela) Malakand.

    • To supervise and monitor the Site Engineers. • To plan and report the progress of roads and building projects activities. • To interact with the line departments and communities for their inputs. • To keep track of the claimed bills of contractors and processing the same for approval. • Approves the subcontractor’s submittals, method statements, bar bending schedules and shop drawings in coordination with QA staff, Quantity Surveyor and Design Offi

  • 1 year and 1 month, Jan 2011 - Jan 2012

    Resident Engineer

    ---CDM Smith

    • Focal point on all construction related activities and coordination with other stakeholders. • Responsible for the administration of the Subcontract Agreement. • Responsible for all technical and contractual correspondence with Subcontractor(s) • Ensure that Subcontractor(s) comply with the Quality Control Plan, monitor QC activities and take appropriate actions to ensure compliance in coordination with QA Staff. • Ensure project is build within the timelines as per baseline schedule.

  • 1 year, Jan 2010 - Dec 2010

    Senior Civil Engineer

    ACTED (French) NGO

    • Carry out assessment for UNHCR shelter program. • Formation of 15 village committees. • Preparing weekly work plan. • Arrangement of model shelter training for community skilled carpenters. • Distribution of shelter materials amongst beneficiaries. • Supervision of the team(mobilizers sub engineers and carpenters

  • 1 year and 8 months, Jun 2008 - Jan 2010

    Construction Engineer

    Infra-D Consultant (I.D.C)

    Dubair Khwar Hydro power. Project Pattan.Kohistan. & Allai Khwar Hydro Power Project Distt Batagram. • Investigation and detailed survey of Dam site, Tunnel, Concrete work other structures. • Data Collection • Preparation of Daily, Monthly and weekly progress reports. • Supervision of Concrete work. • Reviewed drawings and specification following during construction, • Construction supervision of weir structure stilling basin .sand trap portion Grouting galleries in weir site according to drawings

  • 1 year and 2 months, Apr 2007 - May 2008

    Principal Engineer

    Infra –D Consultant (I D C)

    Talli Tangi Dam project .sibi .Bolochistan DESCRIPTION OF DUTIES • Investigation and detailed survey of Dam site. Tunnel, other, Structures including detailed Topographic survey of reservoir and command Area including strip survey of canal alignment. • Data Collection • Preparation of Feasibility level design and cost Estimates. • Preparation of BOQ and tender Drawings. • Preparation of detailed design report

  • 1 year and 4 months, Dec 2005 - Mar 2007

    Civil Engineer

    Sino hydro corporation

    Khan Khwar Hydro Power project DESCRIPTION OF DUTIES • Construction of powerhouse shaft area and Terrace area • Construction of powerhouse and other premises activities • Reviewed drawings and specification follow up during construction • Developed of concepts, supervision technical assistance and verification of the detailed design for earthquake-resisting system and in order to meet New seismic regulation needs for existing structure and it’s develop. • • •

  • 2 years, Jan 2004 - Dec 2005

    Civil Construction/Engineer

    Management Consultants Pvt.Ltd Pakistan

    Worked on Various roads buildings water Supply, infra-structure and other Civil works. • Overall construction supervision, contract administration of the Projects. • Prepared Progress reports and coordination with relevant agencies

  • 4 years and 11 months, Mar 1999 - Jan 2004

    Civil/ site Engineer

    M/S Technicon Enterprises P.v.t.L.t.d

    Construction and supervision of all roads, Bridges, and Buildings components. • Preparation of daily monthly reports. • Cost comparison of various items. • checking of surveying and leveling operation. • Prepared of periodic cash low forecasts and certificates for payment including updated cost estimates for construction and supervision

  • 6 years and 7 months, Jun 1992 - Dec 1998

    Civil/Construction/ Site Engineer

    Muzafar -ul- Mulk Kaki Khan construction company

    • Polytechnic College Panr 1st Floor (1992-93) • Construction of Hostel block in para Medical institute Swat (1993-94) • Construction of Science block in Govt Jhenzeb College Swat (1994-95) • Constructions of 1st floor of post Graduate block of Govt of Jhenzab College swat 1995-1996 • Construction of commercial training institute Swat (1996-97) • Estimation of commercial training institute Swat (1997-98)

Ausbildung von Tahir Ali

  • 3 years, Apr 1989 - Mar 1992

    B.Sc civil engineer

    Manuel Louis Quezon University Manila Philippines

Sprachen

  • English

    C1 (Fließend)

  • Arabic

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 21 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z