
Tahir Ali
Suchst Du einen anderen Tahir Ali?
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Tahir Ali
- Bis heute 10 Jahre und 6 Monate, seit Jan. 2015
Construction Manager
Zain-ul-Abideen & Sons Engineers & Constructors
• Maintain the record for Submittals, method statements, bar bending schedule and shop drawings at site. • Ensure the Quality Control Plan, monitor QC activities and take appropriate actions to ensure compliance in coordination with QA Staff. • Approves bar bending schedules and shop drawings in coordination with QA staff, Quantity Surveyor and Design Office • Responsible for all technical and contractual correspondence.
- 2 Jahre und 11 Monate, Feb. 2012 - Dez. 2014
Project Engineer
Niaz Muhammad and Sons (Baadwan Batkhela) Malakand.
• To supervise and monitor the Site Engineers. • To plan and report the progress of roads and building projects activities. • To interact with the line departments and communities for their inputs. • To keep track of the claimed bills of contractors and processing the same for approval. • Approves the subcontractor’s submittals, method statements, bar bending schedules and shop drawings in coordination with QA staff, Quantity Surveyor and Design Offi
- 1 Jahr und 1 Monat, Jan. 2011 - Jan. 2012
Resident Engineer
---CDM Smith
• Focal point on all construction related activities and coordination with other stakeholders. • Responsible for the administration of the Subcontract Agreement. • Responsible for all technical and contractual correspondence with Subcontractor(s) • Ensure that Subcontractor(s) comply with the Quality Control Plan, monitor QC activities and take appropriate actions to ensure compliance in coordination with QA Staff. • Ensure project is build within the timelines as per baseline schedule.
- 1 Jahr, Jan. 2010 - Dez. 2010
Senior Civil Engineer
ACTED (French) NGO
• Carry out assessment for UNHCR shelter program. • Formation of 15 village committees. • Preparing weekly work plan. • Arrangement of model shelter training for community skilled carpenters. • Distribution of shelter materials amongst beneficiaries. • Supervision of the team(mobilizers sub engineers and carpenters
- 1 Jahr und 8 Monate, Juni 2008 - Jan. 2010
Construction Engineer
Infra-D Consultant (I.D.C)
Dubair Khwar Hydro power. Project Pattan.Kohistan. & Allai Khwar Hydro Power Project Distt Batagram. • Investigation and detailed survey of Dam site, Tunnel, Concrete work other structures. • Data Collection • Preparation of Daily, Monthly and weekly progress reports. • Supervision of Concrete work. • Reviewed drawings and specification following during construction, • Construction supervision of weir structure stilling basin .sand trap portion Grouting galleries in weir site according to drawings
- 1 Jahr und 2 Monate, Apr. 2007 - Mai 2008
Principal Engineer
Infra –D Consultant (I D C)
Talli Tangi Dam project .sibi .Bolochistan DESCRIPTION OF DUTIES • Investigation and detailed survey of Dam site. Tunnel, other, Structures including detailed Topographic survey of reservoir and command Area including strip survey of canal alignment. • Data Collection • Preparation of Feasibility level design and cost Estimates. • Preparation of BOQ and tender Drawings. • Preparation of detailed design report
- 1 Jahr und 4 Monate, Dez. 2005 - März 2007
Civil Engineer
Sino hydro corporation
Khan Khwar Hydro Power project DESCRIPTION OF DUTIES • Construction of powerhouse shaft area and Terrace area • Construction of powerhouse and other premises activities • Reviewed drawings and specification follow up during construction • Developed of concepts, supervision technical assistance and verification of the detailed design for earthquake-resisting system and in order to meet New seismic regulation needs for existing structure and it’s develop. • • •
- 2 Jahre, Jan. 2004 - Dez. 2005
Civil Construction/Engineer
Management Consultants Pvt.Ltd Pakistan
Worked on Various roads buildings water Supply, infra-structure and other Civil works. • Overall construction supervision, contract administration of the Projects. • Prepared Progress reports and coordination with relevant agencies
- 4 Jahre und 11 Monate, März 1999 - Jan. 2004
Civil/ site Engineer
M/S Technicon Enterprises P.v.t.L.t.d
Construction and supervision of all roads, Bridges, and Buildings components. • Preparation of daily monthly reports. • Cost comparison of various items. • checking of surveying and leveling operation. • Prepared of periodic cash low forecasts and certificates for payment including updated cost estimates for construction and supervision
- 6 Jahre und 7 Monate, Juni 1992 - Dez. 1998
Civil/Construction/ Site Engineer
Muzafar -ul- Mulk Kaki Khan construction company
• Polytechnic College Panr 1st Floor (1992-93) • Construction of Hostel block in para Medical institute Swat (1993-94) • Construction of Science block in Govt Jhenzeb College Swat (1994-95) • Constructions of 1st floor of post Graduate block of Govt of Jhenzab College swat 1995-1996 • Construction of commercial training institute Swat (1996-97) • Estimation of commercial training institute Swat (1997-98)
Ausbildung von Tahir Ali
- 3 Jahre, Apr. 1989 - März 1992
B.Sc civil engineer
Manuel Louis Quezon University Manila Philippines
Sprachen
Englisch
Fließend
Arabisch
-
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.