Thomas Persson

Fähigkeiten und Kenntnisse

AutoCAD
Contract Negotiation
Budgeting
Coordination
Civil Engineering
Cost Control
Engineering
Commissioning
Electric Power
Construction
EPC
Electrical
Construction Management
Factory
Power Generation
Electrical Engineering
Contract Management
Feasibility Studies
Power Plants
Electricians
High Voltage
Power Systems
Electricity
Inspection
Primavera
Energy
Maintenance Management
Procurement
Energy Efficiency
Project Control
Microsoft Office
Project Planning
Project Coordination
MS Project
Turbines
Renewable Energy
Project Engineering
Water
Power Distribution
SCADA
Scheduling
Wind
Project Execution
Smart Grid
Project Management
Substation
Supervisory Skills
Switchgear
Team Leadership
Transformer

Werdegang

Berufserfahrung von Thomas Persson

  • Current 8 years and 11 months, since Aug 2017

    Freelance

    Self-employed

  • 1 year and 10 months, Sep 2015 - Jun 2017

    Senior Project Manager

    WSP | Parsons Brinckerhoff in the Middle East

    As Project Manager to Kahramaa Management Team responsible for the coordination in-between the Consultants Project Team in UAE/UK and the Client in Qatar. Assist the Client by means of Project management, Resolving contractual issues, Procurement, Technical Review, Design review, Site Supervision, Testing, Commissioning, Dispute resolution, Management of changes, and various interface coordination’s etc. with the contractors. Coordination and bridging between Client and Contractor to ensure that the progres

  • 11 months, Oct 2014 - Aug 2015

    Senior Electrical Engineer

    NorPower Sdn

    As Senior Electrical Engineer responsible for the coordination in-between the Consultants Project Team and the Client. Assist the Client by means of Project management, Preparation of Bidding document, Electrical design (Layouts, SLD, etc.), Technical Specifications, Evaluation of Bidding Documents, Preparation of Contract documents, Resolving contractual issues, Procurement, Technical Review, Design review, Site Supervision, Testing, Commissioning, Dispute resolution, Management of changes, and various in

  • 7 months, Feb 2014 - Aug 2014

    Resident Project Manager

    Poyry SwedPower AB

    As Resident Project Manager/Adviser to VRA (Volta River Authority)/GRIDCo Project Management Team responsible for the coordination in-between the Consultants Project Team in Sweden and the Client in Ghana. Assist the Client by means of Project management, Preparation of Bidding document, Electrical design (Layouts, SLD, etc.), Technical Specifications, Evaluation of Bidding Documents, Preparation of Contract documents, Resolving contractual issues, Procurement, Technical Review, Design review, Site Supervis

  • 4 months, Oct 2013 - Jan 2014

    Project Manager

    ILF Consulting Engineers

    Leading the Consultants Team in Saudi Arabia, project management assistance, procurement assistance, assistance in supervision of procurement and implementation, bid evaluation and assist in evaluation reporting, assist at site inspections and commissioning. Review of design, technical specifications Co-ordination between contractors, management of changes and resolve interface issues at site is a critical task. Close co-operation with the engineers located in the project management head office in Sweden.

  • 5 years, Oct 2008 - Sep 2013

    Project Manager Poyry SwedPower AB

    Volta River Authority

    Leading the Consultants Team in Ghana, project management assistance, procurement assistance, assistance in supervision of procurement and implementation, bid evaluation and assist in evaluation reporting, assist at site inspections and commissioning. Review of design, technical specifications Co-ordination between contractors, management of changes and resolve interface issues at site is a critical task. Close co-operation with the engineers located in the project management head office in Sweden. Close

  • 2008 - 2008

    Construction Coordinator

    Multiconsult

    As Coordination Manager in charge of following: Monitoring/supervision/inspection of the on-going Power House arrangements, 500/115kV OHL and Switchyard works. Co-ordination between partners, management of changes and resolve interface issues at site. Document and communicate with the Facilities Engineer, the partner’s local representative. Mark-up drawings for correction by owner and finally give the required input for as-built drawings representing powerhouse installations. Close co-operation with the Fac

  • 3 years and 9 months, Apr 2004 - Dec 2007

    Project Manager

    SwedPower AB

    Consultancy services, monitoring and on site supervision to the local power authority ADWEA/AADC. Turnkey supply of new 33/11 kV Primary Substations and new GIS Substations 220/133/11 kV. The project include following main technical components namely, Grid stations: OHL 220 kV with associated gas insulated switchgear, power transformers, 220133/11, standby power generation; Primary substations power transformers 33/11 kV, GIS, AIS insulated switchgear, standby power generation. Activities performed: Res

  • 1 year and 3 months, Nov 2000 - Jan 2002

    Deputy Plant Manager and Electrical Superintendent

    ICS International Construction Service (Skanska International AB)

    Hydroelectric Central Project As Deputy Plant Manager and Electrical Superintend (Electrical, Telecommunication) and Plant Pool in Peru, employing more than 250 Technicians, Supervisors, Engineers, Drivers and Workers. Electrical Section was responsible for Design, Installation (Temporary and Permanent above and underground) and Maintenance of following: o Power Transmission, o Distribution Networks, o Telecommunication, o Crushing - and Batching Plants, Plant pool consisting of trucks, vehicles, TBM drilli

  • 1 year and 7 months, Feb 2000 - Aug 2001

    Construction Manager

    Penta Ocean Constrution Co. Ltd.

    Main project features: Plan, Design and Budget at the Construction sites. Activities performed: Responsible for the planning, design, budget and execute civil, HVAC, fire fighting and electro-mechanical design/works.

  • 3 years and 11 months, Oct 1993 - Aug 1997

    Utility Services Superintendent and Acting Plant Manager

    International Construction Management

    Main project features: Responsible for Plant pool consisting of all necessary vehicles for the implementation of the project , Power distribution, power stations and distribution networks, telecommunication and data installations, electrical and mechanical maintenance workshops, civil-engineering and building maintenance, electrical maintenance of a crushing plant and two batching plants. Activities performed: Responsible for Plan, Design, budget and executive Civil, HVAC, Fire fighting and Electromech

  • 7 years and 1 month, May 1980 - May 1987

    Deputy Electrical Manager & Electrical Superintendent

    Scan Management (Angpanneforeningen)

    As Deputy Electrical Manager & Superintendent of Electrical Department, responsible for Electrical Workshop at Bai Bang Pulp and Paper Mill, employing more than 125, Supervisors, Technicians, Engineers and Workers. Responsible for Administration, Maintenance, Operation, Budget, Industrial Safety and Training for Electrical Department together with Electrical Manager. Coach, mentor and lead personnel within the technical team environment.

Ausbildung von Thomas Persson

  • 1970 - 1974

    Bachelor of Science in Electrical Power Engineering

    Technical Institute of Vasteras/Karlstad, Sweden

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 21 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z