Dipl.-Ing. Tilo Schroeter
Angestellt, Executive Director, KAFRIL GROUP
Lossatal OT Großzschepa, Germany
Timeline
Professional experience for Tilo Schroeter
Current 3 years and 7 months, since Mar 2020
Executive Director
KAFRIL GROUP
1 year, Mar 2019 - Feb 2020
Project Manager Verkehrsknoten Magdeburg
PORR Deutschland GmbH
Renewal of five railway overpasses in close proximity to Magdeburg's Central Station. Construction of a cut and cover tunnel below the present road level to separate the motorized private traffic from the remaining traffic flows such as trams, pedestrians and cyclists.
1 year and 5 months, Oct 2017 - Feb 2019
Site Manager - Verkehrsknoten Magdeburg
PORR Deutschland GmbHRenewal of five railway overpasses in close proximity to Magdeburg's Central Station. Construction of a cut and cover tunnel below the present road level to separate the motorized private traffic from the remaining traffic flows such as trams, pedestrians and cyclists.
1 year and 7 months, Mar 2016 - Sep 2017
Senior Tunnel Project Engineer - Westconnex 1b/ M4 East Section Cintra Park
John Holland Tunnelling
WestConnex is Australia’s largest transport infrastructure project. Seven kilometres in total length, the M4 East will join the M4 Widening at Homebush Bay Drive and provide a 5.5 kilometre tunnel. -Managing Safety and Environmental Plans -Responsible to supervise a team of 7 Site Managers -Assigned to manage construction/ budgets for: Bored Piles/ Canopy Tubes/ Tunnel Portal/ Roadheader heading/ Bench Excavation/ Ground Support/ Spoil Management/ Waterproofing/ Cross Passages/ Tunnel Monitoring
1 year and 2 months, Jan 2015 - Feb 2016
Senior Tunnel Project Engineer - Arncliffe Pedestrian Link
John Holland Tunnelling
Arncliffe Pedestrian Link The project includes a 30 m long shared pedestrian and cycle underpass through an embankment beneath four live passenger rail tracks. The underpass is being constructed as a mined tunnel with large diameter canopy tubes without disruption to rail services. Fully responsible for planning, procurement and implementation, including site mobilisation, installation of monitoring systems, ground treatment, fibreglass dowels, canopy tubes, excavation and lining of the underpass.
1 year and 6 months, Jul 2013 - Dec 2014
Senior Tunnel Project Engineer - North Strathfield Underpass
John Holland
North Strathfield Underpass Construction of shallow driven tunnel • Tunnel to be constructed under operating railway lines with very shallow ground cover
2 years, Jul 2011 - Jun 2013
Tunnel Project Engineer - M2 Upgrade Tunnel Section
CPB Contractors
Tunnel widening • Enlargement of existing 2 no. of 500m long 2 lanes tunnel to 3 lanes tunnel in Sydney Sandstone • Installation of rock bolts and spraying of steel fibre shotcrete (40 MPa) • Excavation of batters, bench and box • Construction of new tunnel portals • Enlargement of existing cross passages with fire resistant door system • Construction of electrical niches with fire resistant door system and service trench • Construction of new tunnel drainage including cross drains
2 years and 11 months, Sep 2008 - Jul 2011
Civil Engineer - Airport Link Brisbane Toombul Section
Thiess
Airport Link Brisbane - Toombul Section - CC420 Jacking Box Airport Link Brisbane - Toombul Section - Construction of CC410 TBM Launch Box (105m long/ 39m wide/ 24m deep)
4 years and 6 months, Mar 2004 - Aug 2008
Civil Engineer - City Tunnel Leipzig Los B
KAFRIL
Civil Engineer - City Tunnel Leipzig Los B/ Kreuzungsbauwerk Einbindung Sued
Educational background for Tilo Schroeter
5 years and 4 months, Apr 1998 - Jul 2003
Degree in Engineering
University of Applied Sciences/ Hochschule Anhalt
Civil Engineering
Languages
German
-
English
Fluent
Russian
Basic
Polish
Basic
French
Basic