Dipl.-Ing. Tilo Schroeter

Angestellt, Executive Director, KAFRIL GROUP
Lossatal OT Großzschepa, Deutschland

Fähigkeiten und Kenntnisse

15 years of international project delivery experie
experience with NATM and SEM
excavation and lining of shallow cover tunnel
soft ground roadheader excavation
tunnel excavation techniques
ground support and shotcrete/ concrete lining
excavation in undergrund
excavation under water
cut and cover
structural steel & concrete
canopy tubes
waterproofing
tunnel monitoring
Bauwesen
Unternehmensführung

Werdegang

Berufserfahrung von Tilo Schroeter

  • Bis heute 5 Jahre und 2 Monate, seit März 2020

    Executive Director

    KAFRIL GROUP

  • 1 Jahr, März 2019 - Feb. 2020

    Project Manager Verkehrsknoten Magdeburg

    PORR Deutschland GmbH

    Renewal of five railway overpasses in close proximity to Magdeburg's Central Station. Construction of a cut and cover tunnel below the present road level to separate the motorized private traffic from the remaining traffic flows such as trams, pedestrians and cyclists.

  • 1 Jahr und 5 Monate, Okt. 2017 - Feb. 2019

    Site Manager - Verkehrsknoten Magdeburg

    PORR Deutschland GmbH

    Renewal of five railway overpasses in close proximity to Magdeburg's Central Station. Construction of a cut and cover tunnel below the present road level to separate the motorized private traffic from the remaining traffic flows such as trams, pedestrians and cyclists.

  • 1 Jahr und 7 Monate, März 2016 - Sep. 2017

    Senior Tunnel Project Engineer - Westconnex 1b/ M4 East Section Cintra Park

    John Holland Tunnelling

    WestConnex is Australia’s largest transport infrastructure project. Seven kilometres in total length, the M4 East will join the M4 Widening at Homebush Bay Drive and provide a 5.5 kilometre tunnel. -Managing Safety and Environmental Plans -Responsible to supervise a team of 7 Site Managers -Assigned to manage construction/ budgets for: Bored Piles/ Canopy Tubes/ Tunnel Portal/ Roadheader heading/ Bench Excavation/ Ground Support/ Spoil Management/ Waterproofing/ Cross Passages/ Tunnel Monitoring

  • 1 Jahr und 2 Monate, Jan. 2015 - Feb. 2016

    Senior Tunnel Project Engineer - Arncliffe Pedestrian Link

    John Holland Tunnelling

    Arncliffe Pedestrian Link The project includes a 30 m long shared pedestrian and cycle underpass through an embankment beneath four live passenger rail tracks. The underpass is being constructed as a mined tunnel with large diameter canopy tubes without disruption to rail services. Fully responsible for planning, procurement and implementation, including site mobilisation, installation of monitoring systems, ground treatment, fibreglass dowels, canopy tubes, excavation and lining of the underpass.

  • 1 Jahr und 6 Monate, Juli 2013 - Dez. 2014

    Senior Tunnel Project Engineer - North Strathfield Underpass

    John Holland

    North Strathfield Underpass Construction of shallow driven tunnel • Tunnel to be constructed under operating railway lines with very shallow ground cover

  • 2 Jahre, Juli 2011 - Juni 2013

    Tunnel Project Engineer - M2 Upgrade Tunnel Section

    CPB Contractors

    Tunnel widening • Enlargement of existing 2 no. of 500m long 2 lanes tunnel to 3 lanes tunnel in Sydney Sandstone • Installation of rock bolts and spraying of steel fibre shotcrete (40 MPa) • Excavation of batters, bench and box • Construction of new tunnel portals • Enlargement of existing cross passages with fire resistant door system • Construction of electrical niches with fire resistant door system and service trench • Construction of new tunnel drainage including cross drains

  • 2 Jahre und 11 Monate, Sep. 2008 - Juli 2011

    Civil Engineer - Airport Link Brisbane Toombul Section

    Thiess

    Airport Link Brisbane - Toombul Section - CC420 Jacking Box Airport Link Brisbane - Toombul Section - Construction of CC410 TBM Launch Box (105m long/ 39m wide/ 24m deep)

  • 4 Jahre und 6 Monate, März 2004 - Aug. 2008

    Civil Engineer - City Tunnel Leipzig Los B

    KAFRIL

    Civil Engineer - City Tunnel Leipzig Los B/ Kreuzungsbauwerk Einbindung Sued

Ausbildung von Tilo Schroeter

  • 5 Jahre und 4 Monate, Apr. 1998 - Juli 2003

    Degree in Engineering

    University of Applied Sciences/ Hochschule Anhalt

    Civil Engineering

Sprachen

  • Deutsch

    -

  • Englisch

    Fließend

  • Russisch

    Grundlagen

  • Polnisch

    Grundlagen

  • Französisch

    Grundlagen

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z