Utku Tülücü
Werdegang
Berufserfahrung von Utku Tülücü
- Bis heute 8 Monate, seit Apr. 2025
C&Q Lead / C&Q LOTO Lead
Novo Nordisk Engineering
Leading the Installation Completion checks, SAT Walkdowns, Mechanical Completion Walkdowns, System take-over from Construction to C&Q, Mark-up and Coordination of Water loops for the first run, etc. Building up the LOTO system for NNE’s growing C&Q Department, leading all C&Q LOTO plans and implementations, ensure compliance to the Site Commissioning Safety Procedures.
Execute commissioning activities of Gas Turbine, BOP (Balance of Plant), Water Treatment Plant, Cooling System, HRSG, Steam Turbine and Siemens T3000 Control System. Lead a team of commissioning engineers during the commissioning phase of CCPP. Responsible for performing combined cycle power plant operations such as start-up and shutdown with Natural Gas and Liquid Fuel, initial operation, performance testing for client acceptance and turnover packages, according to Siemens AG quality standards.
- 2 Jahre und 4 Monate, Aug. 2022 - Nov. 2024
PTW Manager
AREVA
Participation to PSM (Plant Status Management) related meetings (daily/weekly). Following up 3 Day Look Ahead program for all tasks on site. Briefing MCR of the linked activities in the schedule sequence to gain customer shift awareness of the priorities. Coach and develop the skills of others, create an environment of safety, empowerment and trust in a diverse team. Review and/or redact project PTW procedures
- 2 Jahre und 10 Monate, Nov. 2019 - Aug. 2022
PTW Mechanical Lead
AREVA
Technical clarification of work orders / Permits to test and creation and validation of blockings / simulations. Preparation of Master Blockings for Outages. Define draining, filling, venting, requalification of systems. Modification of Executed Blockings based on Plant’s current status. Oversee In-field operator teams for establishing safe work conditions (equipment alignment, depressurizing, de- energising, locking and tagging). Prepare Permit to Work documentation and ensure strict compliance.
- 10 Monate, Nov. 2018 - Aug. 2019
Commissioning Engineer
SIEMENS
IPP Ramat Gavriel (1x Siemens SGT-800 + 1 x Siemens SST-300 – Power Output 70 MW) Execute commissioning activities of Gas Turbine, BOP, Water Treatment Plant, Cooling System,Chillers, HRSG, Steam Turbine and Siemens SPPA-T3000 Control System. Responsible for performing combined cycle power plant operations such as start-up and shutdown with natural gas and diesel, initial operation, performance testing for client acceptance and turnover packages, according to Siemens AG quality standards.
- 9 Monate, Nov. 2017 - Juli 2018
Commissioning Lead
Shanahan Engineering
227 MW Co-Generation PP Commissioning of 227 MW CCPP, Systems commissioned: Compressed Air, Firefighting, Demineralized Water, Closed Cooling Water, Lube Oil and Seal Oil systems which consist of variety of pumps, filters and valves.
- 2 Monate, März 2017 - Apr. 2017
Consultant
STEAG Energy Services GmbH
Consultancy during preparation of BADES Energy 200 MW 'TAHA CCPP' Due Diligence Report. Site visits to TAHA CCPP in Mardin which has been removed from Shotton/UK, Analyse technical problems and incomplete systems. Propose improvement ways in order to put the plant in service. Prepare a Pre-Commissioning and Commissioning Plan for overall equipment (GTs, HRSGs, ST and Aux) and Staff requirements for the investor.
- 1 Jahr und 2 Monate, Nov. 2015 - Dez. 2016
Commissioning Engineer / Shift Leader
GE Power & Water - Distributed Power
Systems commissioned: Closed Cooling system, Lube oil System, Seal Oil System, HRSG, BOP (Compressed Air, Fire protection, Condensate system.) Oversee commissioning activities, prepare the plant for the daily commissioning tests, ensure daily plant inspection, customize plant operating instructions and develop site specific operating instructions (BOP). Ensure plant operation: shaft-line and BOP systems by MARK VIe DCS. Review, redact plant operation procedures, follow-up of daily operation.
- 7 Monate, Mai 2015 - Nov. 2015
Technical Writer
GE Power & Water - Distributed Power
- 7 Monate, Nov. 2014 - Mai 2015
LOTO Lead - LOTO Engineer
Shanahan Engineering
- 7 Monate, Jan. 2014 - Juli 2014
Commissioning Engineer / Shift Leader
GE Power & Water - Distributed Power
- 1 Jahr und 8 Monate, Jan. 2012 - Aug. 2013
Permit to Work & LOTO Coordinator
Shanahan Engineering
- 4 Jahre und 1 Monat, Dez. 2007 - Dez. 2011
Shift Operation Engineer
İskenderun Enerji Üretim AŞ - İsken
Ausbildung von Utku Tülücü
- Bis heute 15 Jahre und 1 Monat, seit Nov. 2010
MBA
Cukurova Üniversitesi
- 3 Jahre und 9 Monate, Okt. 2001 - Juni 2005
Makine Mühendisliği
Uludağ Üniversitesi
Sprachen
Englisch
Fließend
Deutsch
Grundlagen
Türkisch
Muttersprache
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.