Vipan Kumar

Bis 2008, Engineering Trainee, Leighton Asia
Greater noida west, Indien

Fähigkeiten und Kenntnisse

Engineering
Project Management
Change Management
Electronics
Product Development
PMP
Project management office
Process Optimization
Electrics
MS Project
Project Controlling
Design Management
Project Planning
International Project Management
Project development
Functional Design
Product design
Team work
Commitment
International experience
Intercultural competence
Organizational skills
Leadership skills
Analytical skills
Flexibility
Creativity
Requirements Engineering
PMSM
FEA Analysis
Ansys Maxwell & RMxprt
Simcenter Magnet Motor Solver and Speed Software
Solidworks
Electronic Inverter Product
2D/3D FEA Simulation
AC motor
DC Motor
Switched Reluctance motor
SRM
synchronous reluctance motor
induction motor
BLDC motor
brushless DC motor
sensorless BLDC motor
converter
permanant magnet motor
Six Sigma Green Belt
Costing
vendor development
Quality Audit

Werdegang

Berufserfahrung von Vipan Kumar

  • Bis heute 3 Jahre und 2 Monate, seit Mai 2022

    Senior Design Manager : Project Management, New Product Development

    Crompton Greaves Consumer Electricals Limited

    • Manage team of electrical, Electronics, and Mechanical engineers to Design and Development of motors, Drives and Converters. • Lead cross-functional design reviews, analyze concepts, and evaluate cost effectiveness of the component/assembly designs. • Prepare and maintain product documentation, instruction manuals, and design & test documentation. • Design and development of motors with Induction/BLDC/PMSM/SRM/Axial/PCB technologies for ceiling and TPW fans.

  • 12 Jahre und 3 Monate, März 2010 - Mai 2022

    New Product Development Manager

    LG Electronics

    Development Manager & developing cost effective reciprocating/inverter Compressor Model through motor design optimization. Responsible for New Model Development from the conceptualization stage to the final execution, finalization of tech specification, mass production trials and progress monitoring. Perform root cause analysis and troubleshooting on the new and existing products and processes. Coordinate engineering activities with purchasing and manufacturing.

  • 1 Jahr und 10 Monate, Mai 2008 - Feb. 2010

    Electrical Engineer

    Dlf Laing O� Rourke India Limited

    Engaged in commissioning & testing of server room including temperature test at a load of 2.5 KW. Perform design calculations related to tasks assigned. Prepare project SOW, preliminary design concepts, and cost estimates for small projects. Assist in gathering field data and preparing project specifications.

  • 10 Monate, Juli 2007 - Apr. 2008

    Engineering Trainee

    Leighton Asia

    Carried out all areas Instrumentation work, including workshop, are kept in a clean, and orderly state, in accordance with the 5s Principles. Coordination with Quality manager/ Officer/ Inspector for any revisions, specifications, Procedures related to Metrology, Calibration & Inspections

Ausbildung von Vipan Kumar

  • 2 Jahre und 1 Monat, Apr. 2005 - Apr. 2007

    Electrical Engineering

    Punjab Engineering College, Chandigarh

  • 4 Jahre und 1 Monat, März 2001 - März 2005

    Electrical Engineering

    Kurukhestra university

Sprachen

  • Englisch

    Fließend

  • hindi

    Muttersprache

  • Deutsch

    Grundlagen

  • Koreanisch

    Grundlagen

  • punjabi

    Gut

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z