
Wasif Akbar
Werdegang
Berufserfahrung von Wasif Akbar
- Bis heute 16 Jahre und 8 Monate, seit Okt. 2008
Acting Engineering Manager
Descon Engineering Limited
, I have to manage all Engineering Issues with reference to the Construction activities for Piping & Process. Achieve all Engineering milestones by conducted HAZOP, FMEA and 3D model review. I take Engro CDR Project as a Piping Engineer, conduct technical clarifications in procurement & now handling Field Engineering activities in Construction.
- 2 Jahre und 6 Monate, Mai 2006 - Okt. 2008
Process_Piping Engineer
DDFC (Pvt.) Ltd
Process Calculation & P&ID/PFD Development for Cogeneration Plant, Boiler Feed Water, Stream Line, Hot Water Generation System, Cooling Water Circulation Plant. Thermal & Mechanical Design of Fired Tube Boiler, Waste Heat Recovery Boiler, Combine cycle Project, Hot Water Generator Systems. Mechanical Design of Pressure Vessel, LPG Storage Tanks, Heat Exchanger. Stress Analysis Calculation of Oil & Water Phase Vessels (agitators) & Steam Piping. Piping Layouts for Waste Heat Recovery Boilers, Power Plant, Ho
Sprachen
Englisch
-
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.