
ibrahim ölmez
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von ibrahim ölmez
- Current 4 months, since Feb 2026
Electrical & Electronics Engineer
UNIPER-ENKA İnşaat ve Sanayi A.Ş.
I am working as a senior electrical engineer on the Uniper-ENKA Dradenau project in Hamburg, which involves the construction of a cogeneration plant (220MVA power generation (80MVA steam turbine, 2 x 70MVA gas turbines and boiler unit)). I deal wıth some tasks within the scope of electrical automation projects in the field.
- 1 year and 1 month, Feb 2025 - Feb 2026
Automation Engineer
MCFLY Robot Technologies
Robot arm installation and Packaging Plant instrumentation, electrical and automation product selection, electrical automation MCC, PLC panels, Eplan project drawing, and manufacturing of panels accordingly. In addition to panel design and project drawing in Eplan. Panel and electrical materials and field instrumentation selections are within the scope of work
- 2 years and 6 months, Aug 2022 - Jan 2025
Electrical & Electronics Engineer
Birikim Mühendislik Ve Endüstriyel Yüklenim Ltd. Şti.
In addition to the projects carried out in the mining sector, mainly in crushing screeningand flotation facilities, especially in gold mines, determining the scopeof overland conveyors, mobile transport, spreading conveyors, electrical automation and instrumentation of foreign companies in general according to the requested technical specifications, drawing the electrical-automation and P&I projects of the determined MCC, PLC, instruments ((In Autocad or Eplan.) PLC panels Eplan project drawing
- 11 years and 6 months, Mar 2011 - Aug 2022
Head of Project
Eti Mine Works General Management
1. In facility production works in enterprises (Penta 5, Değirmenözü bagging facility, Anhydrous Borax, Technology building etc.); preparation of electrical automation and instrumentation technical specifications (general preliminary energy drawings related to the scope of HV projects, LV projects, control systems and instrumentation projects, weak current system projects) (Anhydrous Borax, Technology Building, Değirmenözü Bagging Facility (Değirmenözü complete OG-AG and automation renewal)
- 7 years and 5 months, Nov 2003 - Mar 2011
Maintenance Chief
Kırka Boron Company
1. Technical failure, maintenance and revision works of HV and LV energy systems (HV transformer and circuit breaker centers, HV/LV ENH maintenance and repair, Energy monitoring and control systems, Emergency diesel generators), 2. Speed ??control devices (Siemens, Schneider, ABB. ..) connection and motorn starting works 3. Maintenance and winding works of electric motors,
Sprachen
ing
B1-B2 (Gute Kenntnisse)
deutch
A1-A2 (Grundkenntnisse)
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.
