Boon Yiong Loh

Angestellt, Director - Site Transfer Project, PerkinElmer Singapore
Singapore, Singapur

Fähigkeiten und Kenntnisse

LEAN
Six Sigma
Pharmaceutical
cGMP
Oil & Gas
AIB
Food safety
EHS
Safety
Restructuring
Computer Validation
Medical device
Biotechnology and Pharmaceuticals
Biotechnology
Specialty Chemicals
Crisis Management

Werdegang

Berufserfahrung von Boon Yiong Loh

  • Bis heute 8 Jahre, seit Aug. 2017

    Director - Site Transfer Project

    PerkinElmer Singapore

  • 1 Jahr und 2 Monate, Mai 2016 - Juni 2017

    Director, Manufacturing Operations APAC

    Align Technology

    (a) Assist in the preparation, launch and ongoing leadership of the sites in APAC as part of the Global Expansion. (b) Participate in the diligence, planning and execution of the startup operations of the APAC regional sites. (c) Started first Treat Planning Plant in Chengdu China for capacity of 200, and started work on the first manufacturing plant in Singapore outside original home base.

  • 4 Jahre und 4 Monate, Jan. 2012 - Apr. 2016

    Senior Manufacturing Manager

    Roche Singapore Technical Operations

    (a) Knowledge of both Upstream and Downstream processes for Biotechnology. (b) Successfully implemented change to increase capacity to 50% by 2013. (c) Drove improvements in efficiency and quality improvements to set network best of ATS 95% and Investigation free lots of 93% by 2014. (d) Delivered new Herceptin SC Tech Transfer, with qualification on time and in full in 2015.

  • 3 Jahre und 3 Monate, Okt. 2008 - Dez. 2011

    Plant Manager

    Nalco Pacific Pte Ltd

    - Awarded a place in the Winner's Circle, a special award reserved for Sales personnel who have made significant contributions to the business and rank among the top 3% in the company, a first from supply chain in APAC (1 out of 600 employees from AP) after 1 yr's employment. - Overall responsible for safe and efficient operations at the facilities to ensure availability and delivery of quality products to meet customer requirement, and to maximize yields, minimize overtime and ensure quality products.

  • 1 Jahr und 11 Monate, Dez. 2006 - Okt. 2008

    Production and Engineering Manager

    Givaudan Singapore Pte Ltd

    (a) Lead the Production (Fragrance and Flavour Production in Woodlands and the Flavour Production in Jurong), Engineering and Maintenance teams. (b) Establish processes, procedures and specifications to ensure efficient and effective production methods; as well as meet set quality standards (c) Ensure proper maintenance of production equipment and plant facilities to maximize asset lifecycle and minimize maintenance and replacement cost (d) Drive continuous improvements to maximize plant utilization

  • 6 Monate, Juli 2006 - Dez. 2006

    MERPS (SAP) Production Execution Lead

    GlaxoWellcome Manufacturing Pte Ltd

    (a) MERPS 2 Project’s Production Execution Lead in Jul-Dec 2006. Key contributions include: - Established the “AS-IS” process flow. - Developed the “TO-BE” process flow and accepted by stakeholders for the PE module. - Developed preliminary Business Readiness Proving scenarios.

  • 5 Jahre und 11 Monate, Aug. 2000 - Juni 2006

    Manufacturing Lead

    GlaxoWellcome Manufacturing Pte Ltd

    (b) Manufacturing Lead (equivalent to Production Manager) headed 4 shift teams and a maintenance team working in 24/7 operational production building making Sumatriptan Succinate, Ondansetron Hydrochloride, Salmeterol Xinafoate and other new products. - Handled Major CAPEX project such as developed electronic batch record and signature for new expansion building (PB3E) and conducted successful trials on new products straight from R&D. - Ensure compliances of all operations with cGMP and safety.

  • 9 Monate, Dez. 1999 - Aug. 2000

    Business Analyst

    ExxonMobil Singapore Pte Ltd

    (a) Business Analyst of Refinery Business Group in 1999-Aug 2000. Key contributions include: - Coordinated and stewarded monthly Exxon-Mobil merger related status to Regional HQ. - Prepared, aligned and coordinated Solomon Survey (Industry-wide survey) efforts for both Esso and Mobil. - Review optimum manning within newly merged Refineries.

  • 3 Jahre und 2 Monate, Juli 1997 - Aug. 2000

    Process Engineer

    ExxonMobil Singapore Pte Ltd

    - Advised on Visbreaker cycle optimisation and co-ordinated 5 cycles of decoking activities. Participated extensively in shutdown/startup activities. - Incorporated new furnace passivation procedure which enables a longer runlength. Achieved credits of about several hundred thousands of US dollars within 4 months. - Active involvement in the expansion/turnaround of APS-2 in Sep 1998. Successfully increased unit’s throughput by 6.8 % over expansion’s design. Credits of close to a million US dollars.

Ausbildung von Boon Yiong Loh

  • 4 Jahre, Juli 1993 - Juni 1997

    Chemical Engineering

    National University of Singapore

Sprachen

  • Englisch

    Muttersprache

  • Chinesisch

    Muttersprache

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z