
Chiranjib Biswas
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Chiranjib Biswas
- Bis heute 16 Jahre und 9 Monate, seit Sep. 2008
Sr Manager Corporate Quality
WNS
Heading Process Excellence Deployment across WNS globally.
- 1 Jahr und 2 Monate, Juli 2007 - Aug. 2008
Manager-LEAN Mfg Practices
Gates India
Assuring the deployment of the Lean methodology throughout organization. Implementation of Gates Production Systems (GPS) to achieve Manufacturing Excellence across organisation thru 5S,TPM, Std Work, KANBAN, SMED, VSM, Problem Solving, Error Proofing, Continuous Improvement. Lead the Senior and Operating management of assigned area to drive the Lean culture. Assess the adoption rate of Lean in assigned area of responsibility. Actively develop through mentoring process for Subject Matter Expe
- 2 Jahre und 3 Monate, Apr. 2005 - Juni 2007
Asst Manager Process Engineering
Schneider Electric India
Piloting new Projects industrialization. Design assembly & manufacturing lines with process flow, instructions, tools. Implementation of MTM125. Reduce CVD(Direct Variable Cost) by reducing labour hours Provide infrastructure & resources and plan capacity enhancement. Improve the productivity of assembly & manufacturing lines. To increase Industrial Efficiency(IE) of the plant. To increase Direct Labour Productivity (DLP) Played pivotal role in Method Engineering.
- 1 Jahr und 3 Monate, Jan. 2004 - März 2005
Asst Manager- Process Engineering
Faurecia Automotive Seating
Capacity calculation/man power calculation Process Leader for New Business Development-coordinating with suppliers for developing Press Tools, Welding-Fixtures & material handling Systems. Layout design. Fixture maintenance ECN/ECP implementation Suggestion (kaizen) implementation Preparation of BOM for new business APQP (Advance Product Quality Planning) team leader for new business Following Up the procedures & documentation to comply with TS 16949 Quality Systems.
- 1 Jahr und 10 Monate, März 2002 - Dez. 2003
Sr Executive –Engineering
Jay Bharat Maruti Ltd.
Lean manufacturing Coordinator Capacity design Line balancing Method study & improvement Work design Lay out design Process flow design & implementation Facility planning & execution in new line. Interaction with customer (Honda motor Cycles) for process development. Line installation.
- 2 Jahre und 1 Monat, März 2000 - März 2002
Sr. Engineer-Industrial Engineering
Delphi Automotive Systems
Process flow planning to ensure stabilised process Process integration in between cutting & assembly operation. Pull System Implementation & its maintenance DELPHI MANUFACTURING SYSTEMS (DMS) IMPLEMENTATION & SUPPORT-acted as DMS Coordinator, India plant, to organize audit of 6 elements of DMS biannually basis and also championed the Flow manufacturing wherein I myself was auditee. VALUE STREAM MAPPING:-Mapping the value Stream in order to visualize the whole TPCT.
- 3 Jahre und 4 Monate, Dez. 1996 - März 2000
Engineer-Quality Assurance
Shriram Pistons & Rings Ltd
Implementation & Maintenance of statistical process control (SPC) in machine shop-engine valve Process validation Core Team Member of QS9000 implementation Core Team Member for New model development project. Process capability assessment and improvement. Internal quality audit for QS9000.
Ausbildung von Chiranjib Biswas
- 3 Jahre und 10 Monate, Sep. 1992 - Juni 1996
Industrial Engineering
REC Jalandhar
Sprachen
Englisch
-
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.