Cristiano Corbetti

Angestellt, Technical OP Development Manager, Socomec S.p.A

Isola Vicentina, Italien

Fähigkeiten und Kenntnisse

Power electronics
Technology
Management
Project management
HW Development
Simulation
Switching
Analog Circuits
Head of Department
Budget
Certification
EMC measurements
Digital
Power Supplies
Electrical Powering Systems
Uninterruptible Power Supplies
Regulation
Department Management
Technical Department
Product Development
Laboratory Management
exper
Engineering
International Management
International experience
China experience
Experience China
Localization
Corporate Design Developement
Machine Welding
Power inverter
Soft Skills

Werdegang

Berufserfahrung von Cristiano Corbetti

  • Bis heute 7 Jahre und 1 Monat, seit Juni 2017

    Technical OP Development Manager

    Socomec S.p.A

    I manage a multidisciplinary department composed by 8 senior engineers. For the Italian plant: development of custom and special products The responsibility of the product portfolio The continuous improvement and the serial life management The functional coordination and budget control of the R&D The responsibility for the certifications For the Chinese and Indian plants: The supervision of the adaptations made locally The validation of the local technical activities The local R&D coordination

  • 3 Jahre und 6 Monate, Jan. 2014 - Juni 2017

    Technical Development Italy Manager

    Socomec S.p.A

    With the role of Development Italy Deputy Manager within the Power Conversion B.A. I managed 40 designers and several consultants organized into three departments. With the role of deputy China Development Manager, I managed the development team in Shanghai.

  • 1 Jahr und 7 Monate, Okt. 2012 - Apr. 2014

    Technical Development Manager (Italy and China)

    Socomec Electric Shanghai

    As expatriate in China. In this period I also kept the role of Italian development manager. the role of Italian development manager. Job Responsibilities: The recruitment and training The R&D office and laboratory setup, the research of local suppliers and local laboratories, the creation of a collaborative network with the Italian team, the product development processes deployment. To led the firmware, hardware and mechanical design activities to have a new full family of UPS.

  • 2 Jahre und 7 Monate, Apr. 2010 - Okt. 2012

    Team Leader and HW designer

    Socomec S.p.A

    With the role of technical responsible for the product development and improvement inside to the value stream UPS. Job Responsibilities: - To manage hierarchically a multi-disciplinary team with 12 people. - To take the lead for new product development - HW power electronics design (calculation, simulation, schematic, tests). - To improve the UPS quality level and manage the continuous improvement - To solve the quality issue and support all the departments - To manage the UPS Italian product family

  • 3 Jahre und 6 Monate, Nov. 2006 - Apr. 2010

    Project Leader and HW designer

    Socomec S.p.A

    Job Responsibilities: - To lead a project team in all the technical issues, on the design cycle time, within a budget reaching the targets request by the management. - HW power electronic design from single subassembly part up to the full Uninterruptible Power Supply product (from 10kVA to 120kVa).

  • 2 Jahre und 3 Monate, Sep. 2004 - Nov. 2006

    Project Leader and HW designer

    C.O.B.O S.p.A

    Job Responsibilities: - To design INVERTER controlled by DSP for electrical traction (asynch. motor) - To design power electronic converter (DC-DC) for automotive - To manage a small project team - To setup a new power electronic laboratory

  • 1 Jahr und 11 Monate, Okt. 2002 - Aug. 2004

    Project Leader and HW designer

    OSRAM

    Job Responsibilities: - To design CA/CC and CC/CC switching power supplies with high performances for led lighting (Optotronic family). - To qualify the product

  • 2 Jahre und 7 Monate, Apr. 2000 - Okt. 2002

    Project Leader and HW/FW designer

    Telwin S.p.A

    Job Responsibilities: - To design, simulate and test single phase inverter for welding machines. - The functional coordination of a small team to achieve cost/time project targets. - To set up the BOM, the schematic, the net-list, the gerber file and all the document for the mass production after the design qualification phase. - To qualify the product (EMC, LV etc.)

  • 11 Monate, Mai 1999 - März 2000

    Firmware designer

    Campagnolo S.r.l

    Job Responsibilities: - To develop micro-controllers firmware for embedded application. - To test the firmware on the target PCBA

Ausbildung von Cristiano Corbetti

  • 6 Jahre und 5 Monate, Sep. 1992 - Jan. 1999

    Ingegneria elettronica

    Università degli Studi di Padova

    Microelettronica

  • 5 Jahre und 1 Monat, Sep. 1987 - Sep. 1992

    telecomunicazioni

    Istituto Tecnico Industriale A. Rossi

  • Pianoforte

    Conservatorio Felice Evaristo dall'Abaco

    I studied piano for eight years and I did several exams at the music conservatory “Felice Evaristo dall’Abaco” in Verona. (Italy).

Sprachen

  • Englisch

    Fließend

  • Italienisch

    Muttersprache

Interessen

Piano
Scuba diving
Musical instrument

21 Mio. XING Mitglieder, von A bis Z