EVANGELOS NTOGKAS
Bis 2018, ‘Construction of THESSALONIKH METROPOLITAN RAILWAY ’ Project, AKTOR SA
TRIKALA, Griechenland
Werdegang
Berufserfahrung von EVANGELOS NTOGKAS
Bis heute 3 Jahre und 10 Monate, seit Sep. 2020
NEW PIPEWORK (UNDERWATER TWIN PIPELINES AND PLEM) IN MOTOR OIL HELLAS
ARCHIMEDES SA (Greece)
• Monitor and Oversee of the execution works for the Construction of Underwater Pipelines and Pipeline End Manifold (PLEM) for Uploading CRUDE OIL, Submarine twin pipelines 850m long each , Underwater excavation of a Trance which starts from Sea level till -50m deep, Underwater laying of Geogrids , Installation of the Twin Pipeline, Underwater embankments with granular borrow pit , Installation of Flexible Concrete Mattress above the Pipelines, Breakwaters, Construction of Compact Concrete Blocks.
9 Monate, Jan. 2020 - Sep. 2020
‘RE-CONSTRUCTION OF KOS ISLAND PORT’ Project
ARCHIMEDES SA (Greece)
Monitor and Oversee of the execution works at Re-Construction of KOS Island Port (Sea-bed dredging, Underwater Concrete Piles , Construction of Compact and Cellular Concrete Blocks for the new Dock, Rockfill prism of marine structures with rock materials, ,Underwater embankments, Rip-rap armoring of breakwaters, Marine structures with reinforced concrete, Iron quay side bollards, Harbor decking Floating docks and wave breakers).
7 Monate, Juli 2019 - Jan. 2020
‘CONSTRUCTION OF SIDEWAYS TOLL BOOTHS’ PROJECT
AKTOR SA
• Monitor and Oversee the t Construction of 10 sideways Toll Booths. • Execute precise quality control measurements, preparing technical reports, designs and drawings, • Responsibility for field surveys and quantity calculations for planning, costing analysis, claims reconciliation assessments and project control. • Managing and carrying out setting out Procedures, Develop surveying procedures according to project standards, ensured the fulfillment of them in construction works
1 Jahr und 4 Monate, Apr. 2018 - Juli 2019
‘HELLENIC MINES’ PROJECT at Grevena
HELLENIC MINES
• Monitor and Oversee of the execution works at Construction of Enrichment Plant of Chromites Ore,of Access roads on Plant and Water supply net for the Plant, of the Tailing Dam , Open Pit and Tunnels • Carrying out As-built Documentation • Responsibility for Surveying measurements, measurements for calculation of quantities and Monitoring measurements, Providing field surveys and quantity calculations for planning, costing analysis, claims reconciliation assessments and project control.
2 Jahre und 1 Monat, März 2016 - März 2018
‘Construction of THESSALONIKH METROPOLITAN RAILWAY ’ Project
AKTOR SA
• Monitor and Supervise of the execution works at Construction of Cut &Cover Tunnel total length 1 km,2 Tunnels and METRO station of N.ELBETIA • Responsible for Surveying measurements • Calculations of Earthworks’ Quantities for interim certification payments of Subcontractors • Check and Control of the Existing Geodetic Network • Setting Out Procedures
4 Jahre, März 2012 - Feb. 2016
“ HELLAS GOLD Mining Project in Kassandras Mines
AKTOR SA
• Monitor and Supervise of execution works at Construction of an Open Pit Mining, Construction of a Tailing Dam, Construction of Service Roads, Hydraulic Ditches and Box Culverts, Construction of 2 Tunnels total length 12.km, Construction of Diversion Tunnel . • Responsible for Surveying measurements • Calculations of Earthworks’ Quantities for interim certification payments of Subcontractors • Check and Control of the Existing Geodetic Network • Setting Out Procedures
3 Jahre und 3 Monate, Apr. 2008 - Juni 2011
Infrastructure works to the Municipality of PIALIA
Municipality of PIALIA
Responsible for the Cadastral Surveying, Land Surveying and Calculations of Earthworks’ Quantities for Interim certification payments of Subcontractors
1 Jahr und 5 Monate, Dez. 2006 - Apr. 2008
“Construction of Egnatia Highway” Project ,section Metsovo
AKTOR SA
• Monitor and Supervise of the execution works at Highway Construction • Responsible for Surveying measurements • Calculations of Earthworks’ Quantities for certification payments of Subcontractors and Volume Calculations • Setting Out Procedures • Check and Control of the Existing Geodetic Network * creation of 3D Terrain Models
1 Jahr und 7 Monate, Juni 2005 - Dez. 2006
“Construction of Egnatia Highway” Project, section Grevena
AKTOR SA
• Monitor of execution works at Highway Construction • Responsible for Surveying measurements, measurements for calculation of quantities and monitoring measurements • Setting Out Procedures • Check and Control of the Existing Geodetic Network
6 Monate, Jan. 2005 - Juni 2005
“Construction of Egnatia Highway” Project, section Metsovo
AKTOR SA
• Monitor of execution works at Highway Construction • Setting Out Procedures • Responsible for Surveying measurements * measurements for calculation of quantities and monitoring measurements • Check and Control of the Existing Geodetic Network
10 Monate, März 2004 - Dez. 2004
“Construction of Hydraulic Dam” Project in place Setta-Manikia, Evia.
EMPEDOS SA
• Monitor and Supervise of the execution works at Construction of Hydraulic Dam • Responsible for Surveying measurements, measurements for calculation of quantities and monitoring measurements • Calculations of Earthworks’ Quantities for certification payments of Subcontractors • Setting Out Procedures • Check and Control of the Existing Geodetic Network • Design the As Built Documentation • Volume Calculations
Ausbildung von EVANGELOS NTOGKAS
5 Jahre und 4 Monate, Sep. 1997 - Dez. 2002
DEPARTMENT OF SURVEYING ENGINEERING
Technological Educational Institute of Athens
Practice in: CONSTRUCTION OF EGNATIA HIGHWAY AT SECTION KLEIDI -KOULOURA AT THE CONSTRUCTION COMPANY AEGEK A.T.E. Work for the degree : REGENERATION AND DEVELOPMENT AREA
Sprachen
Englisch
Fließend