Eva Fitzelová

Bis 2022, Projektkoordination Stahlbau, Modis GmbH

Ludwigsburg, Germany

Skills

AutoCAD
Inventor
MicroStation
ZwCad
Autodesk Navisworks
Microsoft Office
Corel Draw
Gimp
Cinelerra
Concrete
Steel structures
Piping
Sketchup
3D PDS/Framworks

Timeline

Professional experience for Eva Fitzelová

  • Current 1 year and 6 months, since Apr 2022

    Projektleiterin Stahlbau

    Dürr Systems AG

  • 7 years and 4 months, Dec 2014 - Mar 2022

    Projektkoordination Stahlbau

    Modis GmbH

  • 1 year and 11 months, Dec 2012 - Oct 2014

    CAD designer

    Chemproces s.r.o.

    2014 Steamcracker-Renewal of pumps (GA105), Slovnaft Bratislava (WD) 2014 MOC: Flow control valve bypass, Slovnaft Bratislava (WD) 2014 Atmospheric-Vacuum Distillation (AVD6) Revamp, Slovnaft refinery Bratislava, Slovakia (WD) 2014 MOC: Sight flow indicators and drains to cooling water lines for turbines, Slovnaft refinery Bratislava, Slovakia (WD) 2013 Valve exchange on hutch water and TEG drain, Pozagas 2013 Gasifier of wood chips (WD)

  • 6 months, 2012 - Jun 2012

    Civil / Structural designer

    WorleyParsons

    Consultant engineer at ASKAF Iron Ore Project

  • 5 years and 2 months, Sep 2006 - Oct 2011

    Architect / Civil designer

    Stading s.r.o.

    2011 Manufacturing and administrative site Bratislava (DP) 2011 Weekend house in Martinské hole (BP) 2009 Company showroom and store extension, Veľký Biel (AD, BP) 2008 Reconstruction of Ice-hockey stadium (Ondrej Nepela Arena),, demolition of load bearing structures, in collaboration with Ingsteel s r.o. (BP) 2009 Storage tanks of PVAC monomer, Duslo a.s.Šaľa (BP, WD) 2007 Reconstruction of delivery area, Flourmill Pohronský Ruskov (WD)

  • 2004 - 2006

    Architect

    Work under a business licence

    2006 As-built drawings of piping in manufacture Kia Motors Slovakia s.r.o. for Chemproces s r.o. 2006 Land use plan - South city zone Kolárovo (in collaboration with Ing. arch. Pavlík and Ing. arch. Varga) 2006 Golg resort location study Veľký Biel (in collaboration with Ing. arch. Pavlík and Ing. arch. Vaškovič) 2004-2005 Bathrooms designs (AD, WD) in bathroom design studio Lucca s r.o.

  • 3 years and 5 months, Jun 2001 - Oct 2004

    Junior architect

    Atelier ART s.r.o.

    2004 Residential house Majerníkova, Bratislava (WD) 2002 Renovation of burgher's house, Bratislava (BP, WD) 2002 Polus Millenium tower building 2 in collaboration with Stafford Haensli Architects INC (BP)

Educational background for Eva Fitzelová

  • 5 years and 9 months, Sep 1996 - May 2002

    architecture

    Faculty of Architecture, Slovak university of Technology in Bratislava (STU BA)

    Katedra ochrany a tvorby v pamiatkovom prostredí

Languages

  • English

    Fluent

  • German

    Fluent

  • Czech

    Fluent

  • Slovak

    -

  • Esperanto

    -

Interests

Digital Photography
Podcasting
Graphic design

Browse over 20 million XING members