Fausto Longo

Bis 2015, Senior Project Engineer, ECOTEK Services, Inc. Panamá
Glasgow, Vereinigtes Königreich

Fähigkeiten und Kenntnisse

Knowledge of American - European - British standar
Ability to work globally (EU - Latin America)
Managing and Coordination experience
Flexibility
Technical and Commercial Knowledge
Team leadership and Provided training experience
Analytical - Tenacious
Helpful attitude - Team work spirit
Planning and Organizing skills
Enthusiastic
Driving consensus among stakeholders
intercultural competence
self-motivated
Designing - Construction experience
ETAP
DIALUX
PVSyst
EnergyPlan
AutoCAD
Homer
Mathcad
MicroStation
Autodesk Revit
MERIT
ESP-r
HEM
Microsoft Office
Microsoft Outlook
Microsoft Project

Werdegang

Berufserfahrung von Fausto Longo

  • 7 Monate, Okt. 2014 - Apr. 2015

    Senior Project Engineer

    ECOTEK Services, Inc. Panamá

    o Reducing dramatically the electrical risk in hazardous areas and increasing notably the efficiency of existing medium size electrical systems in medium (MV) and low (LV) voltage for industrial outdoor and indoor installations and commercial building services to national and international customers. o Responsible for the supervision of 2 junior engineers, technicians and contractor activities. o Developing technical reports, drawing details, calculations, and specifications for the installation.

  • 5 Jahre und 11 Monate, Dez. 2008 - Okt. 2014

    Electrical Engineer

    ENGINEERING FLB. Venezuela

    o Managing, planning and designing successfully the expansion (+300%) of electrical systems in buildings with +60,000m2, acquiring the opportunity to support through the prosperous partnership multidisciplinary new projects. o Responsible for the design, planning and installation work in the 3MVA sensitive energy supply and backup power system (45,000 m2). o Successful energy saving study, defining improvements on the MEP systems to reduce the CO2 emissions and energy consumption by +44%.

  • 1 Jahr und 3 Monate, Juli 2008 - Sep. 2009

    Project II Engineer

    INELECTRA, Venezuela

    o Successfully designed and delivered electrical protections systems, reducing the document delivery time in more than 25% (from 21 days to 15 days). o Responsible for the supervision of 2 senior CAD technicians, and identifying assertively the installation conflicts between each discipline to provide feasible designs as planned. o Participating in drawing and document review workshops with management and contractors.

  • 1 Jahr und 4 Monate, März 2007 - Juni 2008

    Engineering & Construction Manager

    SEVENTEC CORPORATION, Venezuela

    o Leading, planning and managing successfully the expansion of +550 existing radio bases and shelters around the country in 18 months, supervising effectively 6 Junior Engineers, supported by 4 Intermediate CAD technicians and +15 contractors. o Achievement on the reduction of 12% in the budget of multiple projects execution and constructions delivery time with more than 7% in advance. o Provided training on electrical installations and safety regulations to Engineers and technicians.

  • 1 Jahr und 2 Monate, Feb. 2006 - März 2007

    Engineering Coordinator

    SEVENTEC CORPORATION, Venezuela

    o Responsible for the design, activity planning and installation works, mentoring of 3 Junior Engineers and 2 CAD technicians. o Participating in drawing and document review workshops with management and contractors, including the proposal of the technical solution on site for multiple constructions. o Assertive technical solution negotiation with clients in the scope of work and developing new strategies for project implementation, improving in 30% the project delivery time (from 30 days to 22 days).

  • 9 Monate, Juni 2005 - Feb. 2006

    Project Engineer

    SEVENTEC CORPORATION, Venezuela

    o Effective 100% acting as the liaison with the Enterprise and the Client for design approval. o Responsible for the activity planning and developing of technical solutions of the Company. o Providing training and technical support to the business department, increasing sales by 35%.

Ausbildung von Fausto Longo

  • 1 Jahr und 1 Monat, Sep. 2016 - Sep. 2017

    Sustainable Development

    University of Strathclyde

    Group Project: Sustainable Energy Development: Designing a 4th generation district heating to cover the energy demand. Core modules: Electrical Power Systems, Energy Systems Analysis, Energy Modelling, Energy Resources - Policy, Sustainability, Financial Engineering, Risk and Project Management.

  • 1 Jahr und 2 Monate, Juni 2006 - Juli 2007

    Electrical Engineering

    Universidad Simón Bolívar

    Core modules: Electrical Installations I and II, Electrical Energy Distribution, Industrial Power Systems, Protection Systems II, Power Controller II, Electrical Actuator, Lighting.

  • 10 Jahre und 11 Monate, Sep. 1993 - Juli 2004

    Electrical Engineering

    Universidad Central de Venezuela

Sprachen

  • Spanisch

    Muttersprache

  • Englisch

    Fließend

  • Italienisch

    Grundlagen

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z