İlker Gülcü

Angestellt, Planning Manager, Advanced Construction Technologies (ACT)

Doha, Katar

Über mich

I have been working as a Planning and Project Control Manager for fifteen years. I have a wealth of international experience working on various construction sites such as housing, hotels, sports complexes, military complexes, industrial complexes, infrastructure and highways. I have worked for successful Turkish and Italian construction companies, on projects for clients have included organizations and companies such as the US Army Corps of Engineers, US Air Force, VBR, AECOM, Hill International, General Electric. My Expertise; · Preparing and updating the work schedule (Primavera & MS Project) · Devising plan and cost control reports · Formulating and following up the claim and bid files · Controlling and updating the budget to check actual realizations · Establishing procurement and stock management system · Experience in international projects (in Turkey, Libya, Turkmenistan, Kuwait, Algeria, Qatar) · Fluent in English and Turkish, Beginner in Arabic

Fähigkeiten und Kenntnisse

Construction
Project Management
Planning
Cost Control
Primavera
MS Project
MS Office
AutoCAD
BIM
Nemetschek Allplan
SAP ERP
Team Management
Roads and Highways
Building Information Modeling
Building
Infrastructure
Skyscrapers
Civil Engineering

Werdegang

Berufserfahrung von İlker Gülcü

  • Bis heute 5 Jahre und 3 Monate, seit Apr. 2019

    Planning Manager

    Advanced Construction Technologies (ACT)

    Design, procurement and build of 10 main buildings (Headquarters, Training Centre, Cyber Security, Electronic Warfare, Data Center, Communication & Monitoring Unit, IT Unit, Officer Guesthouse & Club, Sports Hall, Mosque (1000 persons)) with 135.800 m² total covered area and infrastructure works (roads, utilities, substations, chiller yards) for total of 616.585 m² new military camp area.

  • 1 Jahr und 5 Monate, Aug. 2017 - Dez. 2018

    Senior Planning Engineer

    Renaissance Heavy Industries

    Project Name: Realization of Gas/Steam Turbine Factory Complex for General Electric Work Description: The scope of project includes design, engineering, procurement of equipment, materials, supervision of civil works and construction, installation, assembly, testing and commissioning of industrial complex which includes gas/steam turbine assembly and maintenance plants, offices, facilities and exterior utilities. Factory has 27000 m² closed construction area in 15 ha site area in Batna/Algeria

  • 1 Jahr und 2 Monate, Juli 2016 - Aug. 2017

    Planning Manager

    Salini-Impregilo Kolin Joint Venture

  • 2 Jahre und 1 Monat, Juni 2014 - Juni 2016

    Project Control Manager

    Polimeks Construction

    The Project consists of 290.000 m² closed construction area is the part of phase III of the Olympic complex which has 1.3 billion m² site areas. The design-build project included 14 ea. hotels which each has 12 floor, 1356 residence units and closed 255.000 m² construction area, 1 ea. 3 floored culture/dining building (15.000 m² of closed area), 1 ea. 4 floored International Broadcasting Center ((13.000 m² of closed area), and 1 ea. Operation Center (3.000 m² of closed area).

  • 2 Jahre und 5 Monate, Feb. 2012 - Juni 2014

    Project Control Manager

    Emta Ilci Joint Venture

    Improve Military Family Housing (Falcon & Phantom) Project Phase II (336 Villa Units) The design-build project included interior and exterior modernization, renovation and reinforcement of 336 dwelling units (50.000 m² of closed area), adding rooms to some dwelling units and upgrading exterior works such as the pavements, utility systems, playground, landscaping.

  • 1 Jahr und 3 Monate, Dez. 2010 - Feb. 2012

    Planning and Cost Control Engineer

    Caliskan Construction - Sinpas

    The project included construction of various types of villas and multi-story residences which have construction area of 65.000 m² and the main infrastructure works.

  • 9 Monate, März 2010 - Nov. 2010

    Planning and Cost Control Chief Engineer

    Kolin Construction Inc. Co.

    The project involved all earthworks, road works (40km), storm water drainage network (200 km), sewerage network (50 km), water supply network(140 km) , irrigation network (40 km) , bridges , electrical and telecommunication distribution network, pump stations , chlorination plant, street lighting, landscaping of 830 hectare public housing area (10680 units)

  • 1 Jahr und 9 Monate, Juli 2008 - März 2010

    Planning and Cost Control Engineer

    Kolin Construction Inc. Co.

    The design-build project included interior and exterior modernization, renovation and reinforcement of 235 dwelling units (35.000 m² of closed area), adding rooms to some dwelling units and upgrading exterior works such as the pavements, utility systems, playground, landscaping.

  • 1 Jahr und 5 Monate, März 2007 - Juli 2008

    Civil Engineer

    Irmak Construction Inc. Co.

    Irmak Construction was the main subcontractor of Tekfen and Metiş companies worked in construction of highway infrastructures (bridges, culverts, drainage lines, …) in Gaziantep-Birecik Highway Project and Gaziantep Ring road Project. Project 1: Gaziantep-Birecik Highway Construction Project 2: Gaziantep Ring road Construction

Ausbildung von İlker Gülcü

  • 5 Jahre und 5 Monate, Sep. 2002 - Jan. 2008

    Civil Engineering

    University of Gaziantep

Sprachen

  • Englisch

    Fließend

  • Türkisch

    Muttersprache

  • Arabisch

    Grundlagen

Interessen

Trekking
Football
Swimming
Blockchain
Travel

21 Mio. XING Mitglieder, von A bis Z