Karzan Abdulrahman

Angestellt, Project Manager, Palkana
Deutschland

Fähigkeiten und Kenntnisse

Project management
BIM
Autodesk Revit Architecture
Project Planning
Scheduling
Estimation
AutoCAD
Microsoft Excel
Microsoft Word
Suretrak (Primavera)
Construction site
Construction layout
Construction site surveying

Werdegang

Berufserfahrung von Karzan Abdulrahman

  • Bis heute 8 Jahre und 1 Monat, seit Juli 2017

    Project Manager

    Palkana

    Planned, managed and worked as the senior engineer on the construcion of a 100 x 50 Meter palletizer warehouse, support buildings, and circulation system for LafargeHolcim Bazian cement company

  • 1 Jahr und 9 Monate, Juni 2014 - Feb. 2016

    Site Engineer

    Zarya Construction Co

    Site Engineer at the Kurd Towers (a 35 story building with 6 basements, to be the tallest building in Iraq). Oversaw site work, pile construcion, and participated in planning for construction

  • 1 Jahr und 7 Monate, Okt. 2012 - Apr. 2014

    Company’s Senior Engineer

    Palkana

    - Oversaw the designing and planning phase of a 400 house project in Kirkuk. Gave recommendation for changes in the design. - Prepared change orders, made Revit models and complete modified drawings and material take off for a 9 story building.

  • 1 Jahr und 7 Monate, Apr. 2011 - Okt. 2012

    Project Manager

    Hamagharib Company

    Women Shelter Building, Sulaimaniyah, Iraq 3600 square meter Site, 3000 Square meter Building area - Managing and responsible for all engineering aspects of the project

  • 1 Jahr und 3 Monate, Juli 2009 - Sep. 2010

    Project Manager

    Palkana

    Ali Askary Mosque and Library (3300 Sqm. Bldg. Area, 3000 Sqm. Site Work) - Malik Mahmood Street: 15 underground water reservoirs and 5 km curbstone Was responsible for managing and all engineering issues related to both projects. All survey, Material quantity calculations, change orders, payments, subcontractor management, quality management, , handover, etc.

  • 9 Monate, Okt. 2008 - Juni 2009

    Resident Engineer

    Crescent petrolium

    Working as owner’s resident engineer on an 11km asphalt road. Ensuring compliance of work with project requirements.

  • 8 Monate, Jan. 2008 - Aug. 2008

    Research assistant & teaching assistant

    Michigan State University

    -Conducted research with Dr. Matt Syal on Role of Electrical Contractor’s on LEED® Projects -Gave several lectures and evaluated student projects and assignments for Construction Project Management and Blueprint Reading classes

  • 2 Jahre und 1 Monat, Aug. 2004 - Aug. 2006

    Site Engineer

    Hoshyar Company

    Construction of Library (2,500 Sqm.), Apartment Bldg. (1,500 Sqm.) - Supervised the construction of both buildings throughout all construction phases, -was responsible for technical issues as well as management aspect of the projects -Hold construction meetings, managed general and subcontractors work, prepared payments, change orders, managed testing activities, etc.

  • 7 Monate, Feb. 2004 - Aug. 2004

    Site Engineer

    Hasan Company

    Construction of Sewerage Network -As a site engineer supervised construction of a sewerage network composed of large sewer concrete boxes and smaller circular sewer pipes -Established benchmarks and updated profiles for the network lines -Supervised layout, excavation, construction of foundation bed, masonry, concrete work, backfilling and finishing of the sewer boxes. -Attended construction meetings, participated in preparing measurements, payment etc.

  • 6 Monate, Aug. 2003 - Jan. 2004

    Logistician

    HelpAge International

    -Was responsible for office logistics -Was responsible for refurbishment and minor renovations to Sulaimany older people’s home

  • 8 Monate, März 2003 - Okt. 2003

    Teaching Assistant

    University of Sulaimani

    Assisted in engineering college labs

  • 1 Jahr und 7 Monate, Okt. 2000 - Apr. 2002

    Site Engineer

    Nawroz

    Construction of 162 houses with Sewerage Network - Participated in all phases of the construction with a team of field engineers - Was responsible for layout, surveying, quality control, measurement, etc. - Was responsible for punch list management and handover of the housing units - Established benchmarks and prepared profiles for all the sewer lines

Ausbildung von Karzan Abdulrahman

  • 2 Jahre und 1 Monat, Aug. 2006 - Aug. 2008

    Construction management

    Michigan State University

  • 3 Jahre und 11 Monate, Sep. 1996 - Juli 2000

    Building construction-College of Engineering

    University of Sulaimani

Sprachen

  • Englisch

    Fließend

  • Arabisch

    Fließend

  • Türkisch

    Grundlagen

  • Kurdish

    -

  • Persian

    -

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z