
Luca Forzani
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Luca Forzani
- Bis heute 14 Jahre und 3 Monate, seit Mai 2011
Deputy Facility Manager
DONG Energy E&P
Deputy facility manager responsible for Solsort facility development. Generate input for full offshore field development studies, strategy, risk and opportunity evaluations. In charge of facility aspects and coordination with various disciplines. Manage progress and resources assigned to the project.
- 1 Jahr und 3 Monate, Feb. 2010 - Apr. 2011
Offshore project engineer & package leader
OMV Tunisia
Facility and package leader, responsible for major and minor improvements consisting of CO2 pre-treatment and membrane removal unit, new separation facility, installation of submarine 11kV cable, temporary crawler crane LR1350. Design of new tie-ins, planning of platform shut-downs, compilation of job cards and pre-commissioning procedures. Manage of constructability, local engineering resources, contract follow-up, HAZOP and safety reviews.
- 2 Jahre und 11 Monate, März 2007 - Jan. 2010
Mechanical Project Engineer
OMV New Zealand
Facility / Mechanical Project Engineer for OMV E&P. I am currently working in NewZealand, on- and offshore for the Maari Development, Wellhead Platform (WHP) self-installable concept. Hook-up and commissioning, Work-over Unit installation and interface management (WHP/drilling rig/WOU/FPSO).
- 1 Jahr und 11 Monate, Apr. 2005 - Feb. 2007
Mechanical Engineer
OMV E&P
Facility / Mechanical engineer for OMV E&P. I have provided technical support, facility concept definition, outlined feasibility studies, generated CAPEX and OPEX estimates fruitful for invest/divest decision making process (on/offshore developments) and offshore facility benchmarking studies. I
- 2 Jahre und 7 Monate, Sep. 2002 - März 2005
Mechanical Engineer - Offshore
ENI E&P
Construction engineer for ENI E&P - Offshore dept. I was involved in basic design and project execution for offshore field developments, mainly focused on technical aspects, logistics and installation campaign definition but also participating to the ITT preparation and consequently to the bidder s
- 4 Jahre und 9 Monate, Jan. 1993 - Sep. 1997
CNC Operator
F.B. Metal workshop - Italy
Experience as operator at milling machines and lathes (conventional and CNC), practice in the metal cutting techniques, shearing, cold forming, heat treatment, galvanising, and welding by specialized workshop for mechanical components. Support of the technical office activities: design and material
Ausbildung von Luca Forzani
- 2 Jahre und 3 Monate, Juli 1998 - Sep. 2000
Mech Engineering
T.U.Delft
TIME Exchange Program 1998-2000. MSc in Mechanical Engineering: Energy Cycles, HC Recovery and Processing. Specialized Courses: Combustion Cells, Offshore Engineering, Hydrodynamics, Pneumatic / Oleodynamics, Oil Geochemistry. - Design Workshop 1999 (Kirkham, UK) by British Aerospace (innovative a
- 6 Jahre und 10 Monate, Sep. 1995 - Juni 2002
Mechanical Engineering
Politecnico di Milano, Italy
MSc in Mechanical Engineering: Energy Cycles, HC Recovery and Processing. Final mark: 93/100. Thesis developed with AGIP Offshore dept.: “Analysis/Design of an alternative method for Short Rigid Jumper retaining”.
- 4 Jahre und 10 Monate, Sep. 1990 - Juni 1995
Mechanics
I.T.I.S. “Galileo Galilei”, Milan - Italy
Technical Diploma in Mechanics. Final mark: 60/60. Final project: “External Combustion Engine” construction and assembly of functioning prototype.
Sprachen
Englisch
Fließend
Italienisch
Muttersprache
Niederländisch
Gut
Deutsch
Gut
Französisch
Grundlagen
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.