Ing. MUHAMMAD JUNAID
Abschluss: Master of Science (M.S.), Politecnico di Milano
Milan, Italien
Werdegang
Berufserfahrung von MUHAMMAD JUNAID
1 Jahr und 9 Monate, Jan. 2015 - Sep. 2016
Production Engineer
Dollar Industries Private Limited
The main responsibility was to monitor, execute and control the production departments (Manual Assembly, Printing and Packing) as per Monthly Scheduled Plan. Co-ordinate with the Material, Product Development, Plant Engineering and Quality Department to run the production smoothly. Managed to solve the daily basis production issue.
1 Jahr und 4 Monate, Sep. 2013 - Dez. 2014
Planning Officer
Artistic Milliners Private Limited
The main responsibility was to plan the raw material through MRP system and ensured that these were within predefined inventory level to meet the production requirements.
8 Monate, Jan. 2012 - Aug. 2012
Management Trainee
Al Abbas Garments Private Limited
1. Study the Process of Production of Knitting, Dyeing, Cutting, Stitching and Finishing. 2. Working on the line balancing of Cutting and Stitching Department under the supervision of Assistant Manager Production.
1 Monat, Juli 2012 - Juli 2012
Engineering Intern
Dawlance Group of Companies
Exercise the Design of Experiment (DOE) in the Thermoforming Process to control the variation in the production of Door Liners
1 Monat, Juni 2011 - Juni 2011
Engineering Intern
SuperTech Autoparts Private Limited
Study the process of different manufacturing motorcycle parts and working on the Muffler Assembly Layout.
Ausbildung von MUHAMMAD JUNAID
1 Jahr und 10 Monate, Okt. 2016 - Juli 2018
Engineering Management
Politecnico di Milano
Operation Management Logistic Management Industrial Technologies Quality Management Supply Chain Management Leadership and Innovation Strategy and Marketing Business and Industrial Economics Account, Finance and Control Asset Life Cycle Management
4 Jahre, Jan. 2009 - Dez. 2012
Industrial and Manufacturing Engineering
NED University of Engineering and Technology
Thesis: Implementing Six Sigma Methodology to raise the sigma level of the machining process, manufactured by the CNC Machine to prevent rejection and to meet the maximum monthly production by saving the cost of PKR. 20/unit
Sprachen
Englisch
Fließend
Italienisch
Grundlagen
Urdu Hindi
-