Metin Ali Baran

Angestellt, Civil Works Chief, RÖNESANS ENDÜSTRİ TESİSLERİ
Istanbul, Germany

Skills

Construction
Construction Management
Project Coordinating
General Management
Project Management
AutoCAD
MS Office
Leadership
Civil Engineering
SIMOPS
OIL&GAS
BROWNFIELD
LIVE LINE

Timeline

Professional experience for Metin Ali Baran

  • Current 11 months, since Jun 2025

    Civil Works Chief

    RÖNESANS ENDÜSTRİ TESİSLERİ

    Managing civil works execution for OPF tie‑in and outlet compressor facilities within operating brownfield gas plant. Leading civil construction works within a $175M gas plant project, including piling, reinforced concrete foundations, excavation works, underground utilities and structural interfaces for OPF tie-in and outlet compressor facilities within an operating plant environment. Leading SIMOPS activities and shutdown construction within a live gas processing facility.

  • 11 months, May 2024 - Mar 2025

    CIVIL WORKS CHIEF

    ENTEGRE PROJECT MANAGEMENT

    Supervised bored pile and ground improvement works for 25,000 m² deep basement excavation. Coordinated construction activities for 150,000 m² office and parking complex.

  • 9 months, Aug 2023 - Apr 2024

    CIVIL WORKS SUPERINTENDENT

    YEO TECHNOLOGY ENERGY AND INDUSTRY INC.

    Coordinated and Inspected civil and mechanical works of Solar&Wind Energy Plants, GIS and Industrial Projects as per standards. Designed and constructed Transformer & Kiosk Foundations and drainage works of Solar Energy Plants with an average power of 15 MW.

  • 7 years and 8 months, Dec 2015 - Jul 2023

    Co-Founder

    MAFF YAPI

    Completed the construction of the residential turnkey buildings of 12 nos different projects with an average area of 2000 m2 in accordance with the Turkish earthquake regulations. Ensured the feasibility of the project and the approval of the construction, mechanical and electrical projects by the municipalities

  • 2 years and 9 months, Mar 2013 - Nov 2015

    GENERAL MANAGER

    YMTEK YAPI

    Completed turnkey projects of 24 villas with an average area of 800 m2 Realized the projects without harming the environment and within a limited time.

  • 2 years, Mar 2011 - Feb 2013

    CIVIL WORKS SUPERINTENDENT

    TEKFEN CONSTRUCTION AND INSTALLATION CO., INC

    SOUTH ELOTEN (GALKYNYSH) GAS FIELD DEVELOPMENT PROJECT Completed civil and mechanical works of EPC Administrative Buildings and Steel Control Buildings Coordinated the purchasing, material approval and supply works of Administrative Control Building Managed the construction of Tanks, Equipment Foundations, Pump, Steel and Pipe Foundations Controlled mechanical installation works of HVAC and equipment installation.

  • 10 months, May 2010 - Feb 2011

    Construction Manager

    İSTANBUL TEKNİK CONSTRUCTION, GEOMEMBRAN AND GEOWALL

    Completed 2,5mm HDPE membrane installation works of 10.000 m2 evoporation ponds as a subcontractor of GAP Construction in Turkmenistan. Controlled Geomembrane and Geowall Application in Domestic and International Construction Sites

  • 1 year and 2 months, Mar 2009 - Apr 2010

    Construction Manager

    PROMERQATAR CONTRACTING CO.W.L.L

    Coordinated the construction of Al-Khor Hospital (25.000 m2) located in Doha/QATAR Managed revision drawings, technical correspondence

  • 4 months, Dec 2008 - Mar 2009

    SITE ENGINEER

    TEKFEN CONSTRUCTION AND INSTALLATION CO.,INC

    Jubail-MA'ADEN PHOSPHATE Phosphoric Acid Utility Completed the construction of Cooling Tower Coordinated the concrete works of Phosphoric Acid Tanks Inspected construction and installation works as per specifications and ISO 9001,Eurocode standarts.

  • 2 years, Jan 2007 - Dec 2008

    SITE ENGINEER

    TEKFEN CONSTRUCTION AND INSTALLATION CO.,INC

    Rabigh Refinery Development Project (ARAMCO&,) Worked as a site engineer of 42000 m3 reinforced concrete scope Managed the precast fabrication and installation of 8000 nos pipe sleepers and pipe- rack foundations Managed the concrete works,installation and mechanical works of pumphouse stations,lifting stations Organised the precast fabrication of 2 km Box-Culverts and Manholes Completed the Infrastructure works, water line manufacturing, installation of RTR pipes

  • 5 months, Aug 2006 - Dec 2006

    SITE ENGINEER

    TEKFEN CONSTRUCTION AND INSTALLATION CO.,INC

    Kashagan Refinary Development Project Coordinated the concrete works and inspections of 15000 m3 Managed the concrete works of Substation Buildings, Utility Pumphouses and Fire Stations.

Languages

  • Turkish

    C2 (Expert / native speaker)

  • English

    C1 (Fluent)

XING – The jobs network

  • Over 1 million jobs

    Find just the right job for you on XING.

  • Job offers just for you

    Get found by employers and over 20,000 recruiters.

  • 21 million members

    Connect with new people and gather inspiration to boost your working life.

  • Free membership

    Basic membership is free, but the opportunities are priceless.

Browse over 21 million XING members