Muhammad Munir Ahmed
Bis 2024, Manager Building, Allied Bank Limited
Dubai, Vereinigte Arabische Emirate
Über mich
Skilled and experienced Electrical Engineer with 15+ years of experience in electrical systems for various industries. My experience includes operation and maintenance of Gensets, electrical installations, fault trouble shooting of factory machines, PLC/HMI based automation of machines. I am confident in working within any factory or facility, in the installation and troubleshooting team.
Werdegang
Berufserfahrung von Muhammad Munir Ahmed
4 Jahre und 4 Monate, Okt. 2019 - Jan. 2024
Manager Building
Allied Bank Limited
I oversee a diverse team handling electrical, Genset, firefighting, and housekeeping operations of essential systems like electrical distribution, Gensets, elevators, HVAC, solar, and UPS. Managing SLAs for Gensets, elevators, HVAC, and fire alarm systems, monitor performance metrics, resolve issues, and conduct preventive maintenance, fire prevention measures. Identified the lack of lightning arrester in the building and get them installed by collecting the quotations and getting approvals from management.
3 Jahre, Juli 2015 - Juni 2018
Freelancer
Nil
Installed PLC automation system to control diesel filling of 02 No. diesel tanks. System includes Mitsubishi PLC and process instruments like RTC, ADC and DAC modules, ultrasonic 4-20mA level sensors, Installed PLC on the 30 stations PU plant (shoe making), Weintek HMI, Incremental encoder, and 04 No. Inverters. Carried out construction of houses and provided turn key solution, this included complete civil, electrical, plumbing, paint, wood work and all the other necessary works.
3 Jahre, Juli 2015 - Juni 2018
Manager Electrical
Madina Engineering Services
Responsible for PM and CM activities of client Generators and provide solutions for PLC based automations and responsible for electrical installations of clients in Banks, Hospitals and buildings.
3 Jahre und 7 Monate, Sep. 2011 - März 2015
Assistant Manager Electrical
Mannan Shahid Forgings
Automated the multiple forging presses upto 4000 tons, cold coining press, Air Compressors 250KW, Induction heater 150KW with Fatek and Mitsubishi, Siemens S7-200 and LOGO PLCs, incremental encoder and DAC module Changed the control systems of 1500KVA Cummins Diesel Genset, 2000KVA &600KVA Jenbacher Gas Genset. Designed and installed the 8MW LV system of Forging Plant-ll, Dehydration of distribution transformers upto 2500KVA, Trained the Colleagues. SAFETY FIRST to minimize EHS risk.
1 Jahr und 4 Monate, Juni 2010 - Sep. 2011
Senior Engineer
Mobiserve Pakistan
Activated 8 No. Conventional FM200 based Fire Fighting Systems. Oversaw and coordinated six teams across four cities, assigned to MSCs (Mobile Switching Centers) of Mobilink. operation and maintenance of various systems, including Gensets, power systems, HVAC systems, electric power distribution, ATS panels, fire alarm systems, DC batteries controllers, and other activities within the MSCs. Conducted training sessions for staff to enhance their ability to troubleshoot
1 Jahr und 11 Monate, Aug. 2008 - Juni 2010
Engineer E & I
AA Spinning Mills Limited
Implemented eAM system to streamline maintenance processes by planning all the PM activities. Carried out troubleshooting of Siemens inverter parameters & PLC systems. Additionally, miscellaneous tasks included enhancing the earthing system and conducting maintenance on the low voltage (LV) Panels. Troubleshooting and parameterization of inverters and HMIs were carried out. Used DMK32 energy analyzers by using RS485 to RS232. Construction and electrical installation of 5.4MW Niigata Genset energy plant.
3 Jahre und 6 Monate, März 2005 - Aug. 2008
Jr. Foreman Electrical
Interloop Holdings Private Limited
Responsible for operation and maintenance of Power House having 2 No. Diesel and 1 No. Gas Genset, auxiliaries like water circulation pumps, cooling towers, ventilation fans, Heat Exchangers, TDS and pH monitoring of cooling towers, maintenance of magnetic contactors, annual maintenance of LV bus bars, hourly log sheets of gensets. Installed PLCs to control 08 No. suction blowers Carried out calibration procedures for diesel tanks, Prepared secondary containment of diesel tanks AutoCAD to prepare drawings
Ausbildung von Muhammad Munir Ahmed
2004 - 2006
Electrical Power Engineering
University of Engineering and Technology, Lahore
2002 - 2004
Electrical Power Engineering
University of Engineering and Technology, Lahore
1996 - 1999
Electrical
Punjab Board of Technical Education, Lahore
Sprachen
Englisch
Gut
Urdu
Muttersprache