PENDYALA RAMESH BABU

Angestellt, Project Manager, Saudi Pharmaceutical Industries & Medical Appliances Corporation (SPIMACO)
Buraidah, Qassim, Saudi Arabia

Fähigkeiten und Kenntnisse

Project management
HVAC Management
Operations management
Engineeirng
Maintenance Management
Qualification
Commissioning
CGMP
Quality Management
CAPA
Maintenance
Scheduling
Planning
Budgeting
5S

Werdegang

Berufserfahrung von PENDYALA RAMESH BABU

  • Current 10 years and 3 months, since Mar 2016

    Project Manager

    Saudi Pharmaceutical Industries & Medical Appliances Corporation (SPIMACO)

    • Responsible for managing multiple projects. Identifying action plans, milestones, planning and scheduling to oversee the entire duration of project construction, and ensure that the contractor abides with all the provisions of the contract, and to identify and report variances to the Engineering & Facility Director and/or Higher Management.

  • 7 months, Jul 2015 - Jan 2016

    HVAC Consultant

    Leap29 & Procorre - UK

    Worked as HVAC Consultant for SPIMACO

  • 4 years and 4 months, Apr 2011 - Jul 2015

    Associate Director - Engineering Services

    Dr. Reddys Laboratories Limited, Biologics

    • Construction, Mechanical Completion, Commissioning, Qualification (CTP, MC, IQ, OQ and PQ) Validations successfully completed for direct, indirect and no impact systems of 21 AHUs as a HVAC System owner with zero critical, major deviations for Cell Culture Manufacturing facility. • Operation and Maintenance done for 310 Equipment Air Handling Units, Black utilities chillers, cooling towers, Refrigeration Equipment Cold Rooms, Deep freezers, Clean Room Equipment and Bio Safety Cabinets

  • 1 year and 5 months, Dec 2009 - Apr 2011

    HVAC Lead Mechanical Engineer

    Bovis Lend Lease Pharmaceuticals Ltd., Singapore

    HVAC Mechanical Completion, Commissioning, Testing, Adjusting, Balancing, Validation and Qualification completed for Baxter Project in Singapore. HVAC Construction, Commissioning, Testing, Adjusting, Balancing, Validation and Qualification completed for Lonza Biologics Plant-2 – Singapore.

  • 2 years and 1 month, Nov 2007 - Nov 2009

    Sr. ACMV Engineer

    Amec Foster Wheeler

    Commissioning, Qualification and Validation of the system including a total of 57 Supply Air Handling units, 47 Exhaust Air handling units, 106 Re-heating and cooling coil units, 4 No’s Dehumidifiers, 85 Nos. Unit Coolers. Static and Dynamic Balancing Completed with designed airflows, room pressures and temperatures along with IQ, OQ, PQ Validation activates i.e. Air change profile, HEPA Integrity test, Non viable particle count, temperature trending, room pressures and air flow patterns.

  • 1 year and 7 months, Apr 2006 - Oct 2007

    Manager - Projects

    Nectar Life sciences Limited

    Projects Handled: Sterile API Class 100 (Grade -A / ISO 5), Formulation Facility with Modular SS / GI Powder coated clean room panels, Empty Hard gelatin capsule facility, QC & Microbiology Lab, Warehouse and Menthol Plant. • HVAC Designing Review done for Heat Load Calculations, Room Data Sheet with personnel, equipment, electrical, heat loads, duct design with minor equipment, AHU Design. • Projects Executed with Commissioning, Qualification and Validation.

  • 3 years and 1 month, Mar 2003 - Mar 2006

    Assistant Manager

    Aurobindo Pharma Ltd.

    Projects Handled: 2 Nos of API Sterile facility with Grade A - ISO 5 with SS cleanroom panels • Specifications and BOQs prepared for HVAC system, Modular Clean Room panels and BMS system. • Data sheets prepared for HVAC and related equipment. • API sterile facilities with Grade A ISO 5 with SS panels Project executed Commissioned, Qualification and Validation done with Building Management System and as well as documentation completed for HVAC System.

  • 1 year and 10 months, Jun 2001 - Mar 2003

    Executive-HVAC-QA

    Bharat Biotech International Ltd,

    • Project Executed with Commissioning, Qualification and Validation of Modular Clean room panels and HVAC System with 48 Air Handling Units. • HVAC IQ, OQ, PQ protocols prepared and executed. Scheduled validations done for HVAC System. • Major Audits Faced: WHO-Geneva, Wyeth Lederle USA.

Ausbildung von PENDYALA RAMESH BABU

  • 4 years and 1 month, Dec 2003 - Dec 2007

    Mechanical Engineering

    JRN Rajasthan Vidyapeet University, India

    Bachelor of Engineering (Mechanical)

  • 7 months, May 1996 - Nov 1996

    Refrigeration and air conditioning systems

    Setwin

    Refrigeration and Air Conditioning

  • 3 years and 5 months, Dec 1991 - Apr 1995

    Mechanical Engineering

    SS Govt Polytechnic

    Mechanical Engineering

Sprachen

  • English

    C2 (Verhandlungssicher / Muttersprachlich)

  • German

    A1-A2 (Grundkenntnisse)

  • Telugu

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 21 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z