- Bis heute 7 Jahre und 1 Monat, seit Apr. 2018
New works Manager
LafargeHolcim, Mombasa Plant -KENYA
Streamlining projects department interms of cost reporting and Job tracking Achievement:- Spent 5.6M CHF against 8.0M CHF, Improved the departmental cross functional works by involvement of the section heads.
- Bis heute 14 Jahre und 4 Monate, seit Jan. 2011
New Works ENGINEER
Lafarge Bamburi
Responsible for new projects or expansion in the plant
- 1 Jahr und 5 Monate, Okt. 2008 - Feb. 2010
Projects Manager (long term mission)
Lafarge, Hima Plant -UGANDA
Installed a Gas conditioning Tower on 650 Ton/day Kiln [euro 0.97M] Achievement: - controls temperature to the filter, reduce dust emission and filter maintenance cost. Managed all CAPEX projects at Hima Cement including the Plant Fire suppression system [euro 1.9M] Achievement:- Reduced Plant Insurance premiums and better preparedness in the event of fire
- 2 Jahre und 1 Monat, Okt. 2006 - Okt. 2008
New Works Engineer
Lafarge, Mombasa Plant - KENYA
Shell change totaling 30.75 metres with a new outlet section on a 1965 Ton/day Kiln [euro 1.0M] Achievement:- Improved Kiln reliability and increased refractorReplacement of a cracked Tyre / shell at station 1 on a 1300 Ton/day Kiln [euro 0.7M] Achievement:- Improved reliability and renewed tyre life RK1 Cooler replacement / Kiln Hood / Burner pipe, site manager [euro 5.4M] Achievement:- Improved reliability +6% (92 - 98%) and performance +20 ton/hr (70 - 90 Ton/hr)
- 10 Jahre und 7 Monate, März 1996 - Sep. 2006
Burning Section Planner-Methods Department
Lafarge, Mombasa Plant. KENYA
Involved in set up of the Methods department Responsible for the planning/scheduling of weekly maintenance activities and shutdown planning (resource/contracting, tools/ equipments, spare parts sourcing/quality approvals, cost control MCI and participate in the PIP) Working closely with section foremen, first level/specific inspectors, production, process departments and TCEA Advanced Downtime Analysis Programme – ADAP champion
- 2 Jahre und 7 Monate, Aug. 1993 - Feb. 1996
Section Engineer Kilns 1 & 2 Electrical
Bamburi Portland Cement, Mombasa. KENYA
Responsible to the senior maintenance engineer for implementing planned and condition monitoring maintenance of electrical equipments in the burning section including the electrical rooms. Isolators,CB,SF6 switchgears and transformers [11KV,3.3KV,415V,220V,48V,24V].Diesel generators 500KVA
- 2 Jahre und 11 Monate, Sep. 1990 - Juli 1993
Assistant Electrical Engineer
Bamburi Portland Cement Co. Ltd
Assigned to work in various operational areas reporting to the plant electrical engineer (crusher 4, Crusher 5, Pre blending hall, Tertiary Material hall, Raw mill 4, Raw mill 5, Raw meal Blending silos, Rotary Kiln 1, Rotary Kiln 2, Shaft Kilns, Crane Hall, Cement mill 1 - 4,Packing plant 1 – 3, outer stations Mbaraki and English point
- 1 Jahr und 7 Monate, Feb. 1989 - Aug. 1990
Graduate Trainee
Bamburi Cement Ltd Group Cementia and Blue Circle
Undertook a graduate training programme of 18 month duration and submission of suitable experience in lieu of training, in accordance with IEE (UK) regulations[Bye law 12C]
Ausbildung von Rassam Timimi
- 2 Jahre und 10 Monate, Sep. 1985 - Juni 1988
Electrical Engineering
University of Nairobi
Microwave and Telecommunications
Sprachen
Englisch
Fließend
Arabisch
Gut
Kiswahili Native
-
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.