
Renato Munoz Valdivieso
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Renato Munoz Valdivieso
- Bis heute 7 Monate, seit Aug. 2025
Ingeniero
Abu Dhabi oil company (ADOC)
- 1 Jahr und 6 Monate, Juli 2023 - Dez. 2024
Drilling Engineer
Dubai Petroleum
•Drilling engineering for exploration project in onshore Dubai. •Preparation of the basis of well design (BoD) to drill Shamal and Barkhan exploration wells and TPS-1 appraisal well across high-pressure and high-temperature reservoir conditions. •Prepared BoD and the detailed drilling program for the exploration wells and the horizontal appraisal well. •Design considered a high-pressure gradient of 0.90 psi/ft (drilling fluid density required of 17.7 lb/gal) and non-API casing due to ‘tubing leak’ caseload.
- 1 Jahr und 4 Monate, Apr. 2022 - Juli 2023
Drilling Engineer
Inpex
• Drilling engineering for the Block-4 exploration project in Abu Dhabi. • Drove project success by managing costs and resources, coordinating operations, streamlining team communications, and identifying, managing, and preventing risks. • Steered engineering and preparation of the detailed drilling program. • Prepare the basis of well design for J-shaped and S-shaped exploration wells. • Well testing DST operations carried out in all wells. Bottom hole sampling, PLT, matrix stimulation with coiled tubing.
- 2 Jahre und 1 Monat, Nov. 2019 - Nov. 2021
Senior Well Engineer
Anton Oil
• Prepare detailed well engineering as per well proposals. Wells drilled from clusters (pads). Anti-collision and drillstring torque and drag limitations are assessed on a daily basis. • Kick-off the project of integrated drilling services: rig commissioning, rig move coordination, procurement of goods and services. • Apply sound practices to drill deviated wells through depleted reservoirs and highly unstable zones using water base mud. Strict adherence to well control and well integrity compliance.
- 5 Jahre und 4 Monate, Sep. 2012 - Dez. 2017
Drilling engineer
ADCO
- Long-lateral wells: TVD=9,300 ft, horizontal length=10,000 ft, average H2S concentration=100,000 ppm, downhole temperature > 315°F. - Drilling down through multiple reservoirs (pressurized and depleted) and across unstable shale layers. - Several casing designs to cater well integrity, borehole stability and subsurface data acquisition (coring, sampling and logging appraisal wells). - Well planning, operational follow up, cost control, diagnosis and problem solving on a daily basis.
- 5 Jahre und 9 Monate, Dez. 2006 - Aug. 2012
Drilling and Completions Engineer
Repsol
Engineering and operations support for drilling and completing horizontal wells and slant wells. Cluster drilling high complexity wells that involved 3D trajectories and sidetrack operations in open and cased holes. • Well design and monitoring through Landmark suite: OpenWells, Compass, CasingSeat, StressCheck and Wellplan. • Well planning, operational follow up, cost control, diagnosis and problem solving. • Drilling slant and horizontal wells from pads in a cluster type drilling operation.
Ausbildung von Renato Munoz Valdivieso
- 5 Jahre und 10 Monate, Okt. 1994 - Juli 2000
Ingeniería en Petróleos
Escuela Politécnica Nacional
Sprachen
Spanisch
Muttersprache
Englisch
Fließend
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.
