
Şaban Semih Akküç
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Şaban Semih Akküç
- Bis heute 8 Jahre und 8 Monate, seit Nov. 2016
CR3 Marmaray Gebze-Halkalı Cummeter Railway Construction - Construction Chief
Kolin
Responsibilities • On 12 km cummeter railway, completing 7 stations, 1 operation building, 2 viaducts, 2 maintenance yards and several pedestrian/highway over/under pass • Completing steel works of station canopies and maintanance yards. • Superposing architectural, mechanical and electrical projects in stations. • Preparing subcontractors work plan, checking them according to master plan and provide alternative scenarios in case of falling behind master plan.
- 3 Jahre und 3 Monate, Sep. 2013 - Nov. 2016
Istanbul Eurasia Tunnel - Senior Site Civil Engineer
Yapı Merkezi
• Completing Cut and Cover RC Tunel, shoring structures and architectural steel beams at entrance/exit of tunnels. • Completing of RC works of Operation Building, jet grout application under Ventilation and Transformer buildings for soil improvement • Extension of one line for both ways at D-100 highway from exit of tunnels to Göztepe Junction with soil nail and shotcrete application. • Completing piles, wale beams, steel struts and prestressing anchorages for Cut&Cover excavation bracing system.
- 1 Jahr und 7 Monate, Jan. 2012 - Juli 2013
Muscat International Airport Project - Senior Site Civil Engineer
Enka İnşaat
Responsibilities • Completing reinforcement concrete works and installation of steel roof of Car Park Buildings according to approved ITP, MS and projects. • Completing of excavation, soil improvement and infrastructure works of Car Park Buildings according to approved ITP, MS and projects. • Making inspections with consultant Hill International and Cowi for superstructure and infrastructure work according to ITP and MS.
- 11 Monate, Nov. 2010 - Sep. 2011
Sochi Olympic Stadium - Site Civil Engineer
Engeokom
Responsibilities • Completing reinforcement concrete works according to approved projects. • Five months period of the project, managing night shift as construction manager and coordination of concrete transfer from several batching plants. • Preparation of weekly / monthly progress reports for Moscow Head Office
- 1 Jahr und 4 Monate, Juli 2009 - Okt. 2010
General Electric Company of Libya Zuara Desalination Plant - Site Civil Engineer
Enka İnşaat
Responsibilities • Completing reinforcement structures (main electrical building, pipe rack foundations,) according to approved projects and method of statements • Infrastructure piping, production of precast drainage pits and installation, production of reinforcement concrete open drainage channels • Completing steel works of pipe racks. • RC foundations for oil tanks and making asphalt inside • Aplication of block works, plaster, paint, screed and raised floor for Main Electrical Building
Ausbildung von Şaban Semih Akküç
- 4 Jahre und 9 Monate, Sep. 2004 - Mai 2009
Civil Engineering
Istanbul Technical University
Sprachen
Englisch
Gut
Türkisch
Muttersprache
Russisch
Grundlagen
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.