
Ing. Shaikh Muhammad Sadiq
Skills
Timeline
Professional experience for Shaikh Muhammad Sadiq
- Current 2 years and 4 months, since Jun 2024
Material Control Engineer
CHINA STATE CONSTRUCTION AND ENGINEERING CORPORATION (CSCEC)
Plan, monitor, and control material flow to optimize inventory levels and prevent shortages. Develop and implement tracking systems to enhance order accuracy and reduce lead times for engineering projects. Utilize ERP systems for efficient material planning, improving stock visibility and minimizing misplacements. Coordinate logistics and supply chain operations, ensuring timely delivery of mechanical and electrical materials.
- 10 years and 9 months, Oct 2013 - Jun 2024
PRODUCT INDUSTRIALIZATION ENGINEER
GHANDHARA TYRE AND RUBBER COMPANY LIMITED
To develop project timeline as per the new project proposal received from the OEMs like Suzuki, Toyota, Honda, Changan. To perform design calculations of the product and its components as product standards ETRTO, JATMA and TRA. To develop specifications of new product and its related components like tyre, tube and bladder. To prepare costing specifications to estimate the initial cost of the product and budget allocation. To arrange all necessary equipment and tooling required.
Languages
English
C1 (Fluent)
Chinese
B1-B2 (Good)
urdu
C2 (Expert / native speaker)
German
A1-A2 (Basic)
Spanish
A1-A2 (Basic)
French
A1-A2 (Basic)
XING members with similar profiles
XING – The jobs network
Over 1 million jobs
Find just the right job for you on XING.
Job offers just for you
Get found by employers and over 20,000 recruiters.
21 million members
Connect with new people and gather inspiration to boost your working life.
Free membership
Basic membership is free, but the opportunities are priceless.
