
Soroush Zare
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Soroush Zare
- Current 1 year and 11 months, since Jul 2024
Freelance Technical Inspector
Self-Employed
Inspect cables, UPS units, transformers, battery chargers, inverters, PLC panels, and control cabinets. Verify compliance with project documentation and international standards (CE, IEC, ISO) Witness and verify Factory Acceptance Tests (FAT), including material identification, detailed visual and functional checks of components, wiring, insulation, and protection systems. Strictly adhere to the project’s Inspection and Test Plan (ITP) and related documentation, such as cabinet layouts, dimensional drawings.
- 5 months, Jan 2025 - May 2025
Weiterbildung
alfatraining Bildungszentrum GmbH
SPS(PLC) Specialist: Working with TIA Portal and EPLAN (PLC) Focus Areas: SPS: Working with Simatic S7 in the TIA Portal SPS: Visualization, process data processing with WinCC, and networking in the TIA Portal Electrical Planning: Using EPLAN
- 1 year and 1 month, Jul 2023 - Jul 2024
Technical Assistant
K5 Factory GmbH
Benchmarking between different pipeline tools, setup of a Shotgrid server. Development of a Shotgrid server, setup of a Prism pipeline. Utilization of Confluence and Jira for efficient project management and communication to meet schedules and milestones. Development of Python scripts to automate recurring tasks, increase productivity, and reduce manual efforts.
- 5 years and 7 months, Oct 2016 - Apr 2022
Project Manager
Soroush Amvaj Saba Ertebat Shiraz Co
Led team for installation of 50 telecom towers and 400 site handovers Oversaw quality assurance for site installations, cabling, and antenna alignment Implemented testing protocols for telecom networks in compliance with 3GPP, ISO 9001, and IEC 60204 Coordinated with vendors and subcontractors for on-site inspections Developed client documentation for QA acceptance
- 2 years, Nov 2014 - Oct 2016
Senior Coordinator
Sahand Parsian Gharb CO
Supervised and coordinated end-to-end telecom rollout, including site selection, civil works, electrical installations, and commissioning Coordinated resolution of technical issues and deviation reports, engaging with stakeholders Held regular client meetings and interfaced with QA departments for project alignment Experienced in installation, integration, and testing of LTE/4G base stations Planned, set up, and maintained telecommunications networks across multiple sites
- 2 years, Nov 2012 - Oct 2014
QA Engineer
Sahand Parsian Gharb Co
Performed field QA inspections across multiple telecom sites Verified compliance with ISO 9001, ISO 27001, ETSI, 3GPP, and IEC standards Monitored installation quality, grounding, electrical safety, environmental conditions Documented inspection results and coordinated NCR closures Trained site teams in inspection protocols and safety requirements
- 2 years and 6 months, May 2010 - Oct 2012
Mobile Telecommunications Technician
Sahand Parsian Gharb CO
Planning, installation, and configuration of microwave communication systems (MW). Performing link tests, power measurements, and troubleshooting of microwave connections. Documentation of network topologies and configuration parameters. Configuration and maintenance of microwave links (SDH, PDH). Alignment of directional antennas for optimal signal strength and stability.
- 2 years and 11 months, Mar 2007 - Jan 2010
Mobile Telecommunications Technician
Pars fan Gostar Modern Telecommunication
Installation of telecommunications equipment on towers (antenna, feeder, microwave, SDH, PDH). Installation of solar systems. Equipment installation on transmission towers (parabolic antennas). Installation of communication systems for Ericsson, Huawei, ZTE, Nokia, and Siemens. Tower installation: lattice tower, ICB, monopole, mast, guyed mast, NBH. Equipment installation: BSC, RNC, ADM, BITS, MGW, GCSN, SCSN, routers, switches, HLR, ATAE, IPBB, fiber optic and coaxial cables.
Ausbildung von Soroush Zare
- 5 months, Jan 2025 - May 2025
SPS Specialist: Working with TIA Portal and EPLAN (PLC)
alfatraining Bildungszentrum GmbH ,München
SPS Specialist: Working with TIA Portal and EPLAN (PLC) Focus Areas: SPS: Working with Simatic S7 in the TIA Portal SPS: Visualization, process data processing with WinCC, and networking in the TIA Portal Electrical Planning: Using EPLAN
- 5 months, Jul 2024 - Nov 2024
Advanced training in a German language course
Initiativ Gruppe Deutschsprachkurs
Further education in a German language course at the B2 level
- Current 2 years and 9 months, since Sep 2023
Control Engineering Technology
Shiraz University
- 6 months, Mar 2019 - Aug 2019
Programmable logic controller (PLC)
Apprenticeship at the Technical and Vocational Training Organization, Shiraz
- 11 months, Sep 2018 - Jul 2019
Industrielle Elektrotechnik
Apprenticeship at the Technical and Vocational Training Organization, Shiraz
- 1 year and 2 months, Jan 2006 - Feb 2007
Electricity
Apprenticeship at the Technical and Vocational Training Organization, Shiraz
Electrical Installations and Maintenance.
Sprachen
English
C1 (Fließend)
German
B1-B2 (Gute Kenntnisse)
Farsi
C2 (Verhandlungssicher / Muttersprachlich)
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.
