
Steffen Gnauck
Werdegang
Berufserfahrung von Steffen Gnauck
- 6 Jahre und 5 Monate, Juni 2016 - Okt. 2022
Project Engineer
Kretz+Klumpp Ingenieurgesellschaft mbH
Supervision of the construction activities of the new railway Wendlingen - Ulm of the Stuttgart 21 project
- 2 Jahre und 1 Monat, Apr. 2014 - Apr. 2016
Warehouse/Logistics Manager
Ferrostaal Industrie Anlagen GmbH / Bolashak Atyrau
• Equipment supply identification and valuation for classification decision approval as basement for easier customs handling for the import of the offshore project items unit wise • Development of different warehouse scenarios for cargo handling and storage on site and Uralsk • Re-tendering of the offshore items forwarding to site included containerized option for better storage on site from different suppliers destination based with provable savings of over 2 MUSD
- 2 Jahre und 1 Monat, Apr. 2014 - Apr. 2016
Warehouse/Logistics Manager
Ferrostaal Industrie Anlagen GmbH / Bolashak Atyrau
- 1 Jahr und 5 Monate, Sep. 2012 - Jan. 2014
Project Logistics Consultant
Hans Mayr Spedition Stuttgart
Support of the import procedures of the module based hotel project of ADK Modulraum GmbH in Voronesh Russ. Federation - part time
- 3 Monate, Juni 2012 - Aug. 2012
Consultant project logistics
Tulacement LLP Novogurovo Russia
Consultation reg. logistics related claims
- 3 Jahre und 3 Monate, Okt. 2008 - Dez. 2011
Logistics Manager
VANBETRA / HeidelbergCement Rus / Tulacement LLP
Import handling of the equipment of a new greenfield cement plant in Tula region Russian Federation
- 1 Jahr und 4 Monate, Apr. 2007 - Juli 2008
Procurement & Logistics Manager/Coach
KCA DEUTAG Drilling Ltd. Tyumen Russian Federation
• Implementation and training of modern procurement and logistics methods SAP based for the locals • Costs savings via stock analyses and reduction as well as the usage of stocks for consignments at the rigs operating sites in West Siberia • Research of the fastest delivery options in preventing stand-by of the rigs • Supply chain improvements especially regarding critical spare parts and long lead items
- 3 Jahre, Jan. 2002 - Dez. 2004
Head of the main dept. Logistics
Erdoel GmbH Berlin / JV KAZGERMUNAI Kyzylorda (RoK)
Headed the procurement of all material, equipment, spare parts and services for field development and COPS extension, especially de-bottlenecking and water injection project Responsible for customs clearance and import substitution possibilities in accordance with Kazakh law CAPEX/OPEX control, Procurement Contracts and office building/kitchen and car fleet maintenance management
- 3 Jahre und 10 Monate, März 1998 - Dez. 2001
System Engineer
Philips Medical Systems
Final electrical and mechanical check of X-ray systems
- 7 Jahre und 1 Monat, Aug. 1988 - Aug. 1995
Resp. for Finance&Controlling on site
UGB Mittenwalde / GABEG mbH Berlin
Secure IT-functions and Finance&Controlling tasks on site in Aksai and Rasskasovo (USSR)
- 9 Jahre und 5 Monate, März 1979 - Juli 1988
Technologist for electrical testing/measurement procedures (REFA)
Fernmeldewerk Bautzen
Evaluation of the time consumption of electrical checks & fault finding of informations techniques equipment
Ausbildung von Steffen Gnauck
- 1 Jahr, Sep. 1996 - Aug. 1997
Project engineer for electrical engineering
elop Dresden
Electrical Engineering
- 5 Jahre und 9 Monate, Sep. 1979 - Mai 1985
Informations Technology (Informationstechnik)
TU Dresden
Microprocessor control of ISDN parts
Sprachen
Englisch
Fließend
Russisch
Fließend
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.