Navigation überspringen

Tarun Verma PMP

Angestellt, Tunnel Project Engineer, Webuild (Future Generation JV)
New South Wales, Australien

Fähigkeiten und Kenntnisse

Tunneling
Project management
Construction management
Drainage works
New Austrian Tunneling Method
EPB TBM
Primavera P6
MS Office
AutoCAD
Construction
Engineering
Bauingenieurwesen
Ingenieurbau
Slurry TBM
Construction site
Underground engineering
English Language
Construction company
Excavations
Site management

Werdegang

Berufserfahrung von Tarun Verma PMP

  • Bis heute 2 Jahre und 10 Monate, seit Sep. 2022

    Tunnel Project Engineer

    Webuild (Future Generation JV)

    The project is based within the Snowy Mountains in NSW, Australia. Construction includes Intake & Outlet structures at Tantangara and Talbingo reservoirs with 27 KM of concrete lined tunnels (11m Ø) to link two reservoir and a Power station •Working with a Mixed Shield Multimode TBM through heterogeneous ground. •Provide effective supervision and direction of the construction site and tunnelling site teams. •Produce daily / weekly / monthly reports as required.

  • 8 Jahre und 5 Monate, Mai 2014 - Sep. 2022

    Resident Tunnelling Engineer

    CDM Smith

    Projects (Worth USD 400 MN) A.) FIFA Readiness Project (FRP-4), Surface & Ground Water Network (C851/4) (USD 100 MN). B.) Central Doha & Corniche Beautification package 2A & 4. Al Corniche Street C.) Roads & Infrastructure in Doha Industrial Area (Package-07), Street 33 Upgrade D.) Construction of Sewerage Flow Diversion in Al Tarfa, Legtaifiya & Jelaiah. E.) Flood Prevention Schemes (FPS-05, FPS-14) F.) Abu Hamour Surface & Storm Water Drainage Tunnel (Phase-1) (EPB TBM – 4.5m Ø)

  • 3 Jahre und 7 Monate, Nov. 2010 - Mai 2014

    Project Engineer - Tunnel

    Leighton Asia

    Led a team of site engineers and supervisory staff in the adherence to project targets, goals, and objectives. Collaborated with various teams including MEP, planning, and design to the prompt and accurate completion of projects and phases. Detected any critical issues related to site activities and certified a quick resolution of queries. Organized all shift reporting and round/cycle time analysis for all tunnel activities. Facilitated the implementation of Required Excavation Support System (RESS).

  • 1 Jahr, Aug. 2009 - Juli 2010

    Construction Engineer

    Omaxe Ltd.

    Regulated construction sites, certifying strict adherence to project targets and objectives. Held the responsibility for the formulation of purchase order documents and interactions with vendors. Conceptualized and instituted bar bending schedules as well as a Bill of Materials to maintain accurate daily records.

Ausbildung von Tarun Verma PMP

  • 4 Jahre und 2 Monate, Aug. 2005 - Sep. 2009

    Civil Engineering

    University of Delhi

    Civil Engineering

Sprachen

  • Englisch

    Fließend

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z