Teddy Lesmana

Angestellt, Sr. Analog IC Design Engineer, NXP Semiconductors Netherlands

Taiwan, Taiwan

Fähigkeiten und Kenntnisse

Analog/Digital IC Design Engineer
Technik
Technology
Technisches Verständnis
Microelectronics

Werdegang

Berufserfahrung von Teddy Lesmana

  • Bis heute 9 Jahre und 3 Monate, seit Juli 2015

    Sr. Analog IC Design Engineer

    NXP Semiconductors Netherlands

    • Development of Security cells including circuit design, characterization, simulation, prototyping, software/hardware development, and testing of latch sensor and high speed secure flip flops. • Responsible for the translation of physical security concepts into layout designs and all the parasitic extractions and analog simulations, including pre- and post-layout verification (DRC, LVS, & PEX).

  • Bis heute 11 Jahre und 6 Monate, seit Apr. 2013

    Internship Students

    IMEC, Belgium

    • Design of a low power ECG active dry electrode for wireless bio-potential sensor. • Proposed a novel uni-polar three electrodes measurement for wireless bio-potential sensor for a widely ECG active electrode implementation.

  • 1 Jahr und 1 Monat, Sep. 2010 - Sep. 2011

    Product Engineer

    Infineon Technologies

    Main Jobs: - Transfer new product from development to final testing. - Improve test yield and quality. - Release new test program and hardware to production. - Identify and implement productivity improvement and cost reduction projects. - Provide technical support to production at final testing. - Lots on Hold Disposition. - Burn-In and Test Improvement Projects. Supporting Jobs: - Tester Balancing Projects. - Test Program Conversion. - Parallel Test Implementation. - Test Time Optimization.

  • 1 Jahr und 1 Monat, Sep. 2009 - Sep. 2010

    Technical Support Engineer (Technical Antenna)

    Schneider Electric

    Main Jobs: - Connecting between plant and R & D department - Knowing all Schneider C & S products - Communicate design and structure of the products from R & D to Plant - Communicate complaint of the products which is related to design and structure from plant or costumer to R & D - Setting up process, PLC and VB based programs on final tester to accommodate the designer request and design change due to new product transfer. - Expediting the plant request for any design modifications to R&D.

  • 2 Monate, Juni 2008 - Juli 2008

    Internship Students

    FESTO

    -Learning working principle of pneumatic tubing system. -Learning working principle of various types of valves including ball valve, gate valve, and choke valve. -Installing complete pneumatic system including valve system, fitting, PLC controller and cylinder system. -Learning principle of general pneumatic control system. -Learning principle of pneumatic knocker control system. -Learning working principle of PLC (Programmable Logic Controller) control system -Learning Mechanical set up of Pneumatic

Ausbildung von Teddy Lesmana

  • 7 Monate, Mai 2013 - Nov. 2013

    Electrical Engineering

    KU Leuven

    Microelectronics, Electronic Engineering, Electrical Engineering

  • Bis heute

    Microelectronic Engineering and Applications

    Chung Yuan Christian University

Sprachen

  • Englisch

    Fließend

  • Chinesisch

    Gut

  • Indonesian Language

    -

  • Malay

    -

Interessen

Involving on any Charity and Volunteery events
Reading and Writing
Painting
Listening to Music
Travelling
Photography
Playing Basket Ball

21 Mio. XING Mitglieder, von A bis Z