
Yesh Pal Singh
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Yesh Pal Singh
- 7 Jahre und 4 Monate, Feb. 2015 - Mai 2022
Mechancal Piping Engineer
STENSBO ApS Denmark
Piping Design, Piping Engineer, Piping Designer, Layout Designer, SmartPlant 3D, OptiPlant, PDS, CadPIPE, AutoPlant, Autocad, Microstation, Piping Material Engineer, ANSI, ASME, Euro Codes, Pipe Stress Engineering, Caesar II, ROHR2, AutoPipe, TRIFLEX, Mechanical, Project Management, Ohmtech, PVElite, Mathcad, FEA Autodesk Inventor, Pipe Stress Analysis, EN 13480, ASME B31.3, AutoCAD Plant 3D, Inventor, Solidworks, Pressure vessel design, EN13445, ASME Section-8.
- 1 Jahr und 8 Monate, Juni 2013 - Jan. 2015
Piping Engineer
ATKINS Global, DENMARK
Defining Scope of work, preparing Engineering work package. Site/field survey onshore and offshore in North Sea Danish Sector for client MAERSK Oil and Gas, and DONG Energy. Checking 3D models in a multi-discipline CAD environment. Used AutoPLANT and Naviswork. Developing and checking 3D models in a multi-discipline CAD environment. Dealing with Point Cloud 3D scanned image and Navisworks. Triflex Caesar II
- 4 Jahre und 7 Monate, Juli 2010 - Jan. 2015
Director Engineering Services
Danish Engineering And Technical Services Company
https://www.linkedin.com/company/danish-engineering-and-technical-services-company/
- 2 Jahre und 8 Monate, Okt. 2010 - Mai 2013
Project/Plant Design Engineer
ANDRITZ Feed and Bio fuel, DENMARK
Defining Scope of work, preparing Engineering work package. Preparing RFQ, Request for quotation communication with suppliers/vendors. For Silo, Bins, Elevators. Preparing technical specification and data sheets for ANDRITZ machines Pellet Mill, Hammer Mill, Conditioner, Screws, conveyors. For machine fabrication based on the project requirements. Technical calculation and cost estimate.
- 2 Jahre und 2 Monate, Sep. 2008 - Okt. 2010
Piping Engineer
ATKINS Global, DENMARK
Piping Layout design, Fabrication Iso, BOQ. Working on TRIFLEX, Piping Stress Analysis Tool. Activities/Task working on: Pipe thickness calculation. Critical Line list preparation & System Definition.
- 5 Monate, Mai 2008 - Sep. 2008
Piping Plant Design Engineer
PENTAIR, Netherland
Brewery Industry: Co2 Recovery Plants. Manufacturing of Pressure vessels, Foam Separator, Gas Washer, CO2 Compressors
- 6 Monate, Dez. 2007 - Mai 2008
Engineering Manager
ASD Global, San Francisco, California, USA
Leading group of engineers, to prepare 3D model for cost estimation/quantity for Preliminary and Front End Engineering(FEED) and for Detail engineering, on OptiPlant Software, Exploring more business and clients worldwide, coordinating day to day engineering activities among ASD and clients, Providing technical support to ASD's engineering team.
- 6 Monate, Juli 2007 - Dez. 2007
Senior Piping Desiger
Jacobs Engineering Group, Inc. LongBeach, Los Angeles, California, USA
JACOBS Engineers INC. BP Project:02U20670 British Petroleum Carson Refinery, 2350 E. 223rd St., Carson, Los Angeles CA 90810 Worked for Carson Refinery, Sulphar Plant Modification Project
- 6 Monate, Feb. 2007 - Juli 2007
Senior Piping Designer
ANVIL Corporation, Bellingham, Washington, USA
ANVIL Corporation BP Project:BE9159 British Petroleum Cherry Point Refinery, Whatcom County Blaine, Bellingham, Washington State Worked for East Refinery Utility Infrastructure Project
- 8 Monate, Juni 2006 - Jan. 2007
Piping Engineer
ENI, (Former USSR Region Russia)
Front end engineering design study and conceptualizing project, Material take off Material purchase order, project detail design, follow up/Coordinating Engineering construction work in Burun, Balkan oil field in Former USSR region, Providing technical support in construction phase, Reviewing drawings plans to ensure engineering designs are in compliance with appropriate industry codes and standards. Preparing and evaluating tenders for engineering and construction services.
- 9 Jahre und 1 Monat, Mai 1997 - Mai 2006
Piping Designer
UNION Carbide Corporation, Houston, Texas, USA
1997-Trained in Team Concept:- Team Management, Team Player, 1998-RCA (root cause analysis) 2000-Working with Management tools such as MOC (management of change) 2001-Empowerment and Lean organization, Six Sigma, 2001-BBP (behavior based policy) 2001-AICR (action, incident, condition report). Projects Worked with- FLUOR DANIEL- Utility Plant BROWN & ROOT- Ethylene Plant TOYO- Poly Propylene Plant FOASTER WHEELER ITALIANA- Ethylene Glycol Plant SNAMPROGETTI- Poly Ethylene Plant
- 3 Jahre und 8 Monate, Juli 1993 - Feb. 1997
Mechanical HVAC Designer
BMB Engineering Group, KUWAIT
HVAC Design
- 1 Jahr und 10 Monate, Sep. 1990 - Juni 1992
Trainee Engineer
HYUNDAI Engineering and Construction Co. KOREA
Have been Working/Learning, designing HVAC System, Heat Load Calculation Air Distribution, Duct Sizing Bill of Quantity,
Ausbildung von Yesh Pal Singh
- 4 Jahre, Juli 1986 - Juni 1990
Mechanical Engineering
Jamia Millia Islamia
Mechanical Engineering Design
Sprachen
Englisch
Fließend
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.