Navigation überspringen

Zeeshan Akhtar

Angestellt, R&D Electrical Engineer, University of Puerto Rico Mayagüez Campus Puerto Rico
Mayagüez, Puerto Rico

Fähigkeiten und Kenntnisse

Elektrotechnik
Elektronik
Elektrik
Elektroinstallationen
Hardwareentwicklung
EPLAN
Schaltplanerstellung
TIA Portal
WinCC
Project Management
Team work
Communication skills
Power system control
Power electronics
Renewable Energy
Industrial electric machinery
Power system distribution
Maintenance and Troubleshooting
High Voltage Systems
Motor Control
Protective Relaying
Technical Documentation
Power System Analysis
Calibration and Testing
Safety Practices

Werdegang

Berufserfahrung von Zeeshan Akhtar

  • Bis heute 2 Jahre und 11 Monate, seit Aug. 2022

    R&D Electrical Engineer

    University of Puerto Rico Mayagüez Campus Puerto Rico

  • 4 Monate, Mai 2023 - Aug. 2023

    Graduate Intern

    National Renewable Energy Laboratory (NREL)

    As a Graduate Intern in Electrical Engineering at ESIF, NREL, I worked on the Unifi consortium project, focusing on grid-forming inverters for power systems. My responsibilities included designing, modeling, and simulating grid-forming inverters, conducting research on their impact on system stability and reliability, and developing and testing control strategies. I performed lab experiments, analyzed data, prepared technical reports, and supported the development of new methodologies.

  • 1 Jahr, Sep. 2020 - Aug. 2021

    Visiting Researcher

    TalTech – Tallinn University of Technology

    Worked on the designing and molding of a three-phase four-leg inverter for unbalanced load using particle swarm optimization. The purpose of the study was to design a new prototype that can regulate the output voltage of the inverter with a highly unbalanced load, this was a simulation-based project on MATLAB/SIMULINK and was published.

  • 4 Jahre und 1 Monat, Sep. 2016 - Sep. 2020

    Assistant Manager ( E & I )

    Cherat Cement Company Ltd ( Ghulam Faruque Group)

    My main responsibilities were to plan preventive maintenance and keep the plant in normal running condition, as a shift engineer troubleshot problems and complaints from the process department about instrumentation and electrical side. Along with that to maintain electrical and instrument inventory up to date and prepared the annual budget. Working collaboratively with design engineers, operation engineers, purchasers, and other internal staff,

  • 2 Jahre und 9 Monate, Jan. 2014 - Sep. 2016

    Senior Engineer Electrical & Instrumentation

    Dewan Mushtaq Group

    Initiate & execute plans for the reactive and routine preventive maintenance activities to ensure the Uninterrupted Plant and Machinery operations. Perform system calculations and studies for electrical power systems – load flow, voltage drop, motor starting, short circuit studies, and relay coordination studies. Handle the tasks of modifying, repair/replace Electrical and Electronic systems and updating drawings Including; Electrical Single Line Diagram, Switch-gears, HT/LT Panel.

  • 6 Monate, Juli 2013 - Dez. 2013

    Electrical Engineer

    SIND FEEDS & ALLIED PRODUCTS

    Coordinate with our General Manager and Production Manager to make well planned schedule to meet the dead lines and Send the monthly report to our Admin Manager. Leading overall Maintenance, Shift Performance and activities related to Manufacturing Plant with a technical pool of 06 personnel. Leading our teams and giving them proper technical support regarding LV electrical drives, power factor maintaining, winding & Utility. Designing and installation of the electrical panel. Pneumatic equipment installati

  • 8 Monate, Nov. 2012 - Juni 2013

    Site Engineer in Telenor Vega Project (MW & SDR swap).

    ZTE Pakistan

    Look after all the installation, configuration, commissioning of SDR Expansion & Transmission expansion. Give proper Technical support to our teams regarding SDR installation, testing, commissioning and complete transmission. Documentation and reporting of PATs, Coordinate with our internal Project Manager and External Project Manager, Coordination with Authorized people for preparing the Planning. Send the daily report to our Project Team. Carrying out Technical trainings regarding ZTE SDR equipment.

  • 4 Monate, Aug. 2011 - Nov. 2011

    Internee as Electrical Engineer

    NTDC Pakistan

    Acquired knowledge of the hierarchical structure of the power system. Attended special on-training lectures to interpret P&ID’s, electrical schematics and technical drawings Maintenance and trouble-shooting of power transformers, CTs, PTs, Station Batteries, Battery chargers, etc as per detail given below. a) Power transformer testing including open circuit test and short circuit test. b) Opening and closing time of circuit breakers. c) Complete maintenance and installation of circuit breakers.

Sprachen

  • Englisch

    Fließend

  • Urdu

    Fließend

  • Pashto

    Muttersprache

  • Arabisch

    Grundlagen

  • Chinesisch

    Grundlagen

  • Spanisch

    Grundlagen

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z