
Dipl.-Ing. çağdaş eren utaş
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von çağdaş eren utaş
- Bis heute 4 Jahre und 4 Monate, seit Juli 2021founderAtlas Heavy Industry 
- 8 Monate, Aug. 2020 - März 2021Project Lifting Competent Personenka 
- 9 Monate, Okt. 2019 - Juni 2020Project Lifting Coordinatorenka 
- 8 Monate, Jan. 2019 - Aug. 2019Mechanical Lifting EngineerPetrofac 
- 1 Jahr und 8 Monate, Jan. 2017 - Aug. 2018Construction EngineerWOOD PLC :Develop Safe overall planning schedule, to create work breakdown structure and Controlling and monitoring contractor works, Reviewing JSA, WRAC and method statement for work safe execution, communicate between engineering and management department, Control revisions and to implement. Coordinating heavy lifting activities and preparing lifting study, to make kick-off meeting with contractors and to identified and solved overlapping problem, Mechanical completion. 
- 1 Jahr und 4 Monate, Sep. 2015 - Dez. 2016Mechanical EngineerTSGI Develop overall planning schedule, report and draw up the work plans in accordance with the contractors’ supervision, planning and construction engineers, and verify the suitability of designs. Execute all quality control checks and tests in accordance with contractors’ ITP and method statements. Supervise team for timely and accurate work execution, assess subcontractors, and complete work activities to meet the work quality standards and project specifications. , material deliveries and tools. 
- 1 Jahr und 5 Monate, Apr. 2014 - Aug. 2015Mechanical Engineeryamata Coordinated all assembly processes, executed heater members’ quality inspection, and followed acceptance criteria and documentation for all equipment. Delivered support to site operations, whilst ensuring safety and quality procedures, as well as efficient use of resources, equipment and labor. Examined heavy lifting activities and mechanical works; established project execution strategy, design and reviews; recorded project progress, and create method statement. 
- Spearheaded planning management and execution of lift and transport operations; directed construction, operations or maintenance activities at project site. Offered technical advice to the industrial or managerial personnel regarding design, program modifications and structural repairs. Administered the subcontractor team, equipped lifting study.installation and steel structural activities for all the team members; successfully conducted onsite construction and safety inspections of existing structures. 
- 1 Jahr und 3 Monate, Jan. 2011 - März 2012Manufacturing EngineerGIMAS Improved manufacturing efficiency by analyzing and planning work flow. Assured product and process quality by designing testing methods,labor and material costs,Completed various projects, generated reports, and led activities, including manufacturing of machinery construction, pressure vessels, civil works, heat exchangers, cyclones, dueling, mechanical utilities, steel constructions, dust collection filter systems and equipment. 
- Site lifting competent person- enka 
Ausbildung von çağdaş eren utaş
- 4 Jahre und 6 Monate, Sep. 2007 - Feb. 2012Mechanical EngineeringFIRAT UNIVERSITY 
Sprachen
- Englisch- Fließend 
- Russisch- Grundlagen 
- Deutsch- Grundlagen 
- Türkisch- Muttersprache 
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
- Über eine Million Jobs - Entdecke mit XING genau den Job, der wirklich zu Dir passt. 
- Persönliche Job-Angebote - Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen. 
- 21 Mio. Mitglieder - Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben. 
- Kostenlos profitieren - Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren. 
