Ali Moaveni

Abschluss: Dipl.Ing, Montan University
Leoben, Austria

Fähigkeiten und Kenntnisse

Computer
supervising
engineering
mineral processing
labratories

Werdegang

Berufserfahrung von Ali Moaveni

  • Current 12 years, since Jun 2014

    Research Assistant

    Montanuniversität Leoben
  • 10 months, Jan 2013 - Oct 2013

    Shift Production Supervisor

    Tabas Parvade Coal Cleaning Plant

    Tabas Coal Mine, one of the biggest coal deposits in the Middle East, is located in South Khorasan province; Iran. My main responsibilities were, all possible checking, controlling and creating probable changes in plant circuit keeping in mind the production goals of both quantity and quality. Controlling, problem solving and adjusting the process in order to achieve the best quality and quantity production level while minimizing coal loss in tailing line was as the major target while carrying out my duty.

  • 1 year and 2 months, Nov 2011 - Dec 2012

    Technical Engineer and Project Manager

    Fadjr Mazinoo Coal Mine

    Fadjr Mazinoo Coal Mine is a private owned company in Iran and contains anthracite coal. Besides the overall daily activity planning, I was responsible for the mining path of the pit activities; the positioning of the mining equipments, coal specification check, reporting the amount of coal and waste extraction and used explosive material on a monthly basis to Iranian Mining Engineering Organization. As project manager I was responsible for controlling the drilling & blasting contractors` procurement.

  • 1 year and 3 months, Aug 2008 - Oct 2009

    Researcher

    Miduk Copper Complex

    Miduk Copper Complex is an open pit mine with 0.2% copper cut of grade which includes an 800 t/h capacity enrichment plant. My M.Sc. thesis was a research at Miduk`s Copper Concentrator on SAGMill performance optimization to achieve lowest fine particles in SAGMill`s production and power draw. I did a separate experimental design on four variable parameters to simulate each parameter effect on its treatment. I also calculated some grinding parameters such as (SPI, BBMI, etc).

  • 9 months, Apr 2007 - Dec 2007

    Researcher

    Advance Mineral Processing Research Center of Karaj, Iran

    I did a free research on Dust’s Elemental Sulphur enrichment of Sarcheshmeh Copper Mine which is produced from stack’s melting factory via Flotation Method. I also researched on dust’s milling and elemental sulphur separation which is used at sulphuric acid plants. Furthermore, I tried to predict dust’s milling behaviour and mill’s power draw.

Ausbildung von Ali Moaveni

  • 2 years and 3 months, Sep 2013 - Nov 2015

    Mineral Processing

    Montan University

  • 3 years and 9 months, Jan 2007 - Sep 2010

    Mineral Processing Engineering

    Science and Research University of Tehran

    Mineral Processing, Beneficiation, Separation, Raw Material Enrichment

  • 4 years and 10 months, Sep 2001 - Jun 2006

    Mining Engineering (Exploitation)

    University of Yazd

    B.Sc. Degree in Mining Engineering- Exploitation Thesis: Investigation on Photovoltaic cells usage for mines supply

Sprachen

  • English

    C1 (Fließend)

  • German

    B1-B2 (Gute Kenntnisse)

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 21 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z