Alvar Castello

está dedicándose a investigaciones especializadas.

Bis 2015, Chief Power & Electrical Engineer, Eurocement Holding (Russia)

Abschluss: MBA, Graduate School of Management, Saint Petersburg (Russia).

Saint Petersburg, Russische Föderation

Fähigkeiten und Kenntnisse

Electrical Engineering
Project management
Electromechanical engineering
work effectively in a team
Flexibility
Fast adaptability
consulting engineering
Power Plant Engineering
Multicultural experience
Multicultural awareness
to work in a multi-cultural
international experience
Technik

Werdegang

Berufserfahrung von Alvar Castello

  • 1 Jahr und 4 Monate, Juni 2018 - Sep. 2019

    Business & Project Consulting Engineer

    LIN INDUSTRIAL (Russia)

    Feasibility analysis, Business case and Business Model proposal for Taimyr-MHD ultralight class rocket, designed for injection into the orbit (160 – 500 km) of the various configurations of Micro and Nano-Satellites < 100kg.

  • 1 Jahr und 7 Monate, Jan. 2016 - Juli 2017

    Manager

    Local hospice ( Spain)

    Charity volunteering manager work for homeless people (local hospice)

  • 1 Jahr und 3 Monate, Juli 2014 - Sep. 2015

    Chief Power & Electrical Engineer

    Eurocement Holding (Russia)

    Provision of technical consultancy and engineering design in the field of power generation (Captive Power Plants), distribution, large drives and automation, for the upgrading program of the existing 12 cements plants of holding company (Russia – CIS). Preparation of technical specifications, tendering, project design & supervision

  • 8 Monate, Juli 2013 - Feb. 2014

    Electrical Engineer

    CESA Cement Engineering (Switzerland)

    Electrical Engineering in the field of power distribution, large drives and process automation. Supervision of acceptance tests, commissioning and start-up. Preparation of technical specifications. Provision of technical consulting and engineering commissioning at the Nouvelle Cimenterie du Bénin (NOCIBE) project (Benin)

  • 8 Monate, März 2012 - Okt. 2012

    Project Engineer

    Areva (Germany)

    Operational & Technical feasibility studies, Market Approach & Development of Non-Destructive Testing (NDT) method of Long Range Ultrasonic Test: Guided Waves, to asses steam pipelines condition in Power Plants. Resulting in the conception of NDT packages of optimally combined inspection methods, with in a significant reduction in time and associated costs.

  • 1 Jahr und 1 Monat, Okt. 2010 - Okt. 2011

    Export Manager

    TECNICS CARPI GRUPOS ELECTROGENOS S.L. ( Spain)

    Responsible for the commercial & technical management of generators set systems, projects and operations within the internationalization program of the company. Market prospection and commercial contacts established in all target markets identified in the expansion plan.

  • 11 Monate, Dez. 2008 - Okt. 2009

    Operations Manager & Lead

    Cegelec (Spain)

    Responsible of the technical and commercial firm operational works at the Nuclear Power Station of Santa Maria de Garoña (Spain) on behalf the Nuclenor SA, namely:  Project and team management of correctives & preventive maintenance operations at the refuelling and on-going operational works program.  Financial & commercial project responsibilities and deliveries within budget and deadlines.

  • 1 Jahr und 10 Monate, Feb. 2007 - Nov. 2008

    Senior Electrical Engineer

    Atkins Energy (United kingdom)

    Provision of design engineering & management behalf of British Energy and British Nuclear Group: - Redesign of the electrical LV system at the N.P. Bradwell in order to create 6 areas completely independents of electrical supply, according the requirements of its decommissioning program - Analysis of the hazards & interlocks relating to the Refuelling Safety Cases for N.P. Hinckley B and Hunterston B (UK). Proposed updates to comply with the criteria of the Nuclear Safety regulations

  • 3 Jahre und 3 Monate, Nov. 2003 - Jan. 2007

    Design Engineer

    UNITED KINGDOM ATOMIC ENERGY AUTHORITY - UKAEA (United kingdom)

    Engineering design & management of projects within UKAEA’s decommissioning program at NP of Dounreay : - Site investigation, project design and customer liaison for modernisation of the filtration system on the ventilation inlet to an irradiated fuel cave. Detail design followed the proposal with 20 % cost reduction - Study, engineering design from concept to detail, for system of a storage cave of irradiated fuel . Cost reduction by successfully converting the atmosphere within with dried air

Ausbildung von Alvar Castello

  • 2 Jahre und 1 Monat, Sep. 2019 - Sep. 2021

    Doctoral studies in Management

    Graduate School of Management, Saint Petersburg (Russia).

    Business and Management

  • 2 Jahre, Aug. 2017 - Juli 2019

    Master in Managment

    Graduate School of Management, Saint Petersburg (Russia).

    Business and Management - Information Technologies & Innovation Management

  • 1 Jahr und 1 Monat, Sep. 2011 - Sep. 2012

    International Master in Business, Product & Service Management

    POLYTECHNIC UNIVERSITY OF VALENCIA (Spain) & HOCHSCHULE ANSBACH (Germany)

    Business, Product & Service Management

  • 4 Jahre und 9 Monate, Sep. 1997 - Mai 2002

    Higher Industrial Engineer degree

    POLYTECHNIC UNIVERSITY OF VALENCIA (SPAIN)

    Industrial Engineering : general engineer - Environmental Major

  • 11 Monate, Sep. 1996 - Juli 1997

    Master in Electrical Engineering

    ECOLE CENTRALE DE LYON (France)

    Electrical Engineering

  • 3 Jahre und 10 Monate, Sep. 1992 - Juni 1996

    Technical Industrial Engineer degree

    POLYTECHNIC UNIVERSITY OF VALENCIA (SPAIN)

    Electrical engineering

Sprachen

  • Spanisch

    Muttersprache

  • Englisch

    Fließend

  • Französisch

    Fließend

  • Italienisch

    Gut

  • Deutsch

    Grundlagen

  • Russisch

    Gut

Interessen

Sports
Music
willingness to travel
Reading

21 Mio. XING Mitglieder, von A bis Z