Dena Mihai-Costel

Bis 2021, Lead Mechanical Engineer – Water & Power Plant, HAYA Power & Desalination Company
Ovidiu, Romania

Fähigkeiten und Kenntnisse

Mechanical Engineering
Construction
Power plant
Gas Turbines

Werdegang

Berufserfahrung von Dena Mihai-Costel

  • 1 year and 11 months, Jul 2019 - May 2021

    Lead Mechanical Engineer – Water & Power Plant

    HAYA Power & Desalination Company

    • Coordinating the mechanical team; • Approve construction procedures, quality plans and technical solution for site nonconformities; • Ensure that the Contractor executes the work in accordance with approved documents.

  • 1 year and 8 months, Aug 2017 - Mar 2019

    Lead Mechanical Engineer – Entire Plant

    Shinas Generating Company

    • Coordinating the mechanical team; • Approve construction procedures, quality plans and technical solution for site nonconformities; • Ensure that the Contractor executes the work in accordance with approved documents.

  • 11 months, Jan 2016 - Nov 2016

    Lead Mechanical Engineer

    Shamal Az-Zoor Al-Oula K.S.C.

    Coordinating a team consists of BOP Lead Engineer and 3 Mechanical Inspectors; Approve construction procedures, quality plans and technical solution for site nonconformities; Ensure that Contractor executes the work in accordance with approved documents

  • 1 year and 3 months, Oct 2014 - Dec 2015

    Lead Mechanical Engineer

    Fichtner Consulting Engineers

    Coordinating a team consists of BOP Lead Engineer and 3 Mechanical Inspectors; Approve construction procedures, quality plans and technical solution for site nonconformities; Ensure that Contractor executes the work in accordance with approved documents

  • 10 months, May 2013 - Feb 2014

    Lead Mechanical Engineer

    Fichtner Consulting Engineers

    Ensure that Contractor executes the work in accordance with the approved construction drawings, quality plans and procedures; To accomplish the Final inspections for the purpose of issuing Erection Completion Certificate (ECC) for the following equipment: Four (4) SGT5-4000F gas turbine; Two (2) SST5-4000F steam turbines; Four (4) Outdoor heat recovery steam generators (HRSG)

  • 1 year and 5 months, Oct 2011 - Feb 2013

    Mechanical TOP Engineer

    Mitsubishi Corporation

    Checking and approving the Mechanical and Piping End of erection documentation from Subcontractors. Preparing the Mechanical section of the Turn-over packages (including the boundaries mark-up in the P&IDs’)

  • 2 years and 2 months, Apr 2009 - May 2011

    Senior Mechanical Engineer

    Cement Project Services Management & Consulting Ltd. (CPS)

    Responsible for Mechanical Erection Control and Commissioning works related to whole 1.6 million tones/year Cement Plant and a 45 MW Captive Power Plant.

  • 2 years and 6 months, Oct 2006 - Mar 2009

    Rotating Equipment Engineer

    Chiyoda Technip Joint Venture (CTJV)

    The supervision and coordination of erection works, daily and weekly progress meetings with participation of Ras Gas (client), CTJV, GEOG (equipment vendor) and CCIC (subcontractor). Preparation of engineering documentation for construction activity (Site Instruction, TIC, FDC, test packs, etc.).

  • 1 year and 11 months, Oct 2004 - Aug 2006

    Mechanical Engineer

    Fushe Kruje Cement Factory – Albania

    Responsible for Mechanical Erection Control and commissioning works related to a 1.3 mio tonne/yr dry process cement plant and a 24MW captive power plant.

  • 2 years and 4 months, Jun 2002 - Sep 2004

    Equipment Supervisor

    Cernavoda 2 Nuclear Power Plant. Management Team, Turbo-Generator

    Supervision of installation of the 700 MW Turbo-generator (General Electric design). Supervision of installation of Condenser of steam piping from Turbine to Condenser; welding of Condenser to Low Pressure Stage external housings, and of steam intake piping to the internal housings of the Low Pressure stages (700 MW).

  • 1 year and 4 months, Feb 2001 - May 2002

    Equipment Supervisor

    S.C. Nuclearmontaj S.A., Cernavoda 2 Nuclear Power Plant, Romania

    Coordination of installation activities for process equipment: vertical and horizontal pumps, heat exchangers, etc. Coordination of erection activity for steel structures in the Reactor Building.

Ausbildung von Dena Mihai-Costel

  • Polytechnic Faculty of the University of Bucharest

Sprachen

  • English

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 21 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z