Dr. Eman Bassiouny Rohayem

Freiberuflich, Project management consultant, Oil and energy sector

Frankfurt am Main, Deutschland

Fähigkeiten und Kenntnisse

Project management
quality control /quality assurance
research and development
engineering auditing
technical instructor
bidding
Bushiness developer
Technical developer
Green energy
Electrical
Business Intelligence

Werdegang

Berufserfahrung von Eman Bassiouny Rohayem

  • Bis heute 11 Jahre und 7 Monate, seit Dez. 2012

    Project management consultant

    Oil and energy sector

    • Participate and supervise the different phases of the projects starting from the initiation passing through planning, execution, monitoring & controlling and finally close out of the projects. • Review the contract and the scope of the work. • Manage different types of electrical power supplies philosophies including the conventional power plant and renewable power farms/plants. •

  • 1 Jahr und 1 Monat, Nov. 2011 - Nov. 2012

    technical team leader

    Baker Hughes Incorporated

    • Manage activities of maintenance area to support the production and the operation plan. • Develop and manages budget compliance, make recommendations on work place facility and tooling requirements. • Coordinate specifications and procurement of capital expenditures. • Responsible for planning, coordination and direction of all maintenance operations, up to and including installation of equipment, preventative maintenance and facility/equipment repair to support operations. •

  • 1 Jahr und 1 Monat, Okt. 2010 - Okt. 2011

    Lead Electrical Engineer

    British Petroleum (BP)

    • Review the contract and the scope of work of electrical /electromechanical duties and all intervention with other disciplines. • Issue a new design philosophy of feed and detailed stages for new phases in the project include the conceptual layout of the external and internal electrical networks. • Issue and review calculations, specifications, data sheets, material take off and material requisitions for all electrical equipment/systems

  • 1 Jahr und 1 Monat, Sep. 2008 - Sep. 2009

    Project Manager Coordinator

    El-Sewedy for Wind Generation (SWEG)

    • Analyze and identify the objectives and events of the contact and bidding of the wind farm project in all phases (engineering, procurement and construction). • Assess and control risk (or Risk Management) and assess all bottom necks in the initiation and during the contracting stage. • Estimate resources and bidding stage. • Acquire human and material resources. • Coordinate with Spanish partnership and implement Spanish code to be adapted with IEC.

  • 1 Monat, Aug. 2008 - Aug. 2008

    Electrical Power Group Leader

    Dar Al-Handasah, Cairo, Egypt

    • Preparation scope of work to be included in the concept report. • Ensured that the development drawings are checked and completed in an efficient and timely manner.

  • 5 Jahre und 10 Monate, Okt. 2001 - Juli 2007

    Senior Electrical Engineer

    Petrojet

    Perform engineering preview and auditing , Building of Chain of supply ,Review the construction follow up !

  • Free Lancer - project manager/Inspector /quality auditor

    Consultation services for some firms and individual lints

    • Review the contract, specification and the operations criteria of the different required systems such as: the automation, control, telecommunication, process and electrical systems. • Determine the commercial changes/purchase orders which correspond to any engineering changes/deviations. • Determine the different types of spare parts.

Ausbildung von Eman Bassiouny Rohayem

  • 2 Jahre und 8 Monate, Jan. 2010 - Aug. 2012

    “RELIABILITY ASSESSMENT OF ELECTRICAL POWER SYSTEMS.

    Al-Azhar university

    The main object of this PhD research described is to demonstrate, analyze the reliability indices of the electric composite systems and evaluate the effect of integrating the distributed generation units such as wind generation farms combined cycle gas turbines (CCGT)

  • 5 Jahre und 3 Monate, Feb. 2001 - Apr. 2006

    IMPACT OF DISTRIBUTED GENERATION ON POWER SYSTEM

    Ain Shams university

    The main objective of this master research is to realize the benefits that can be obtained when applying the principle of distributed generation (DG) in electrical power systems.

  • 5 Jahre und 1 Monat, Juli 1995 - Juli 2000

    Electrical power Engineering

    Ain Shams University

    Electrical power engineering and machines

Sprachen

  • Englisch

    Fließend

  • Arabisch

    Muttersprache

  • Deutsch

    Gut

21 Mio. XING Mitglieder, von A bis Z