Berufserfahrung von Fried Krom

  • Bis heute 7 Jahre und 7 Monate, seit 2018

    PMO Project Controls

    Aurubis AG Hamburg

    Overall Project Controls Management of the FCM project which consists of four new plants in Hamburg Germany and one in Olen Belgium. TIC 0,6 billion Euro. - Managing the PMO Project Controls team during the design and Construction.

  • Bis heute

    Project Controls Manager

    morK B.V.

    Owner morK B.V.

  • 2016 - 2017

    Project Controls Manager

    Fluor

    2016: Development of a Lump Sum proposal, together with two Korean JV Partners, for the Bapco Bahrain Modernization Program. TIC ~5 billion Euro. - Responsible for all JV Project Controls proposal activities. 2017: Overall Project Controls Management of the Gunvor CAPEX portfolio. TIC 0.5 billion Euro. - Implementing Project Controls procedures into the Gunvor organization. - Responsible for all CAPEX portfolio Project Controls activities.

  • 2013 - 2015

    Project Controls Manager

    Shell International / NAM

    Project Controls Manager for NAM / Shell Norg Under Ground Storage (UGS) Expansion project for the Nederlandse Aardolie Maatschappij B.V. PTE/SEMA. Shell Projects & Technology. TIC 0,8 billion Euro. Norg The Netherlands - Interim Project Controls Department Manager NAM’s Groningen assets.

  • 2011 - 2013

    Project Controls Manager

    Nuon

    Project Controls Manager for FIP Magnum VOP Nuon Vattenvall Magnum Project MHI Powerplant ( 3x 400 MW), FIP Magnum VOF (F) Fabricom – GDF Suez, (I) Irem spa, (P) Ponticelli Frères. TIC 1,8 billion Euro. Eemshaven, The Netherlands

  • 2008 - 2011

    Project Controls Manager

    N.V. Nederlandse Gasunie

    Project Controls Manager for N.V. Nederlandse Gasunie LNG import terminal on the Maasvlakte Rotterdam. The terminal had been developed as a 12 BCMA facility, 3x 180.000 m3 storage tanks, 2 jetties (up to Qmax size) and all auxiliary equipment. Synergies with neighboring sites (e.g. warm water from E.On) formed an inseparable part of the project. TIC of 1,0 billion Euro. - Interim Finance Manager of the NV Nederlandse Gasunie’s satellite offices.

  • 2005 - 2008

    Project Controls Manager

    Fluor

    In alliance executed project. The facilities and the work involved are a new mild hydrocracking unit and associated facilities such as new amine recovery unit, sour water stripper, hydrogen plant and sulphur recovery including a tail gas treating unit. Revamp design of existing crude units like middle distillate desulphurization units, visbreaking unit and modifications to utilities and offsites are performed. Bayernoil ISAR project; Neustadt / Vohburg Germany Target price contract with a TIC of EUR 600MM

  • 2002 - 2005

    Project Controls Manager

    Fluor

    In partnership with Uhde GmbH executed projects consisting of extended basic engineering, detailed engineering executed mainly with Fluor’s engineering center in Poland, procurement and construction management for two main production facilities, being the Methionine or ME-2 project, the Acrolein and Methyl Mercaptan or ACMC project and Infrastructure. Degussa-Antwerp N.V. ; ME-IV Project Belgium Target price contract with a TIC of EUR 350MM.

  • 1999 - 2002

    Project Controls Manager

    Fluor

    In alliance with client and contractors executed projects : Gasoline-Desulphurization, Amine, Demin water, Guard bed Reactor, Hydro-cracker, Tank-park, CD-Hydro, Etherification, Steam-boiler, Cooling-Water and Infrastructure. Ruhr Oel GmbH / Veba Oel A.G. ;Auto Oel Programm II (AOP II) / Veretherung / Hydrocracker Gelsenkirchen, Germany TIC EUR 250MM.

  • 1997 - 1998

    Project Controls Manager

    Stork Comprimo SKL GmbH

    In Joint-Venture with BSL/DOW executed projects consisting of several reimbursable projects; revamps, grassroots and construction; +/- 2.5 million man-hours; value +/- USD 150 million. Assigned to branch office Magdeburg Germany

  • 1995 - 1997

    Project Controller

    Stork Comprimo Engineers & Contractors B.V.

    Food processing plant; basic design Jackson Tennessee USA; detailed design and construction Mechelen Belgium; value +/- USD 250 million. Assigned with Proctor & Gamble. Responsible for cost control, change management and accounting. Jackson Tennessee USA / Mechelen Belgium

  • 1992 - 1993

    Cost Engineer

    Comprimo B.V.

    Reimbursable incentive fee project covering all engineering, procurement and construction management services; value +/- USD 50 million. NAM Peakshaver/underground gas storage facilities Grijpskerk the Netherlands Responsible for all engineering cost control activities.

  • 1992 - 1992

    Field Piping Supervisor

    Comprimo B.V.

    Shell LPG Loading Facilities; Port Dickson, Malaysia

  • 1990 - 1992

    Mechanical Engineer

    Comprimo B.V.

    Engineer static equipment

  • 1989 - 1990

    Lieutenant officer Logistics

    Royal Dutch Army

    Militairy Service; Royal Dutch Army

  • 1988 - 1989

    Trainee

    South African Railways

    Trainee; Pretoria South Africa

Ausbildung von Fried Krom

  • 1984 - 1989

    Mechanical Engineering / Business Administration

    Technische Hogeschool Amsterdam

    BSc, Mechanical Engineering / Business Administration

Sprachen

  • Niederländisch

    Muttersprache

  • Englisch

    Fließend

  • Deutsch

    Fließend

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z