Dr. Gürkan Uygur

Angestellt, Process Manager and Scrum Master, Elektrobit Automotive GmbH in Erlangen-Tennenlohe

Nürnberg, Deutschland

Fähigkeiten und Kenntnisse

Change Management
Change Requests
Change Request Management
Requirements Engineering
Requirement Management
Quality Management
Quality Assurance
Problem-Management
Demand Management
Demand analysis
Demand Planning
Automotive SPICE
Test Management
Test Automation
Automated Testing
Risk Management
Risk Analysis
Linux
Ubuntu
Realtime
Real-Time Systems
Realtime Data Access
Real-time programming
Real-time clock
Real-time operation
Confluence
Atlassian Confluence
Atlassian Jira
Production management
production test
Reliability
Reliability Engineering
Computer Science
Computer Engineering
Electrical Engineering
Process Optimization
Scrum Master
Professional Scrum Master
Certified Scrum Master
Team Coaching
Team-Coaching
Coaching von Teams
Team Leading
Team Lead
Team leadership
KANBAN
Capacity Planning
Capacity Management
Agile Methods
Agile Development
Agile Software Development
Scaled Agile Framework
Strategic planning
Flow
Optimisation
Optimization
Test and Measurement
Measurement
Measurement, control and regulation technology
Risk measurement
Precision Measurement
Project Planning
Quality Planning
Workflow Management
Workflow Analysis
Workflow Configuration
Workflow Automation
Workflow Management System
Lifecycle Management
Application Lifecycle Management
Software Development Lifecycle
Life-Cycle Costing
Product Lifecycle Management
Development Lifecycle
Dashboards
KPI Dashboards
KPI-Entwicklung
KPI-Definition
KPI Entwicklung
Quality Improvement / QA
Process Improvement
Continuous Improvement
Quality Improvement
Production improvement
Continuous Process Improvement
Process Engineering
Processing
Process Development
Data processing
efficient working methods
work and collaborate efficiently
time-efficient manner
Customer Relationship Management
Customer Support
Customer Experience Management
Customer Relations
Customer orientation
Solution Architecture
System Architecture
Change Control
Reporting
Management Reporting
Performance Reporting
Thresholding
Review
Code Reviews
Design Review
Reviews
Design-Reviews
Code-Reviews
stages
Project Quality Management
Quality Management Systems
Quality System Management
Implementation of processes
Guidelines
Scrum Product Owner
Software Architecture
Agile Software Development Methodologies
Agile Softwareentwicklungsprozesse
AUTOSAR
Embedded C
Digitalization
Digital Content Creation
Digital analytics
Digital strategy
Digital Trends
Automation
Automated Software Testing
Data Science
Data Analysis
Data Management
Data Modeling
Data Modelling
Data Model
self-management
Self-organization
Diagnostic
Diagnostic systems
Microcontroller
Embedded Microcontroller
Micro-Controller Operating System
PIC Microcontroller
Clean Room
Formal Specification
Formale Spezifikation
Formalität
Concept
Concept development
Conceptual thinking
Conceptual design
Conceptual model
Data Structures
Structured analysis
Modelling
UML
UML Modelling
UML2
Modell (UML)
Communication Diagram (UML)
Modellierung mit UML
Theoretical computer science
Graph Theory
Systems theory
Theory of numbers
Simulation
Numerical Simulation
Computer simulation
Hardware Testing
Embedded Systems
Failure Mode and Effects Analysis
Failure Mode, Effects and Criticality Analysis
Failure Mode and Effects and Criticality Analysis
Accuracy
Accuracy and precision
high level of accuracy
focus on accuracy
Resource Management
Management of resources
Resources Management
Retrofit
Robotics
Robotic Process Automation
RPA (Robotic Process Automation)
Data Flow Control
Maximale Laufzeit
Multidimensional Expressions
Genetic algorithms
Adjust
Module
Python
Hardwarenahe Programmierung
Assembler
Test Systems

Werdegang

Berufserfahrung von Gürkan Uygur

  • Bis heute 5 Jahre und 7 Monate, seit Dez. 2018

    Process Manager and Scrum Master

    Elektrobit Automotive GmbH in Erlangen-Tennenlohe

    Scrum-Master und Team-Coach des Solution-Architekten Teams, Change Request Manager und Change Manager, Change Request Management Prozess Owner und Change Management Prozess Owner, Change Control Board (CCB) Manager, Requirements Manager und Requirements Management Prozess Gutachter, Mitglied des firmenweiten Qualitätsmanagementsystems

  • 12 Jahre und 3 Monate, Okt. 2006 - Dez. 2018

    Industrieprojekte und Promotion (Doktor-Ingenieur)

    FAU,Liebherr GmbH,Rohde&Schwarz GmbH,ATMEL GmbH,Melexis GmbH,Konrad-Tech GmbH

    Autonome Integrierte Analyse von Prüflingen für die Digitalisierte Produktion, Kombinatorisches asynchrones Design von Smartsensoren, Optimal-Konfigurierbare Test-Organisationsplattform mit Unterstützung der Synthese, Sicherheitskritische Schaltungen und Systeme, Industrie 4.0, Optimierung und Ressourcenmanagement, Digitaltechnik, Entwurf Integrierter Schaltungen, Automatenorientierter Entwurf Integrierter Schaltungen Zuverlässigkeit technischer Systeme, Leiter des Test-Teams, Parallele Komposition

21 Mio. XING Mitglieder, von A bis Z